Optimal Control and Bidding Strategy of Virtual Power Plant with Renewable Generation ()
1. Introduction
During the recent decades, the environmental concerns, increasing energy demand and economic consideration have led to increased renewable energy resources (RES) penetration worldwide, which results in a significant growth of renewable Distributed Generators (DG) in several power systems [1]. Renewable DGs may have the opportunities to participate in energy markets, however, due to the stochastic characteristics of RES, individual DGs is highly risky to meet the accepted schedules of the power system, which makes the market participate impossible.
In literature, researchers have adopted a variety of ways so far in order to optimize the performance of DGs in the existing power systems within the concept of smart grid. Among all, demand response (DR) and energy storage system (ESS) have proven to be the most significant factor for the deployment of the smart grid, since the challenges of the large-scale RES penetration can be relieved and the system reliability can be improved [2]. The installation of advanced metering infrastructure, which can deliver real-time electricity prices to consumers, can improve the efficiency for integration of intermittent resources into the electricity grid [3]. On the other hand, the quick response characteristic of ESS makes it as a valuable regulation resource to balance the negative effects of the RES [4].
The VPP concept, where generation of individual renewable DGs are aggregated into a single operating profile, is supposed to be an efficient way toward the successful coupling of RES with DR and ESS. In European project FENIX [5], the VPP concept is defined as “an aggregation of the capacity of many diverse distributed energy resource; it creates a single operating profile from a composite of the parameters characterizing each DER and can incorporate the impact of the network on aggregated DER output.” The aggregated DERs of a VPP can include renewable DGs and conventional power plants as well as DR and ESS schemes. Two types of VPP are described: the Commercial VPP (CVPP) and the Technical VPP (TVPP). The main difference between CVPP and TVPP is that CVPP does not consider the impact of the network, while TVPP takes into account the real-time influence of the local network on the portfolio.
Since a VPP can participate in the electricity market, it is essential that the owner of the VPP is able to determine the optimal control and bidding strategy of the portfolio with the aim to minimize its cost (or maximize its profit). Although the conduct is rich in optimization problems dealing with control and bidding strategy of a conventional power plant [6]-[8], there are a few researches addressing the same problem for a renewable power plant, or a VPP so far. The stochastic characteristics of RES makes it a challenging problem to reduce the market cost for VPP. Reference shows that scheduling dispatchable generators [9] [10] and deploying elastic demand [11] [12] can help reduce the imbalancing power caused by renewable uncertainties. From above, one promising way is to curtail some of the renewable generation to reduce the expensive imbalance cost [13] [14]. A recent work [15] has proven that in balancing market, however, it does not consider the optimization in day-ahead market. The research conduct shown in [16] includes the scheduling of power generated from renewable DGs, while it does not consider the balancing market since RES is usually used as a reserve capacity.
In the above framework, this paper proposes a novel control and bidding strategy for VPP in both day-ahead and balancing market. The problem is formed as a stochastic bi-level optimization model of a CVPP, which comprises distributed generation (wind farm) and inelastic consumers (residential and/or commercial load) and aims at the minimization of its cost (or maximization of its profit). This model offers the VPP owner determination of the optimal renewable power usage and day-ahead bids for each time unit of the coming day. The uncertainty lies in the DER production is covered by applying the coordinated strategy, which limits the renewable generation as a function of demand. Comparison is made with two other commonly used control strategy: (1) the greedy strategy, which fully utilizes the renewable power; (2) the absolute strategy [17], which limits the renewable generation by a predefined value. Moreover, the market costs under VPP and non-VPP frameworks are investigated and compared.
The main contribution of this paper are as follow. 1) A novel control strategy on renewable generation is introduced in order to reduce the market cost of VPP; 2) A stochastic bi-level optimization model is formulated and solved for the minimization of the VPP’s market cost.
The rest of the paper is organized as follows. Section 2 presents the VPP configuration and control strategy. Section 3 formulates the optimization problem. Section 4 provides numerical results from the application. And finally section 5 concludes the paper.
2. Model and Control Strategy Description
2.1. Model Description
In the proposed model, it is assumed that all DG units included in the VPP have granted to the VPP owner, where owner can receive the forecasted information and has a direct control on each unit. As a result, the owner submits offer/bids for generation or consumption based on the whole profile’s operational constraints and estimation. To simplify the model, all wind farm of the VPP are aggregated into a single wind farm, and all consumers are combined into a single load entity. Since in the VPP framework individual generator and demand unit does not present a complex constraint, the simplification is acceptable and benefits for reducing the computational tractability. Figure 1 shows the CVPP portfolio structure and power flow transactions. Where PtW is the total wind generation information, PtW,a is the actual wind generation after control strategy, PtL is the total load demand information, and PtNet is the power exchange between the VPP and the external grid.
Figure 1. CVPP Protfolio structure and power flow transactions.
2.2. Control Strategy
As described in Section 1, In order to reduce the imbalance cost of the VPP system, control strategies are applied to curtail some wind generation. Since the ESS is not considered in the model, the unused wind generation is spilled. Therefore, three control strategies are introduced in the following.
1) Coordinated Strategy: This strategy limits the ratio of wind generation to demand at time t by a predefined upper limit δt, i.e.
(1)
where A is the upper bound constant of the ratio between wind generation and load demand. It means if the wind generation is above the predefined limit, the spilled power will be curtailed, otherwise if the wind generation is lower than the constant, it will be fully utilized. This strategy shows a characteristic of DR since it benefits from the relationship between generation and load. The wind generation information PtW can be identified from historical data.
2) Greedy Strategy: This strategy always fully utilizes wind generation at time t, where
(2)
3) Absolute Strategy: This strategy limits the wind generation itself at time t by a predefined upper bound constant εt, i.e.
(3)
where PtW,C is the maximum capacity of the total wind generators. The only difference between coordinated strategy and absolute strategy is that absolute strategy has no consideration about the demand side.
3. Market Formulation
The market model described below is based on the Nord pool. Power contract of a minimum of one-hour duration are traded in the day-ahead market, then any imbalancing issues are paid as an upward regulation (increased generation or reduced consumption) or downward regulation (decreased generation or increased consumption) price in the balancing market [18].
In the model, assuming the VPP participate into the market as a price taker. It submits the hourly bid Bt for the next day, then any imbalancing penalty Ctp between Bt and PtNet at time t is settled in the balancing market. The market cost of VPP CtVPP can be formulated as
(4)
where is the spot price at time t. The imbalancing penalty Ctp can be defined as a function of the deviation, , between the power exchange and bid, and the upward regulation price or downward regulation price,
(5)
(6)
where and are the differences between the spot price and the upward/down- ward regulation prices.
The stochastic characteristics of market price can be formulated as a random vector. i.e.
(7)
where are independent random variables.
As the objective of the VPP is to minimize the total cost, it is necessary to make the optimal bids in the market. In the above framework, the problem can be formulated as a stochastic bi-level optimization problem, i.e.
(8)
where objective function
(9)
where is the probability density function of.
4. Case Study
The proposed control and bidding strategy has been tested for a CVPP portfolio including wind farms and load at a total capacity of 30MW, and it is considered to participate in the electricity market under Nord Pool system, with a time unit of 1 hour.
The forecast wind generation and demand data are obtained from the historical database by Elia [19], and all data are scaled down to meet the required 30MW install capacity. The historical data of market system including spot, upward/downward prices are gathered from the Nord Pool [20]. Other parameters are defined in Table 1.
The result of three control strategies: the coordinated strategy (C), the greedy strategy (G) and the absolute strategy (A), are proceed in the case. For each strategy, the optimization problem is solved and results are summarized in Table 2. It can be seen that by applying both C and A, the total cost of the VPP is lower than fully wind power utilized strategy, G.
To compare the three strategies in detail, the cost differences between the C/A and G in each hour is plotted in Figure 2. It can be seen that both C and A save money in the case study. Moreover, the strategy C performs almost 3 - 5 times better than A, which
Figure 2. Cost difference between C/A and G for each hour.
Table 2. VPP total cost for three control strategies.
makes it a better control strategy. These results show that by applying suitable control strategy, the VPP owner could benefit for low market cost. What’s more, the effect shown in the coordinated strategy presents the priority of the DR, which is an important advantage of the VPP concept.
A comparison of both VPP and non-VPP framework is also presented in the case study. In the same wind farm and loading conditions, participants in the market submit their bids individually in the non-VPP framework. As a result shown in Figure 3, under non-VPP model, the market cost is significant larger than those under VPP framework with three types of control strategies. It also demonstrates that coordinated strategy is the best control strategy for the given VPP framework.
5. Conclusions
This paper presents a novel control strategy for CVPP aggregated with RES, and a stochastic bi-level optimization model for the development of optimal bidding is created. Under these framework, the effect of the proposed control strategy is proven: the coordinated strategy, showing the principle of DR, saves more market cost for the CVPP system. The priority of VPP portfolio as a solution for Renewable DG management is also evaluated.
The proposed model can also be extended by adding ESS into the VPP portfolio as a future work, this technology combined with the control strategies will be evaluated. Based on that, it is necessary to extend the research to the aspect of TVPP, which considered the real-time influence of the local network.
Figure 3. Cost difference between VPP and non-VPP framework.
Acknowledgements
Y. Kang thanks to Prof. Kwoklun Lo for supervising the research project. I would also thank to my parents, who gives me fully support during my study.