Open Access Library Journal

Open Access Library Journal

ISSN Print: 2333-9705
ISSN Online: 2333-9721
www.scirp.org/journal/oalibj
E-mail: service@oalib.com
"On Weak JN-Clean Rings"
written by Zubayda M. Ibraheem, Norihan N. Fadil,
published by Open Access Library Journal, Vol.9 No.8, 2022
has been cited by the following article(s):
  • Google Scholar
  • CrossRef
[1] Assessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance
Buildings, 2024
[2] Claim Management and Dispute Resolution in the Construction Industry: Current Research Trends Using Novel Technologies
Buildings, 2024
[3] BIM-Enabled Claims Management Concept: Implications for Dispute Avoidance and Management
Journal of Legal Affairs …, 2024
[4] Assessing the causes of claims in highway construction projects with a case study: a construction practitioner's perspective
Asian Journal of Civil Engineering, 2024
[5] The importance of the synergy between BIM and lean in the construction sector: A systematic literature review
AIP Conference Proceedings, 2024
[6] Using building information modelling to optimise design quality of natural lighting in Iraqi school buildings
Rudainy, AMR Mahjoob - Organization, Technology and …, 2024
[7] Comparing the Design Alternatives Using Building Information Model (BIM) and Constructability in Iraqi Construction Projects
E3S Web of Conferences, 2023
[8] Contract administration practices on building information modelling (BIM)-based construction project–an exploratory study
Facilities, 2023
[9] Assessing the Delay, Cost and Quality Risks of Claims on Construction Contract Performance
2023
[10] Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development
Journal of Construction …, 2023
[11] Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA
Buildings, 2023
[12] The effect of the combination of caffeine and taurine of different concentrations on activated B-cells
SCENTIA International Economic Review, 2022
[13] BIM AND CONSTRUCTION DISPUTE MANAGEMENT
2022
[14] Review on Benefits, Features, Applications and Implementation of Building Information Modeling (BIM) for construction project.
2022
[15] Análisis del impacto de la implementación del sistema BIM en la gestión de adquisiciones de los proyectos Albahaca y 176 Park enfocado a la optimización de …
Nieves, 2022
[16] PROYECTO INTEGRADOR
2022
[17] Inhibition of L-NAME-induced hypertension by combined treatment with apocynin and catalase: the role of Nox 4 expression
Physiological …, 2021
[18] Liver functions in combined models of the gentamicin induced nephrotoxicity and metabolic syndrome induced by high fat or fructose diets: a comparative study
Toxicological …, 2021
[19] Der Effekt unterschiedlicher Taurinkonzentrationen auf aktivierte B-Zellen
2016
[20] Implementación de la metodología BIM para optimizar el metrado y presupuesto en estructuras educativas de Lima
Free SCIRP Newsletters
Copyright © 2006-2025 Scientific Research Publishing Inc. All Rights Reserved.
Top