[1]
|
I. Ali, M. F. Khan, Y. S. Raghav and A. Bari, “Allocating Repairable and Replaceable Components for a System Availability Using Selective Maintenance with Probabilistic Constraints,” American Journal of Operations Research, Vol. 1, No. 3, 2011, pp. 147-154.
doi:10.4236/ajor.2011.13016
|
[2]
|
W. F. Rice, C. R. Cassady and J. A. Nachlas, “Optimal Maintenance Plans under Limited Maintenance Time,” Proceedings of the 7th Industrial Engineering Research Conference, Banff, 9-10 May 1998.
|
[3]
|
C. R. Cassady, E. A. Pohl and J. Song, “Managing Availability Improvement Efforts with Importance Measures and Optimization,” IMA Journal of Management Mathematics, Vol. 15, No. 2, 2004, pp. 161-174.
doi:10.1093/imaman/15.2.161
|
[4]
|
R. Rajagopalan and C. R. Cassady, “An Improved Selective Maintenance Approach,” Journal of Quality in Maintenance Engineering, Vol. 12, No. 2, 2006, pp. 172-185.
doi:10.1108/13552510610667183
|
[5]
|
K. Schneider, L. M. Maillart, C. R. Cassady and C. Rainwater, “Selective Maintenance Decision-Making over Extended Planning Horizons,” IEEE Transactions on Reliability, Vol. 58, No. 3, 2009, pp. 462-469.
doi:10.1109/TR.2009.2026689
|
[6]
|
I. M. Iyoob, C. R. Cassady and E. A. Pohl., “Establishing Maintenance Resource Levels Using Selective Maintenance,” The Engineering Economist, Vol. 51, No. 2, 2006, pp. 99-114. doi:10.1080/00137910600695627
|
[7]
|
I. Ali, Y. S. Raghav and A. Bari, “Allocating Repairable and Replaceable Components for a System Availability Using Selective Maintenance: An Integer Solution,” Safety and Reliability Society, Vol. 31, No. 2, 2011, pp. 9-18.
|
[8]
|
I. Ali, Y. S. Raghav and A. Bari, “Integer Goal Programming Approach for Finding a Compromise Allocation of Repairable Components,” International Journal of Engineering Science and Technology, Vol. 3, No. 6, 2011, pp. 184-195.
|
[9]
|
I. Ali, Y. S. Raghav and A. Bari, “Compromise Allocation in Multivariate Stratified Surveys with Stochastic Quadratic Cost Function,” Journal of Statistical Computation and Simulation, 2011.
doi:10.1080/00949655.2011.643890
|
[10]
|
I. Ali, M. F. Khan, Y. S. Raghav and A. Bari, “Selective Maintenance in System Reliability with Random Costs of Repairing and Replacing the Components,” Communications in Statistics—Simulation and Computation, 2012.
http://www.tandfonline.com/doi/abs/10.1080/03610918.2012
|
[11]
|
M. F. Khan and I. Ali, “Allocation Problem of Repairable and Replaceable Components for a System Reliability using Selective Maintenance: An Integer Solution,” International Journal of Scientific and Engineering Research, Vol. 3, No. 5, 2012, pp. 1-4.
|
[12]
|
S. S. Rao, “Optimization Theory and Applications,” Wiley Eastern Limited, New Delhi, 1979.
|
[13]
|
V. J. Bowman Jr., “On the Relationship of the Tchebycheff Norm and the Efficient Frontier of Multiple-Criteria Objectives,” In: H. Thiriez and S. Zionts, Eds., “Multiple Criteria Decision Making,” Lecture Notes in Economics and Mathematical Systems, Springer-Verlag, Berlin, 1976, pp. 76-85.
|
[14]
|
K. M. Miettinen, “Non Linear Multiobjective Optimization,” Kluwer Academic Publishers, Boston, 1999.
|
[15]
|
A. P. Wierzbicki, “On the Completeness and Constructiveness of Parametric Characterizations to Vector Optimization Problem,” Operations-Research-Spektrum, Vol. 8, No. 2, 1986, pp. 73-87. doi:10.1007/BF01719738
|
[16]
|
M. T. Khasawneh, S. R. Bowling, S. Kaewkuekool and B. R. Cho, “A Cost-Effective Strength-Stress Reliability Modeling and Optimization in Engineering Design,” Proceeding of the Industrial Engineering Research Conference, Orlando, 19-21 May 2002.
|