[1]
|
Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defecti
|
|
International Journal of Systems Science?ahead-of-print? ,
2014 |
|
|
[2]
|
Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in prod
|
|
Economic Modelling,
2014 |
|
|
[3]
|
Finite Production Rate Model With Quality Assurance, Multi-customer and Discontinuous Deliveries
|
|
Journal of Applied Research and Technology,
2014 |
|
|
[4]
|
Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products
|
|
International Journal of Systems Science,
2014 |
|
|
[5]
|
探討不完美重工之多樣產品生產系統並 (n+ 1) 次配送之生產週期和最佳配送策略與含機器當機不完美重工並多次配送策略之整合買賣方供應鏈系統之最佳生產時間
|
|
臺灣朝陽科技大學學位論文,
2014 |
|
|
[6]
|
Reexamination of “combining an alternative multi-delivery policy into economic production lot size problem with partial rework” using an alternative approach
|
|
Journal of Applied Research and Technology,
2013 |
|
|
[7]
|
Integrated inventory model with multi-retailer and rework process
|
|
The 17th World Multi-Conference on Systemics, Cybernetics and Informatics: WMSCI 2013,
2013 |
|
|
[8]
|
Reexamining an integrated inventory model with multi-retailer and rework using algebraic approach
|
|
YSP Chiu, C Hsu, MS Hsu, CC Kuo - iiis.org,
2013 |
|
|
[9]
|
Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework
|
|
Journal of Scientific & Industrial Research,
2013 |
|
|
[10]
|
Intra-supply chain system with multiple sales locations and quality assurance
|
|
Expert Systems with Applications, Elsevier,
2013 |
|
|
[11]
|
An EPQ model for an imperfect production system with rework and shortages
|
|
International Journal of Operational Research,
2013 |
|
|
[12]
|
Reexamination of
|
|
Journal of applied research and technology,
2013 |
|
|
[13]
|
A single-producer multi-retailer integrated inventory model with a rework process
|
|
International Journal for Engineering Modelling? ,
2012 |
|
|
[14]
|
Optimal production cycle time for multi-item FPR model with rework and multi-shipment policy
|
|
International Journal for Engineering Modelling,
2012 |
|
|
[15]
|
Replenishment lot sizing with an improved issuing policy and imperfect rework derived without derivatives
|
|
African Journal of Business Management,
2012 |
|
|
[16]
|
An EPQ Model of Imperfect Production Processes with Shortages and Quality Cost
|
|
International Journal of Computational and Applied Mathematics? ,
2012 |
|
|
[17]
|
Reexamining a single-producer multi-retailer integrated inventory model with rework using algebraic method
|
|
ENGINEERING MODELLING 25,
2012 |
|
|