[1]
|
A. Elkhyari, C. Gueret and N. Jussien, “Solving Dynamic RCPSP Using Explanation-Based Constraint Programming,” http://www.emn.fr/jussien/publications/elkhyari-MAPSP03.pdf
|
[2]
|
V. Valls, F. Ballestín and S. Quintanilla, “Justification and RCPSP: A Technique That Pays,” European Journal of Operational Research, Vol. 165, No. 2, September 2005, pp. 375-386. doi:10.1016/j.ejor.2004.04.008
|
[3]
|
E. Neron, “Lower Bounds for the Multi-Skill Project Scheduling Problem,” Proceeding of the Eighth Inter-national Workshop on Project Management and Scheduling, Spain, 2002, pp. 274-277.
|
[4]
|
P. Baptiste, C. Le Pape and W. Nuijten, “Satisfiability Tests and Time Bound Adjustments for Cumulative Scheduling Problems,” Annals of Operation Research, Vol. 92, No. 0, 1999, pp. 305-333 doi:10.1023/A: 1018995000688
|
[5]
|
S. Dauzere-Peres, W. Roux and J. B. Lassere, “Multi-Resource Shop Scheduling with Resource Flexibility,” European Journal of Operational Research, Vol. 107, No. 2, June 1998, pp. 289-305. doi:10.1016/S0377-2217(97) 00341-X
|
[6]
|
B. Jurish, “Scheduling Jobs in Shops with Multi-Purpose Machines,” Ph.D. Dissertation, University of Osnabrück, Osnabrück, 1992.
|
[7]
|
R. Kolisch, “Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation,” European Journal of Operational Research, Vol. 90, No. 2, April 1996, pp. 320-322. doi: 10.1016/0377-2217(95)00357-6
|
[8]
|
E. Neron, P. Baptiste and J. N. D. Gupta, “Solving Hybrid Flow Shop Problem Using Energetic Reasoning and Global Operations,” Omega, Vol. 29, No. 6, December 2001, pp. 501-511. doi:10.1016/S0305-0483 (01)00040-8
|
[9]
|
A. Sprecher, “Resource-constrained Project Scheduling, Exacts Methods for the MultiMode Case,” Lectures Notes in Economics and Mathematical Systems, Springer Verlag, Berlin, 1994.
|
[10]
|
J. S. Coelho, “Generating RCPSP Instances with Known Optimal Solutions,” Proceedings of PMS, 2004
|
[11]
|
J. S. Coelho and L. V. Tavares, “Comparative Analysis on Approximation Algorithms for the Resource Constrained Project Scheduling Problem,” PMS2002, Eighth International Workshop on Project Management
|
[12]
|
R. Kolisch and S. Hartmann, “Experimental Investigation of Heuristics for Resource-Constrained Project Sche- duling: An Update,” European Journal of Operational Research, Vol. 174, No. 1, October 2006, pp. 23-37. doi:10.1016/j.ejor.2005.01.065
|
[13]
|
R. Klein, A. Scholl, “Computing Lower Bounds by Destructive Improvement: An Application to Resource- Constrained Project Scheduling,” European Journal of Operational Research, Vol. 112, No. 2, January 1999, pp. 332-346. doi:10.1016/S0377-2217(97)00442-6
|
[14]
|
J. Carlier and E. Neron, “On Linear Lower Bound for the Resource Constrained Project Scheduling Problem,” European Journal of Operational Research, Vol. 149, No. 2, September 2003, pp. 314-324. doi:10.1016/S0377- 2217(02)00763-4
|