Journal of Service Science and Management

Volume 3, Issue 4 (December 2010)

ISSN Print: 1940-9893   ISSN Online: 1940-9907

Google-based Impact Factor: 1.24  Citations  h5-index & Ranking

Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders

HTML  Download Download as PDF (Size: 244KB)  PP. 440-448  
DOI: 10.4236/jssm.2010.34050    5,349 Downloads   10,038 Views  Citations

Affiliation(s)

.

ABSTRACT

This paper considers an inventory system responsible for repairable equipments located at several operational sites, each in different area. When a failure occurs at the operational site, spare parts are required. We analyze a multiple-supplier inventory system that includes an internal repair shop that offers several modes of repair with different repair times and an external supplier of spare parts. The network model of the problem presented here efficiently solves the problem for deterministic demands that vary over time with backorders taken into account.

Share and Cite:

Y. Perlman and I. Levner, "Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders," Journal of Service Science and Management, Vol. 3 No. 4, 2010, pp. 440-448. doi: 10.4236/jssm.2010.34050.

Cited by

[1] Review of multi-supplier inventory models in supply chain management: An update
SSRN, 2017
[2] Inventory Models for Spare Parts Management: A Review
International Journal of Engineering Research in Africa, 2017
[3] A review of recent literature on repairable-item inventory systems
Acta Manilana, 2016
[4] Maintenance planning optimization for repairable items based on prognostics and health monitoring data
2016
[5] An integrated approach for demand forecasting and inventory management optimisation of spare parts
International Journal of Simulation and Process Modelling, 2015
[6] After sales services for repairable parts with service level agreements
2015
[7] Spare parts inventory control model for the aeronautical industry
2015
[8] A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount
Annals of Operations Research, 2014
[9] Perishable Inventory Management in Healthcare
Journal of Service Science and Management, 2014
[10] Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints
Reliability Engineering & System Safety, 2013
[11] Pre-positioning commodities to repair maritime navigational aids
Journal of Humanitarian Logistics and Supply Chain Management, 2013
[12] Maintenance Planning Optimization Based on PHM Information and Spare Parts Availability
LR Rodrigues, T Yoneyama - 72.27.231.73, 2013
[13] Pre‐positioning commodities to repair maritime navigational aids
2013
[14] مدل سازی سیستم موجودی قطعات یدکی چندسطحی با پس افت و تخفیفات کلی تأمین کننده خارجی با رویکرد شبکه‎
2013
[15] A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand
International Journal of Production Economics, 2011

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.