Energy and Power Engineering

Volume 5, Issue 4 (July 2013)

ISSN Print: 1949-243X   ISSN Online: 1947-3818

Google-based Impact Factor: 0.66  Citations  

The Transformer Equipment Selection’s Update Decision Technical and Economic Analysis Model

Download Download as PDF (Size: 274KB)  PP. 143-147  
DOI: 10.4236/epe.2013.54B027    4,455 Downloads   5,756 Views  Citations

ABSTRACT

Based on the current situation of the domestic transformer equipment selection, the paper analyses the SH15, S11 and S9 transformer from the angles of annual running power consumption, payback period, energy efficiency of the transformer, furthermore, determine the best optimal capacity, load factor and update Year of the SH15-type transformers. Example analysis results show that, from the point of view of the technical and economic the SH15-type transformer has better economic and environmental benefits, and large capacity SH15 transformer better comprehensive benefits.

Share and Cite:

J. Shang, Z. Tan, C. Zhang and L. Ju, "The Transformer Equipment Selection’s Update Decision Technical and Economic Analysis Model," Energy and Power Engineering, Vol. 5 No. 4B, 2013, pp. 143-147. doi: 10.4236/epe.2013.54B027.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.