Reducing a Lot Sizing Problem with Set up, Production, Shortage and Inventory Costs to Lot Sizing Problem with Set up, Production and Inventory Costs

HTML  XML Download Download as PDF (Size: 203KB)  PP. 282-284  
DOI: 10.4236/ajor.2017.75020    1,018 Downloads   2,097 Views  Citations

ABSTRACT

We reduce lot sizing problem with (a) Set Up, Production, Shortage and Inventory Costs to lot sizing problem with (b) Set Up, Production, and Inventory Costs. For lot sizing problem (as in (b)), Pochet and Wolsey [1] have given already integral polyhedral with polynomial separation where a linear program yield “integer” solutions. Thus problem (b) which we have created can be more easily solved by methods available in literature. Also with the removal of shortage variables is an additional computational advantage.

Share and Cite:

Sharma, R. and Ali, S. (2017) Reducing a Lot Sizing Problem with Set up, Production, Shortage and Inventory Costs to Lot Sizing Problem with Set up, Production and Inventory Costs. American Journal of Operations Research, 7, 282-284. doi: 10.4236/ajor.2017.75020.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.