[1]
|
Wang, W.C., Yu, W.D., Yang, I.T., Lin, C.C., Lee, M.T. and Cheng, Y.Y. (2013) Applying the AHP to Support the Best-Value Contractor Selection—Lessons Learned from Two Case Studies in Taiwan. Journal of Civil Engineering and Management, 19, 24-36. http://dx.doi.org/10.3846/13923730.2012.734851
|
[2]
|
Hatush, Z. and Skitmore, M. (1998) Contractor Selection Using Multicriteria Utility Theory: An Additive Model. Building and Environment, 33, 105-115. http://dx.doi.org/10.1016/S0360-1323(97)00016-4
|
[3]
|
Pongpeng, J. and Liston, J. (2003) TenSeM: A Multicriteria and Multidecision-Makers’ Model in Tender Evaluation. Construction Management and Economics, 21, 21-30. http://dx.doi.org/10.1080/0144619032000065090
|
[4]
|
Singh, D. and Tiong, R.L.K. (2005) A Fuzzy Decision Framework for Contractor Selection. Journal of Construction Engineering and Management ASCE, 131, 62-70. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:1(62)
|
[5]
|
Li, Y., Nie, X. and Chen, S. (2007) Fuzzy Approach to Prequalifying Construction Contractors. Journal of Construction Engineering and Management ASCE, 133, 40-49. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:1(40)
|
[6]
|
Alarcón, L.F. and Mourgues, C. (2002) Performance Modeling for Contractor Selection. Journal of Management in Engineering ASCE, 18, 52-60. http://dx.doi.org/10.1061/(ASCE)0742-597X(2002)18:2(52)
|
[7]
|
Saaty, T.L. (1978) Exploring the Interface between Hierarchies, Multiple Objectives and the Fuzzy Sets. Fuzzy Sets and Systems, 1, 57-68. http://dx.doi.org/10.1016/0165-0114(78)90032-5
|
[8]
|
Saaty, T.L. (1980) The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation. McGraw-Hill, NY. 287 p.
|
[9]
|
Skibniewski, M.J. and Chao, L. (1992) Evaluation of Advanced Construction Technology with AHP Method. Journal of Construction Engineering and Management, ASCE, 118, 577-593.
http://dx.doi.org/10.1061/(ASCE)0733-9364(1992)118:3(577)
|
[10]
|
Fong, P.S. and Choi, S.K. (2000) Final Contractor Selection Using the Analytical Hierarchy Process. Construction Management and Economics, 18, 547-557. http://dx.doi.org/10.1080/014461900407356
|
[11]
|
Al-Harbi, K.M.A. (2001) Application of the AHP in Project Management. International Journal of Project Management, 19, 19-27. http://dx.doi.org/10.1016/S0263-7863(99)00038-1
|
[12]
|
Anagnostopoulos, K.P. and Vavatsikos, A.P. (2006) An AHP Model for Construction Contractor Prequalification, Operational Research. Anais: An International Journal, 6, 333-346.
|
[13]
|
Padhi, S.S. and Mohapatra, P.K.J. (2009) Contractor Selection in Government Procurement Auctions: A Case Study, European. Journal of Industrial Engineering, 3, 170-186. http://dx.doi.org/10.1504/EJIE.2009.023604
|
[14]
|
Dobi, K., Gugic, J. and Kancijan, D. (2010) AHP as a Decision Support Tool in the Multicriteria Evaluation of Bids in Public Procurement. The 32nd International Conference on Information Technology Interfaces (ITI 2010), 21-24 June 2010, Catvat/Dubrovnik, 447-452.
|