Why Us? >>

  • - Open Access
  • - Peer-reviewed
  • - Rapid publication
  • - Lifetime hosting
  • - Free indexing service
  • - Free promotion service
  • - More citations
  • - Search engine friendly

Free SCIRP Newsletters>>

Add your e-mail address to receive free newsletters from SCIRP.

 

Contact Us >>

WhatsApp  +86 18163351462(WhatsApp)
   
Paper Publishing WeChat
Book Publishing WeChat
(or Email:book@scirp.org)

Article citations

More>>

H. S. Choi and J. H. Kim, “Construction Method of Main Cable for Suspension Bridges,” Magazine and Journal of Korean Society of Steel Construction, Vol. 20, No. 2, 2008, pp. 79-86.

has been cited by the following article:

  • TITLE: Development of Highly Efficient Construction Technologies for Super Long Span Bridge

    AUTHORS: Hee Seok Kim, Young Jin Kim, Won Jong Chin, Hyejin Yoon

    KEYWORDS: AS Equipment; PPWS Equipment; Slip Form System; Large Scale Foundation

    JOURNAL NAME: Engineering, Vol.5 No.8, August 6, 2013

    ABSTRACT: This paper presents highly efficient cable erection equipments and methods related to the construction of super-long-span bridges, construction technology of high towers and, technology for offshore foundations currently developed through a R&D on accelerated and cost-saving construction technology for long-span cable bridges to secure our international competitiveness. In the field of cable erection technology, AS and PPWS equipments for highly efficient erection of cable longer than 2000 m, world-class clamping bolt tensioning equipment and shape control system for super-long cable are under development. The technologies developed in the domain of construction of towers are tapered slip form system for the construction of 400 m high tower, shape and erection precision control of elevated tower and, lightweight and modular formwork for slip form system. In the domain of foundation construction, remote controlled survey equipment and analysis system for water-depth of 100 m and depth of 50 m, prediction and evaluation technology of optimal load carrying capacity and settlement complying with international standard and, highly efficient hybrid foundation construction technology suitable for ground acceleration of 0.5 g and deep soft soil are currently developed.