American Journal of Operations Research

Volume 7, Issue 6 (November 2017)

ISSN Print: 2160-8830   ISSN Online: 2160-8849

Google-based Impact Factor: 0.84  Citations  

A Review of Activity Time Distributions in Risk Analysis

HTML  XML Download Download as PDF (Size: 398KB)  PP. 356-371  
DOI: 10.4236/ajor.2017.76027    1,282 Downloads   3,790 Views  Citations

ABSTRACT

Project Evaluation and Review Technique (PERT) alongside recent modifications is a popular and useful tool in project risk analysis. Over the past seven decades, there have been some modifications in PERT owing to the shift from beta distributed activity times to other activity time distributions. This paper presents a review of activity time distributions in risk analysis as found in literature up to date.

Share and Cite:

Udoumoh, E. and Ebong, D. (2017) A Review of Activity Time Distributions in Risk Analysis. American Journal of Operations Research, 7, 356-371. doi: 10.4236/ajor.2017.76027.

Cited by

[1] Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory
Journal of Construction …, 2022
[2] Universal generating function-based narrow reliability bounds to evaluate reliability of project completion time
baqhi - Reliability Engineering & System Safety, 2022
[3] МЕТОДИКА ВЫВОДА ФУНКЦИЙ ВЕРОЯТНОСТИ И ПЛОТНОСТИ ВЕРОЯТНОСТИ ПРОДОЛЖИТЕЛЬНОСТИ ОБРАБОТКИ ЗАПРОСОВ …
Известия высших учебных заведений …, 2022
[4] ANÁLISIS DE UNA RED DE ACTIVIDADES PERT MEDIANTE SIMULACIÓN MONTECARLO EN EXCEL CON MACROS AUXILIARES
ANFEI Digital, 2021
[5] АНАЛИТИЧЕСКАЯ ОЦЕНКА ВЕРОЯТНОСТИ СУММЫ РАВНОМЕРНО РАСПРЕДЕЛЕННЫХ СЛУЧАЙНЫХ ВЕЛИЧИН В ИНФОРМАЦИОННО …
ПРОБЛЕМЫ ИНФОРМАТИКИ В ОБРАЗОВАНИИ …, 2021
[6] Dynamic Probability Analysis for Construction Schedule Using Subset Simulation
Advances in Civil Engineering, 2021
[7] Evaluating the project completion time when activity networks follow beta distribution
2020
[8] Infrastructure deployment in unprofitable areas: A techno-economic model for multiple criteria decision analysis under the European Union …
2020
[9] Evaluating the Project Completion Time When Non-Identical Beta Distributions Govern the Activity Networks
2020
[10] Schedule Risk Analysis using a Proposed Modified Variance and Mean of the Original Program Evaluation and Review Technique Model
2019
[11] From point through density valuation to individual risk assessment in the discounted cash flows method
2019
[12] A Bounding Technique for Probabilistic PERT
2019

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.