has been cited by the following article(s):
[1]
|
Design and Stope Stability Analysis of Multiple Concurrent Excavated Veins in Underground Mine; Case Study of Hermyingyi Tin-Tungsten (W-Sn) Mine
Geotechnical and Geological Engineering,
2023
DOI:10.1007/s10706-022-02322-3
|
|
|
[2]
|
Numerical Simulation of Crown Pillar Behaviour in Transition from Open Pit to Underground Mining
Geotechnical and Geological Engineering,
2022
DOI:10.1007/s10706-021-02022-4
|
|
|
[3]
|
Design and Stope Stability Analysis of Multiple Concurrent Excavated Veins in Underground Mine; Case Study of Hermyingyi Tin-Tungsten (W-Sn) Mine
Geotechnical and Geological Engineering,
2022
DOI:10.1007/s10706-022-02322-3
|
|
|