On Improving Replenishment Lot Size of an Integrated Manufacturing System with Discontinuous Issuing Policy and Imperfect Rework
Ting J. Lee, Singa W. Chiu, Huei H. Chang
.
DOI: 10.4236/ajibm.2011.11003   PDF    HTML   XML   4,606 Downloads   9,045 Views   Citations

Abstract

This paper proposes a cost reduction distribution policy for an integrated manufacturing system operating under quality assurance practice. We reexamine the problem studied by Chiu et al. [Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework. International Journal for Numerical Methods in Biomedical Engineering, doi:10.1002/cnm.1369] and improve its replenishment lot-size solution in terms of lowering producer’s stock holding cost. Mathematical modeling and analysis is employed in this study and optimal replenishment lot size is derived. A numerical example is provided to show the practical usage of research result as well as to demonstrate significant savings in producer’s holding cost as compared to that in Chiu et al.

Share and Cite:

T. Lee, S. Chiu and H. Chang, "On Improving Replenishment Lot Size of an Integrated Manufacturing System with Discontinuous Issuing Policy and Imperfect Rework," American Journal of Industrial and Business Management, Vol. 1 No. 1, 2011, pp. 20-29. doi: 10.4236/ajibm.2011.11003.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] S. W. Chiu, K. -K. Chen and H. -D. Lin, “Numerical Method for Determination of the Optimal Lot Size for a Manufacturing System with Discontinuous Issuing Policy and Rework,” International Journal of Numerical Methods in Biomedical Engineering, Vol. 27, No. 10, 2011. pp. 1545-1557. doi:10.1002/cnm.1369
[2] G. Hadley and T. M. Whitin, “Analysis of Inventory Systems,” Prentice-Hall, New Jersey, 1963.
[3] F. S. Hillier and G. J. Lieberman, “Introduction to Operations Research,” McGraw Hill, New York, 2001.
[4] S. Nahmias, “Production & Operations Analysis,” McGraw-Hill, New York, 2009.
[5] Y. -S. P. Chiu and C. -K. Ting, “A Note on ‘Determining the Optimal Run Time for EPQ Model with Scrap, Rework and Stochastic Breakdowns’,” European Journal of Operational Research, Vol. 201, No. 2, 2010, pp. 641- 643. doi:10.1016/j.ejor.2009.03.014
[6] S. W. Chiu, “Robust Planning in Optimization for Production System Subject to Random Machine Breakdown and Failure in Rework,” Computers & Operations Research, Vol. 37, No. 5, 2010, pp. 899-908. doi:10.1016/j.cor.2009.03.016
[7] R. Mehdi, R. Nidhal and C. Anis, “Integrated Mainte- nance and Control Policy Based on Quality Control,” Computers and Industrial Engineering, Vol. 58, No. 3, 2010, pp. 443-451. doi:10.1016/j.cie.2009.11.002
[8] W.-N. Ma, D.-C. Gong and G. C. Lin, “An Optimal Common Production Cycle Time for Imperfect Produc- tion Processes with Scrap,” Mathematical and Computer Modeling, Vol. 52, No. 5-6, 2010, pp. 724-737. doi:10.1016/j.mcm.2010.04.024
[9] M. Henig and Y. Gerchak, “Structure of Periodic Review Policies in the Presence of Random Yield,” Operations Research, Vol. 38, 1990, pp. 634-643. doi:10.1287/opre.38.4.634
[10] C. H. Kim, Y. Hong and S. Y. Chang, “Optimal Produc- tion Run Length and Inspection Schedules in a Deterio- rating Production Process,” IIE Transaction, Vol. 33, No. 5, 2001, pp. 421-426. doi:10.1080/07408170108936840
[11] M. J. Rosenblatt and H. L. Lee, “Economic Production Cycles with Imperfect Production Processes,” IIE Trans- action, Vol. 18, No. 1, 1986, pp. 48-55. doi:10.1080/07408178608975329
[12] W. Shih, “Optimal Inventory Policies When Stock-Outs Result from Defective Products,” International Journal of Production Research, Vol. 18, No. 6, 1980, pp. 677-686. doi:10.1080/00207548008919699
[13] Y. -S. P. Chiu, F. -T. Cheng and H. -H. Chang, “Remarks on Optimization Process of Manufacturing System with Stochastic Breakdown and Rework,” Applied Mathemat- ics Letters, Vol. 23, No. 10, 2010, pp. 1152-1155. doi:10.1016/j.aml.2010.03.023
[14] X. Zhang and Y. Gerchak, “Joint Lot Sizing and Inspec- tion Policy in an EOQ Model with Random Yield,” IIE Transaction, Vol. 22, No. 1, 1990, pp. 41-47. doi:10.1080/07408179008964156
[15] R. E. Barlow and F. Proschan, “Mathematical Theory of Reliability,” John Wiley & Sons, New York, 1965.
[16] S. W. Chiu and Y. -S. P. Chiu, “Mathematical Modeling for Production System with Backlogging and Failure in Repair,” Journal of Scientific and Industrial Research, Vol. 65, 2006, pp. 499-506.
[17] S. W. Chiu, K. -K. Chen and J. -C. Yang, “Optimal Re- plenishment Policy for Manufacturing Systems with Fail- ure in Rework, Backlogging and Random Breakdown,” Mathematical and Computer Modeling of Dynamical Systems, Vol. 15, No. 3, 2009, pp. 255-274. doi:10.1080/13873950902808602
[18] A. Grosfeld-Nir and Y. Gerchak, “Multistage Production to Order with Rework Capability,” Management Science, Vol. 48, 2002, pp. 652-664. doi:10.1287/mnsc.48.5.652.7802
[19] V. Makis, “Optimal Lot Sizing and Inspection Policy for an EMQ Model with Imperfect Inspections,” Naval Re- search Logistics, Vol. 45, No. 2, 1998, pp. 165-186. doi:10.1002/(SICI)1520-6750(199803)45:2<165::AID-NAV3>3.0.CO;2-6
[20] Y.-S. P. Chiu, K.-K. Chen and H.-H. Chang, “Solving an Economic Production Lot Size Problem with Multi- Delivery Policy and Quality Assurance Using an Alge- braic Approach,” Journal of Scientific & Industrial Re- search, Vol. 69, No. 12, 2010, pp. 926-929.
[21] B. J. Yum and E. D. McDowell, “Optimal Inspection Policies in a Serial Production System Including Scrap, Rework and Repair: An MILP Approach,” International Journal of Production Research, Vol. 25, 1987, pp. 1451- 1464.
[22] L. B. Schwarz, “A Simple Continuous Review Determi- nistic One-Warehouse N-Retailer Inventory Problem,” Management Science, Vol. 19, 1973, pp. 555-566. doi:10.1287/mnsc.19.5.555
[23] S. K. Goyal, “Integrated Inventory Model for a Single Supplier-Single Customer Problem,” International Jour- nal of Production Research, Vol. 15, No. 1, 1977, pp. 107-111. doi:10.1080/00207547708943107
[24] B. Abdul-Jalbar, J. Gutiérrez and J. Sicilia, “Integer-Ratio Policies for Distribution/Inventory Systems,” Interna- tional Journal of Production Research, Vol. 93, 2005, pp. 407-415.
[25] B. Bilgen, “Application of Fuzzy Mathematical Pro- gramming Approach to the Production Allocation and Distribution Supply Chain Network Problem,” Expert Systems with Applications, Vol. 37, No. 6, 2010, pp. 4488 -4495. doi:10.1016/j.eswa.2009.12.062
[26] U. Buscher and G. Lindner, “Optimizing a Production System with Rework and Equal Sized Batch Shipments,” Computers & Operations Research, Vol. 32, 2005, pp. 515-535.
[27] A. Diponegoro and B. R. Sarker, “Finite Horizon Plan- ning for a Production System with Permitted Shortage and Fixed-Interval Deliveries,” Computers & Operations Research, Vol. 33, No. 8, 2006, pp. 2387-2404. doi:10.1016/j.cor.2005.02.019
[28] S. K. Goyal and F. Nebebe, “Determination of Economic Production-Shipment Policy for a Single-Vendor-Single- Buyer System,” European Journal of Operational Re- search, Vol. 121, No. 1, 2000, pp. 175-178. doi:10.1016/S0377-2217(99)00013-2
[29] R. M. Hill, “Optimizing a Production System with a Fixed Delivery Schedule,” Journal of Operational Re- search Society, Vol. 47, 1996, pp. 954-960.
[30] S. -L. Kim, A. Banerjee and J. Burton, “Production and Delivery Policies for Enhanced Supply Chain Partner- ships,” International Journal of Production Research, Vol. 46, No. 22, 2008, pp. 6207-6229. doi:10.1080/00207540701472124
[31] D. Ojha, B. R. Sarker and P. Biswas, “An Optimal Batch Size for an Imperfect Production System with Quality Assurance and Rework,” International Journal of Pro- duction Research, Vol. 45, No. 14, 2007, pp. 3191-3214. doi:10.1080/00207540600711853
[32] B. R. Sarker and G. R. Parija, “An Optimal Batch Size for a Production System Operating under a Fixed-Quantity, Periodic Delivery Policy,” Journal of Operational Research Society, Vol. 45, 1994, pp. 891-900.
[33] R. A. Sarker and L. R. Khan, “An Optimal Batch Size under a Periodic Delivery Policy,” International Journal of Systems Science, Vol. 32, No. 9, 2001, pp. 1089-1099. doi:10.1080/00207720010015717
[34] L. B. Schwarz, B. L. Deuermeyer and R. D. Badinelli, “Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System,” Management Science, Vol. 31, 1985, pp. 488-498. doi:10.1287/mnsc.31.4.488
[35] S. Viswanathan, “Optimal Strategy for the Integrated Vendor-Buyer Inventory Model,” European Journal of Operational Research, Vol. 105, No. 1, 1998, pp. 38-42. doi:10.1016/S0377-2217(97)00032-5

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.