Article citationsMore>>
Bisadi, V. and Padgett, J.E. (2015) Explicit Time-Dependent Multi-Hazard Cost Analysis Based on Parameterized Demand Models for the Optimum Design of Bridge Structures. Computer-Aided Civil and Infrastructure Engineering, 30, 541-554.
https://doi.org/10.1111/mice.12131
has been cited by the following article: