[1]
|
Wang, R., Ji, H.S., Lou, H.Y., Zhu, R.Z., et al. (2013) Discussion on the Post-Evaluation Method Step of Wind Farm Generation. Electric Power, 46, 54-59.
|
[2]
|
Peng, H.W. and Wang, X.L. (2009) Discussion on Post Evaluation of Wind Farm Design. Renewable Energy Resources, 27, 97-99.
|
[3]
|
Yang, Y.H. and Li, X.D. (2008) Study of Theory and Method for Post-Evaluating of Wind Power. Journal of North China Electric Power University (Social Sciences), 3, 6-9.
|
[4]
|
Lv, T., Zhang, L.S., Li, Z. and Dong, L. (2006) Application of the Analytic Hierarchy Process to Economic Performance Evaluation of Wind Farm Operation. Electric Power, 39, 42-44. http://dx.doi.org/10.1109/TSG.2013.2258048
|
[5]
|
Yang, W. (2010) Study on Post-Evaluation of Wind farm Design. Ms.D. Thesis, North China Electric Power University, Beijing.
|
[6]
|
Jiang, G.X. (2009) Study on Post-Evaluation of Wind Resource and Generated Energy in Wind Farm Design. Ms.D. Thesis, North China Electric Power University, Beijing.
|
[7]
|
General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China (2002) GB/T18710-2002. Methodology of Wind Energy Resource Assessment for Wind Farm. Standards Press of China, Beijing.
|
[8]
|
General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China (2005) GB/T18709-2002. Methodology of Wind Energy Resource Measurement for Wind Farm. Standards Press of China, Beijing.
|
[9]
|
National Development and Reform Commission (1997) DL/T 5067-1996. Code on Compiling Feasibility Study Report of Wind Power Projects. Standards Press of China, Beijing.
|
[10]
|
Wei, G., Wang, F., Zhang, Y.J., et al. (2004) Methods of Processing Shortage and Damage of Historical Data in Load Forecasting. Electric Power Science and Engineering, 1, 16-19.
|