Model Design and Simulation of an 80 kW Capacitor Coupled Substation Derived from a 132 kV Transmission Line

Abstract

The global rise in energy demand, particularly in remote and sparsely populated regions, necessitates innovative and cost-effective electrical distribution solutions. Traditional Rural Electrification (RE) methods, like Conventional Rural Electrification (CRE), have proven economically unfeasible in such areas due to high infrastructure costs and low electricity demand. Consequently, Unconventional Rural Electrification (URE) technologies, such as Capacitor Coupled Substations (CCS), are gaining attention as viable alternatives. This study presents the design and simulation of an 80 kW CCS system, which taps power directly from a 132 kV transmission line to supply low-voltage consumers. The critical components of the CCS, the capacitors are calculated, then a MATLAB/Simulink model with the attained results is executed. Mathematical representation and state-space representation for maintaining the desired tapped voltage area also developed. The research further explores the feasibility and operational performance of this CCS configuration, aiming to address the challenges of rural electrification by offering a sustainable and scalable solution. The results show that the desired value of the tapped voltage can be achieved at any level of High Voltage (HV) with the selection of capacitors that are correctly rated. With an adequately designed control strategy, the research also shows that tapped voltage can be attained under both steady-state and dynamic loads. By leveraging CCS technology, the study demonstrates the potential for delivering reliable electricity to underserved areas, highlighting the system’s practicality and effectiveness in overcoming the limitations of conventional distribution methods.

Share and Cite:

Nene, S.W., Abe, B.T. and Nnachi, A.F. (2025) Model Design and Simulation of an 80 kW Capacitor Coupled Substation Derived from a 132 kV Transmission Line. Open Journal of Modelling and Simulation, 13, 1-19. doi: 10.4236/ojmsi.2025.131001.

1. Introduction

The rapid growth in global energy demand, coupled with the need for sustainable and economically viable power solutions, has prompted a re-evaluation of traditional electrical distribution methods, especially in remote and sparsely populated regions [1]. The demand for efficient and cost-effective electrical distribution has driven innovations in power system architectures [2]. Traditional approaches to Rural Electrification (RE) such as Conventional Rural Electrification (CRE) have been considered economically unviable in sparsely populated regions, particularly rural areas, as they are often associated with minimal electricity demand perception [3] [4]. As a result, Un-Conventional Rural Electrification (URE) technologies are being explored to provide a cost-effective system for supplying electrical power to rural areas [5] [6]. CCS represents a technology that is currently under continuous exploration for rural electrification purposes [7] [8]. CCS entails coupling capacitors used to tap electrical power from HV lines and convert it to distribution-level voltages. However, directly tapping power from an HV transmission line using CCS can induce transient behaviours within the electrical network, inevitably impacting the primary components of the CCS [9]-[11].

This article presents a comprehensive review of a model design and simulation of an 80 kW CCS tapped from a 132 kV transmission line. The main objective of this study is to assess the feasibility and performance of the proposed CCS configuration, designed with the aim of delivering electricity directly from the HV lines to the LV consumers. Microgrids, while recognized as a potential solution, have not yet developed a comprehensive business model that effectively balances affordability with satisfactory cost recovery [12]. By using CCS, electrification to remote or sparsely populated areas can be cost-effective as opposed to using conventional distribution network infrastructure [4].

1.1. Research Problem

The increasing demand for efficient and cost-effective electrical distribution, particularly in remote and sparsely populated areas, necessitates innovative power system architectures. Conventional approaches to rural electrification, such as the use of standard distribution networks, have proven economically unviable due to the high infrastructure costs and low electricity demand in these regions. Consequently, unconventional solutions like Capacitor Coupled Substations (CCS) are being explored as potential alternatives.

This study seeks to evaluate the feasibility and performance of an 80 kW CCS design, which taps power directly from a 132 kV transmission line, to supply electricity to low-voltage consumers. By investigating this configuration, the research aims to determine whether CCS can serve as a cost-effective solution for rural electrification, overcoming the limitations of traditional distribution methods and addressing the challenge of delivering affordable, reliable electricity to sparsely populated areas.

1.2. Contribution

The study contributes to the ongoing exploration of CCS by providing a detailed design and simulation of an 80 kW CCS system. It enhances understanding of CCS’s practical applications in rural electrification, offering insights into the system’s operational performance, stability, and potential as a scalable solution for delivering electricity to underserved areas.

1.3. Novelty Contribution

While CCSs have been explored theoretically, their application for direct tapping from HV lines to supply electricity to LV consumers, particularly in sparsely populated or rural areas, remains unexplored. The study provides a unique approach by proposing and simulating an 80 kW CCS system, specifically designed to deliver electricity from a 132 kV transmission line to LV consumers. This fills a gap in the existing research, where practical implementations of such systems are scarce.

2. Background Theory

One of the recent instances of practical implementation of a CCS has clearly demonstrated the system’s feasibility and effectiveness in supplying electrical power to dedicated loads [13]. Through rigorous testing and operation, practical studies have shown that CCS can reliably meet the energy needs of specific consumers or applications, thereby, highlighting its potential as a viable solution for electrification in various contexts such as in sparsely populated areas or low dedicated loads [14]. A CCS can be integrated into an electrical transmission network using either a nominal-π or nominal-T configuration. The nominal-T configuration is typically employed for shorter transmission lines, extending up to 80 km, while the nominal-π configuration is preferred for medium-length transmission lines exceeding 80 km [15]. In essence, current studies do not provide any limitations on the type of transmission line where a CCS can be adopted.

Figure 1 below illustrates the simplified depiction of a typical CCS. This approach is similar to that of a Capacitive Voltage Transformer (CVT), which is a transformer commonly used in power systems to reduce extra-high voltage signals to low voltage signals for tasks such as metering or operating protective relays [16] [17].

The simplified CCS, as shown in Figure 1 above, employs a capacitor-divider configuration where capacitors (C1 and C2) are linked across the incoming voltage (Vin) to generate the desired tap-voltage (VT), which is measured from the tapping node located between the two capacitors. The voltage output (Vout) is calculated by subtracting the voltage drop across the inductor (L) from VT. It is important to note that C1 and C2 refer to capacitor banks rather than individual capacitors where C1 represents Capacitor Bank 1, while C2 represents Capacitor Bank 2.

Figure 1. Overly simplified CCS [18].

The tap-voltage (VT) is calculated as follows:

V T = V in × C 1 C 1 + C 2 (1)

The output voltage is calculated as follows:

V out = V T V L 1 (2)

The output voltage can also be represented as follows:

V out = C 1 C 1 + C 2 × V L (3)

The equations provided, as (1), (2), and (3), serve as the basis for determining the elements of a CCS. The objective is to ensure the stability of Vout as the CCS delivers power to a downstream transformer within the distribution network.

In Figure 2 below, the equivalent CCS connected to a standard transmission line is depicted.

Figure 2. CCS connected to a typical transmission line.

3. Methodology

The methodology outlines the sequential steps undertaken in a research study [19]. In this study, the methodology undertaken involved the calculation of the required capacitors to achieve the desired tap voltage, the mathematical representation of the system and the development, modeling, and analysis of a CCS system using MATLAB/Simulink software. Subsequently, the results derived from the MATLAB/Simulink model were thoroughly analysed. Figure 3 illustrates the designed block diagram model, while Figure 4 and Figure 5 depict the line model utilized in the analysis. These figures provide visual representations of the models employed in the study, facilitating a comprehensive understanding of the research approach and findings of the research.

Figure 3 displays the model block diagram encompassing various components, including the supply block, the transmission line segment preceding the CCS tap node, the transmission line segment succeeding the CCS tap node, the downstream transmission line block, the CCS block itself, and the CCS load block. Additionally, Figure 4 shows the physical model representation of a CCS.

Figure 3. Model block diagram.

Figure 4. CCS model.

3.1. Parameters Used

The aim of this study is to develop and simulate an 80 kW loaded Capacitor Coupled Substation (CCS) connected to a standard transmission network. The selected transmission network is operated at 132 kVrms. To define the parameters of the CCS, predetermined values were used, and background calculations were conducted and the results were used for the model. The selected parameters are detailed in Table 1.

Table 1. Model system known parameters.

Parameter

Value

Description

Vs

132 kV rms

Supply voltage representing upstream of the transmission line

VT

11 kV rms

The desired tap voltage for the CCS

CCS load

400 V rms, 50 Hz, 80 kW, 0.8 PF

The CCS load voltage level

Downstream load

132 kV rms, 50 Hz, 50 MW

Load downstream of the CCS tap note

The parameters in Table 1 are used to calculate the variables required in order to achieve the desired VTAP, and thus, the CCS load voltage of 400 V rms. The voltage selected is based on readily available and commonly used transmission lines and distribution transmission voltages in South Africa.

Using (1), (2) and (3), with known supply voltage and the desired tap voltage, the respective capacitors C1 and C2 are calculated.

3.2. Modeling and Simulation

The process of modeling the system involves the utilization of MATLAB/Simulink software, a powerful computational tool widely employed in engineering research. Furthermore, to ensure a comprehensive analysis, different voltage levels were used to determine the impact on the capacitors to keep tapped voltage within acceptable tolerances. This approach provided a deeper understanding of the system’s behaviour under varying conditions. The parameters used in the simulated model, crucial for accurately capturing the system behaviour, are outlined in Table 1.

The model utilized for simulating the system is depicted in Figure 4 in the preceding section. This model was streamlined by employing internal MATLAB/Simulink parameters within the subsystem. The primary parameter values were extracted mainly from six model scopes, as outlined in Table 2.

The simulation was conducted with all circuit breakers in the system remaining closed for the entire duration of the 1.5-second simulation run. The findings from this simulation are elaborated upon in Section 4.

Table 2. Measured parameters by scope.

Scope number

Scop measured parameters

Scope 1

Supply parameters

Scope 2

Transmission network downstream parameters

Scope 3

CCS tap parameter

Scope 4

Distribution transformer primary voltage

Scope 5

Distribution transformer secondary voltage

Scope 6

CCS load parameter

4. Results and Discussion

The results obtained from the calculations and simulated model are presented in detail. The results are analysed and discussed to provide comprehensive insights into the performance of the system. These findings are visually represented, and each offers a distinct perspective on various aspects of the simulation. Through the interpretation of these figures, we aim to assess the behaviour and characteristics of the simulated system under normal steady state conditions, contributing to a deeper understanding of its functionality.

4.1. Calculated Results

Using the known parameters as per Table 1, to calculate the values of the capacitor banks C 1 and C 2 with the given parameters, the following results were achieved.

Using:

  • Vs = 132 kV rms

  • Vtap = 11 kV rms

  • VCCS-Load = 400 V rms

  • Frequency f = 50 Hz

  • CCS Load = 80 kW at 0.8 Power Factor

  • Downstrean Load = 132 kV rms, 50 MW

  • Line Length = 300 km

From Equation (1), C 1 and C 2 are calculated as:

C 1 C 1 + C 2 = V tap V s

With the known supply voltage and the desired V tap , the ratio is:

C 1 C 1 + C 2 = 11kV 132kV = 11 132 = 1 12

Therefore, the relationship between C 1 and C 2 is:

C 2 =11 C 1

The individual capacitor banks capacitance is calculated using the system frequency of f=50Hz and the relationship between the reactance X C and capacitance C as:

X C = 1 2πfC

Ignoring the load impedance gives the ratio of the capacitors as 1:11 (from C 2 =11 C 1 ). Therefore:

C 1 = C total 12 and C 2 = 11 C total 12

The actual values of C 1 and C 2 , with the CCS power of 80 kW at 0.8PF is calculated from:

ApparentPowerS= P PF = 80kW 0.8 =100kVA

Assuming nominal total reactive power is balanced:

C total S 2πf V tap 2 100× 10 3 2×3.14146× ( 11× 10 3 ) 2 2.63μF

Therefore:

C 1 2.63μF 12 0.22μF and C 2 11×2.63μF 12 2.41μF .

From the calculated value of C 1 and C 2 , the simulation values used are presented in Table 3.

Table 3. Simulation parameters based on calculated C1 and C2.

Parameter

Value

Source

Vs

132 kV rms

Selected transmission line

VT

11 kV rms

Selected tap voltage

CCS load

400 V rms, 50 Hz, 80 kW, 0.8 PF

Selected load value

Downstream load

132 kV rms, 50 Hz, 50 MW

Selected load value

CCS transformer

11 kV/400 V

Selected transformer

C1

0.22 µF

Calculated capacitor 1

C2

2.41 µF

Calculated capacitor 2

L

1 mH

Line inductance

Tx line section #1

300 km

Selected

Tx line section #2

300 km

Selected

4.2. Single Line Representation

The calculated values of C 1 and C 2 are then used to simulate the system and observe its behaviour. The results obtained from the simulation are shown in Figures 4-8 and Figure 9.

Figure 5 presents the supply voltage parameters with 132 kV rms as the supply and the resulting current, active power and reactive power based on the given CCS and downstream load. The downstream load parameters are also presented in Figure 6.

Figure 7 presents the CCS tap node with the V tap being approximately 15.6 kV peak ≈ 11 kV rms, with Figure 8 representing the resulting CCS transformer secondary voltage of approximately 565 V peak ≈ 400 V rms, while Figure 9 represents the CCS load parameters with the selected 80 kW load.

The study primarily focused on three key voltage levels: the supply voltage (Vin), the tap voltage (VT), and the load voltage (VL). These voltage levels play a critical role in the operation and performance of the system under investigation.

Simulation Results Interpretation

From the simulation results, the summarised results based on the main variable of focus, V tap , are expressed in Figure 10, Figure 11 and Figure 12, where Figure 10 and Figure 11 present the supply, V tap and transformer secondary voltages, while Figure 12 presents the numerical representation of the peak values for the supple and V tap , respectively.

Figure 5. Supply parameters.

Figure 6. Downstream parameters.

Figure 7. CCS Vtap node.

Figure 8. Distribution secondary voltage.

Figure 9. CCS load parameters.

Figure 10. Supply, tapped and transformer secondary voltage.

Figure 11. Supply, tapped voltage and transformer secondary voltage.

Figure 12. MATLAB measured voltage.

The measured voltages, extrapolated from Figure 11 and Figure 12 are:

V s = V in =1.866 e +05 =1.866× 10 5 =186.6kV

V t = V trf,primary =1.540 e +05 =1.540× 10 4 =15.4kV

Since the MATLAB results waveform represents the peak value, the root mean square (RMS) is calculated as:

V s,rms = V peak 2 = 186.6kV 2 =131.9kV

V t,rms = V peak 2 = 15.4kV 2 =10.89kV

These results show that the selected C1 and C2 gives the desired V tap .

In Figure 12, Vline represents the incoming voltage from the voltage source supply, serving as the primary source of electrical energy. Vt, or tap voltage, denotes the voltage level obtained after tapping from the transmission line, which is essential for regulating and delivering electrical power to the subsequent components of the CCS system. Figure 12 is simplified as:

V Line =1.866×10 e 5 =186kVpeak=132kVrms

V tap =1.540×10 e 4 =15.4kVpeak=11kVrms

4.3. Results Repetition

The calculated results can also be used as the basis for any CCS design. The V tap can be achieved by adjusting C 1 and C 2 from any HV supply. A basic MATLAB Code that can be used is presented in Table 4.

Table 4. MATLAB code.

The results of the code in Table 4 are presented in Table 5.

The same code can be used when the supply voltage changes, as shown in the example result presented in Table 6, when the supply voltage is changed to 400 kV.

Testing the code on the nominal HV levels used in South Africa [20], the code can adjust C 1 and C 2 to achieve the desired tapped voltage as shown in Table 7.

Table 5. Table 4 MATLAB code run results.

Final C1: 0.218903 µF

Final C2: 2.397979 µF

Final tap voltage: 10841.13 V

Iterations: 100

Table 6. Table 4 MATLAB code run results when Vs is 400 kV rms.

Final C1: 0.122561 µF

Final C2: 4.282966 µF

Final tap voltage: 10913.58 V

Iterations: 100

Table 7. Achieved V tap from different V s .

HV Level

88 kV

132 kV

275 kV

400 kV

765 kV

C 1

0.273 µF

0.219 µF

0.147 µF

0.123 µF

0.087 µF

C 2

1.924 µF

2.398 µF

3.577 µF

4.283 µF

6.017 µF

V tap

11.1 kV

10.8 kV

11.0 kV

10.9 kV

11.2 kV

Table 7 presents the resulting V tap tapped from different values of V s with C 1 and C 2 that gives that resulting V tap .

4.3.1. Maintaining the Tapped Voltage Under Load

The tapped voltage ( V tap ) can be influenced by the load [21]. V tap on a steady-state circuit is derived by Equation (1). However, when the load connected changes, it affects the impedance seen by the capacitors, thus altering the V tap . The load introduces an additional impedance parallel with C 2 and can be represented by Z C2 . If Z L is the impedance of the load, then the effective impedance across C 2 and the load is given by:

Z eff = ( 1 Z C2 + 1 Z L ) 1

where: Z C2 = 1 jω C 2 = 1 j2πf C 2

The V tap under varying load is thus derived from:

V tap = V S × Z eff Z eff + Z C1 V tap = V S × 1 jω C 2 × Z L 1 jω C 2 + Z L + 1 jω C 1

In order to maintain the desired value of V tap :

  • If V tap is lower than desired, increase C 1 or decrease C 2

  • If V tap is higher than desired, decrease C 1 or increase C 2

4.3.2. Computing Vtap Under Dynamic Load Conditions Using State-Space Representation

Using the data from Table 4, a state-space representation for maintaining the desired tapped voltage ( V tap ) on a CCS under dynamic loads can be modelled as follows, using state variables:

  • x 1 ( t )= V C1 ( t ) : Voltage across capacitor C 1

  • x 2 ( t )= I L ( t ) : Current through the inductor L

  • x 3 ( t )= V C2 ( t ) : Voltage across capacitor C 2

The state-space equations is therefore defined using Kirchhoff’s Current Law (KCL) at the C 1 , with I s ( t ) , being the current from the source, as:

C 1 d V C1 ( t ) dt = I s ( t ) I L ( t )

Using Kirchhoff’s Voltage Law (KVL) across L, gives:

L d I L ( t ) dt = V C1 ( t ) V C2 ( t )

While using KCL at C 2 , where I load ( t ) is the current drawn by the dynamic load connected to the system, gives:

C 2 d V C2 ( t ) dt = I L ( t ) I load ( t )

The state-space equations are thus given as:

x ˙ 1 ( t )= 1 C 1 ( I s ( t ) x 2 ( t ) )

x ˙ 2 ( t )= 1 L ( x 1 ( t ) x 3 ( t ) )

x ˙ 3 ( t )= 1 C 2 ( x 2 ( t ) I load ( t ) )

The matrix representation is thus:

( x ˙ 1 ( t ) x ˙ 2 ( t ) x ˙ 3 ( t ) )=( 0 1 C 1 0 1 L 0 1 L 0 1 C 2 0 )( x 1 ( t ) x 2 ( t ) x 3 ( t ) )+( 1 C 1 0 0 ) I s ( t )+( 0 0 1 C 2 ) I load ( t )

The output equation, which relates the state variables to V tap = x 3 ( t ) , is:

y( t )=( 0 0 1 )( x 1 ( t ) x 2 ( t ) x 3 ( t ) )

In order to maintain the desired V tap , control input u( t ) is introduced as part of I s ( t ) , making I s ( t ) a function of u( t ) . The input vector B and control law can be modified accordingly to achieve the desired V tap . The state-space model to use when designing control strategies to maintain the desired V tap under varying load conditions is given by:

x ˙ 1 ( t )= A x ( t )+ B u ( t )+ B load I load ( t )

y( t )= C x ( t )

where:

A=( 0 1 C 1 0 1 L 0 1 L 0 1 C 2 0 ) , B=( 1 C 2 0 0 ) , B load =( 0 0 1 C 2 ) , C=( 0 0 1 )

The control law may include load compensation to counteract the effects of B load I load ( t ) . Under varying I load , in order to achieve and maintain the desired V tap , a gain matrix K can be designed to fulfil the control law with feedback controller u( t )=Kx( t ) .

5. Conclusions

This study explored the feasibility and performance of an 80 kW Capacitor Coupled Substation (CCS) system tapped from a 132 kV transmission line, with the goal of providing an alternative solution for rural electrification. By integrating the CCS directly into the high-voltage network and tapping power for low-voltage consumers, the model successfully demonstrated that stable tap voltages could be achieved under varying supply conditions. The research highlights the potential of CCS technology to serve as a scalable alternative to traditional distribution networks, especially in sparsely populated regions where conventional electrification methods are economically unviable.

The simulation results revealed that the proposed CCS system could maintain the desired tap voltage even under different load conditions, provided appropriate adjustments were made to the capacitor banks. The MATLAB/Simulink model, validated through extensive calculations, confirmed that the CCS design could reliably deliver electricity to low-voltage consumers. This approach not only fills a critical gap in rural electrification research but also opens avenues for further development and practical implementation of CCS systems in remote areas.

The study contributes valuable insights into the practical application of CCS technology for rural electrification, offering a promising solution to address the challenges of delivering reliable electricity to underserved communities. Future research could build upon these findings by exploring the long-term stability, economic viability, and potential integration of renewable energy sources within the CCS framework.

Recommendations

The following is the recommendation for future research:

Further analysis of a CCS in a dynamic state is to be conducted in order to identify operability of a CCS in a real-world environment.

Conflicts of Interest

The authors declare no conflicts of interest regarding the publication of this paper.

References

[1] Bayliss, K. and Pollen, G. (2021) The Power Paradigm in Practice: A Critical Review of Developments in the Zambian Electricity Sector. World Development, 140, Article ID: 105358.
https://doi.org/10.1016/j.worlddev.2020.105358
[2] Samad, T. and Annaswamy, A.M. (2017) Controls for Smart Grids: Architectures and Applications. Proceedings of the IEEE, 105, 2244-2261.
https://doi.org/10.1109/jproc.2017.2707326
[3] Falchetta, G., Pachauri, S., Byers, E., Danylo, O. and Parkinson, S.C. (2020) Satellite Observations Reveal Inequalities in the Progress and Effectiveness of Recent Electrification in Sub-Saharan Africa. One Earth, 2, 364-379.
https://doi.org/10.1016/j.oneear.2020.03.007
[4] Saulo, M.J. (2014) Penetration Level of Un-Conventional Rural Electrification Technologies on Power Networks. Ph.D. Thesis, University of Cape Town.
[5] Olówósejéjé, S., Leahy, P. and Morrison, A.P. (2020) A Practical Approach for Increased Electrification, Lower Emissions and Lower Energy Costs in Africa. Sustainable Futures, 2, Article ID: 100022.
https://doi.org/10.1016/j.sftr.2020.100022
[6] Nene, S.W., Abe, B.T. and Nnachi, A.F. (2023) Modeling and Analysis of Multiple Capacitor Coupled Substations at Different Proximities. 2023 31st Southern African Universities Power Engineering Conference (SAUPEC), Johannesburg, 24-26 January 2023, 1-6.
https://doi.org/10.1109/saupec57889.2023.10057698
[7] Saulo, M.J. and Gaunt, C.T. (2015) The Impact of Capacitor Coupled Sub-Station in Rural Electrification of Sub-Saharan Africa. International Journal of Energy and Power Engineering, 4, 12-29.
[8] Raphalalani, T., Ijumba, N. and Jimoh, A. (2002) Capacitive Divider System for Feeding a Distribution Network from EHV Line. PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409), Perth, 4-7 December 2000, 299-304.
[9] Abbasi, A., Fathi, S.H. and Mihankhah, A. (2017) Elimination of Chaotic Ferroresonant Oscillations Originated from TCSC in the Capacitor Voltage Transformer. IETE Journal of Research, 64, 354-366.
https://doi.org/10.1080/03772063.2017.1353928
[10] Radmanesh, H. (2012) Ferroresonance Elimination in 275kv Substation. Electrical and Electronic Engineering, 2, 54-59.
https://doi.org/10.5923/j.eee.20120202.10
[11] Rojas, R.E., Chaves, J.S. and Tavares, M.C. (2023) Ferroresonance Mitigation for the Unconventional Rural Electrification System. Electric Power Systems Research, 223, Article ID: 109590.
https://doi.org/10.1016/j.epsr.2023.109590
[12] Ogeya, M., Muhoza, C. and Johnson, O.W. (2021) Integrating User Experiences into Mini-Grid Business Model Design in Rural Tanzania. Energy for Sustainable Development, 62, 101-112.
https://doi.org/10.1016/j.esd.2021.03.011
[13] Schilder, M., Britten, A., Mathebula, M. and Singh, A. (2005) Eskom Experience with On-Site Field Tests of a Capacitive Coupled Substation. 2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa, Durban, 11-15 July 2005, 105-110.
[14] Reeves, K., Gaunt, C.T. and Braae, M. (2011) Modelling and Dynamic Systems Analysis of Instability in a Capacitor-Coupled Substation Supplying an Induction Motor. Electric Power Systems Research, 81, 888-893.
https://doi.org/10.1016/j.epsr.2010.11.026
[15] Ritzmann, D., Wright, P.S., Holderbaum, W. and Potter, B. (2016) A Method for Accurate Transmission Line Impedance Parameter Estimation. IEEE Transactions on Instrumentation and Measurement, 65, 2204-2213.
https://doi.org/10.1109/tim.2016.2556920
[16] Mohan, V., Poornima, S. and Sugumaran, C.P. (2019) Mitigation of Ferroresonance in Capacitive Voltage Transformer Using Memelements. 2019 International Conference on High Voltage Engineering and Technology (ICHVET), Hyderabad, 7-8 February 2019, 1-5.
https://doi.org/10.1109/ichvet.2019.8724375
[17] Chen, B., Du, L., Liu, K., Chen, X., Zhang, F. and Yang, F. (2017) Measurement Error Estimation for Capacitive Voltage Transformer by Insulation Parameters. Energies, 10, Article 357.
https://doi.org/10.3390/en10030357
[18] de Andrade Reis, R.L., Neves, W.L.A., Lopes, F.V. and Fernandes, D. (2019) Coupling Capacitor Voltage Transformers Models and Impacts on Electric Power Systems: A Review. IEEE Transactions on Power Delivery, 34, 1874-1884.
https://doi.org/10.1109/tpwrd.2019.2908390
[19] Mishra, D.S.B. and Alok, D.S. (2022) Fundamentals of Research. In: Mishra, D.S.B. and Alok, D.S., Ed., Handbook of Research Methodology, Educreation Publishing, 2.
[20] Buraimoh, E., Adebiyi, A.A., Ayamolowo, O.J. and Davidson, I.E. (2020) South Africa Electricity Supply System: The Past, Present and the Future. 2020 IEEE PES/IAS PowerAfrica, Nairobi, 25-28 August 2020, 1-5.
https://doi.org/10.1109/powerafrica49420.2020.9219923
[21] Pratama, N.A. and Rahmawati, Y. (2020) Evaluation of Unbalanced Load Impacts on Distribution. Frontier Energy System and Power Engineering, 2, 28-35.

Copyright © 2025 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.