Journal of Software Engineering and Applications

Volume 3, Issue 9 (September 2010)

ISSN Print: 1945-3116   ISSN Online: 1945-3124

Google-based Impact Factor: 1.22  Citations  h5-index & Ranking

Benefits Management Process Complements Other Project Management Methodologies

HTML  Download Download as PDF (Size: 376KB)  PP. 839-844  
DOI: 10.4236/jsea.2010.39097    7,265 Downloads   14,646 Views  Citations

Affiliation(s)

.

ABSTRACT

The benefits management approach complements most of the common project management methodologies such as critical chain project management (CCPM), and PRINCE2. The majority of these methodologies focus on how to com-ply with three parameters: time, cost and quality instead of identifying the positive outcomes and benefits for an organization. In this paper, a different approach for the organization is presented, which focuses on positive outcomes named as benefits. Moreover, a comparison between Benefits Management and PRINCE2 methodologies is illustrated.

Share and Cite:

I. Karamitsos, C. Apostolopoulos and M. Bugami, "Benefits Management Process Complements Other Project Management Methodologies," Journal of Software Engineering and Applications, Vol. 3 No. 9, 2010, pp. 839-844. doi: 10.4236/jsea.2010.39097.

Cited by

[1] Managing complex projects in agile way of working
2022
[2] Determining the Level of Use of the Industry 4.0 Solutions in the COVID-19 Pandemic Era: Results of Empirical Research
Sustainability, 2022
[3] Modelo de gestão e captura de benefícios: desenvolvimento e Implementação de um modelo de gestão e captura de benefícios integrado na prática de gestão de …
2022
[4] Improving Project Initiation within the Australian Stevedoring Industry
2021
[5] Applicability of Agile Methodology in Technology Migration Projects: A Thematic Overview
2020
[6] CRITICAL TOP MANAGEMENT SUPPORTS THAT INFLUENCING THE PROJECT SUCCESS IN CONSTRUCTION INDUSTRY
2020
[7] Recomendaciones para Incorporar herramientas ágiles en proyectos de oil&gas para mejorar su gestión
2020
[8] Critical variables and constructs in the context of project management: importance-performance analysis
2020
[9] Building a model to improve front end project conceptualisation: introducing the Project Conceptualisation Canvas
2020
[10] Effective organizational support practices for setting target benefits in the project front end
2019
[11] Reflexões sobre uma Integração Conceitual das Abordagens Lean Manufacturing, Six Sigma e Teoria das Restrições na Solução de Problemas Comuns …
2018
[12] Reflexões sobre uma Integração Conceitual das Abordagens Lean Manufacturing, Six Sigma e Teoria das Restrições na Solução de Problemas Comuns do …
2018
[13] Value focused assessment of cyber risks to gain benefits from security investments
2018
[14] QPLAN: A Tool for Enhancing Software Development Project Performance with Customer Involvement
Handbook of Research on Strategic Alliances and Value Co-Creation in the Service Industry, 2017
[15] Applying Benefits Management to the Implementation of a Copy Point: A Case Study
International Journal of Strategic Decision Sciences (IJSDS), 2017
[16] QPLAN
2017
[17] The Benefits and Key Challenges of Agile Project Management under Recent Research Opportunities
2017
[18] Application of the project management methodology synthesis method with fuzzy input data
Eastern-European Journal of Enterprise Technologies, 2016
[19] Применение метода синтеза методологии управления проектом при нечетких исходных данных
Восточно-Европейский журнал передовых технологий, 2016
[20] Project managers' perceptions of the primary factors contributing to success or failure of projects: A qualitative phenomenological study
2015
[21] Enhancing the Quality of Planning of Software Development Projects
2015
[22] Training Needs for Project Management Professionals in the Defense Industry. J Def Stud Resour Manage 2: 2
2013
[23] Project management professional training needs for defense industry projects
2013
[24] MODELO PARA LA GESTIÓN DE LA INVESTIGACIÓN EN ENTIDADES ORIENTADAS A PROYECTOS.
2013
[25] Комплексный подход к управлению рисками инвестиционных проектов
2012
[26] ADDRESSING MAIN PROBLEMS IN PROJECT MANAGEMENT (PRINCE2) BY ADOPTING AGILE PRINCIPLES (SCRUM)
2012
[27] MODELO PARA LA GESTIÓN DE LA INVESTIGACIÓN EN ENTIDADES ORIENTADAS A PROYECTOS
2012
[28] Realisering av affärssytemets nytoeffekter: En studie om påverkansfaktorer under postimplementeringen
Thesis, 2012

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.