[1]
|
R. Billinton, “Methods to Consider Customer Interruption Costs: Task Force 38.06.01,” Cigré, Paris, 2001.
|
[2]
|
G. Wacker and R. Billinton, “Customer Cost of Electric Service Interruptions,” Proceedings of the IEEE, Vol. 77, No. 6, 1989, pp. 919-930. http://dx.doi.org/10.1109/5.29332
|
[3]
|
R. Billinton, et al., “Methods to Consider Customer Interruption Costs in Power Systems Analysis,” CIGRE Task Force Report, Cigré, Paris, 2001.
|
[4]
|
G. Kjolle, K. Samdal, B. Singh and O. Kvitastein, “Customer Costs Related to Interruptions and Voltage Problems: Methodology and Results,” IEEE Transactions on Power Systems, Vol. 23, No. 3, 2008, pp. 1030-1038. http://dx.doi.org/10.1109/TPWRS.2008.922227
|
[5]
|
K. Kivikko, A. Makinen,P. Jarventausta, A. Silvast, P. Heine and M. Lehtonen, “Comparison of Reliability Worth Analysis Methods: Data Analysis and Elimination Methods,” IET Generation, Transmission & Distribution, Vol. 2, No. 3, 2008, pp. 321-329. http://dx.doi.org/10.1049/iet-gtd:20060532
|
[6]
|
A. Silvast, P. Heine, M. Lehtonen, K. Kivikko, A. Makinen and P. Jarventausta, “Customer Interruption Costs in Finland,” Teknillinen Korkeakoulu, Tampereen Teknillinen Yliopisto, Korkeakoulunkatu, 2005.
|
[7]
|
R. Billinton, G. Tollefson and G. Wacker, “Assessment of Electric Service Reliability Worth,” Third International Conference on Probabilistic Methods Applied to Electric Power Systems, London, 3-5 July 1991, pp. 9-14.
|
[8]
|
K. Samdal, G. H. Kjolle, B. Singh and O. Kvitastein, “Interruption Costs and Consumer Valuation of Reliability of Service in a Liberalized Power Market,” 9th International Conference on Probabilistic Methods Applied to Power Systems, Stockholm, 11-15 June 2006, pp. 1-7.
|
[9]
|
M. J. Sullivan, M. Mercuiro and J. Schellenberg, “Ernest Orlando Lawrence Berkeley National Laboratory,” 2009. http://certs.lbl.gov/pdf/lbnl-2132e.pdf
|
[10]
|
M. Lehtonen, P. Heine, A. Silvast, K. Kivikko, A. Makinen and P. Jarventausta, “Customers’ Outage Costs in Electrical Distribution Networks,” 5th International Conference Electric Power Quality and Supply Reliability, Viimsi, 23-26 August 2006, pp. 87-91.
|
[11]
|
Public Service Company of Colorado, “2003 Least-Cost Resource Plan,” Volume 4 of 4, Technical Appendix, Public Service Company of Colorado, Denver, 2004.
|
[12]
|
J. Eto, L. Lawton, M. Sullivan, K. Van Liere and A. Katz, “A Framework and Review of Customer Outage Costs: Integration and Analysis of Electric Utility Outage Cost Surveys,” Report No. LBNL-54365, Lawrence Berkley National Laboratory, Berkeley, 2003.
|