Prof. Eugene Levner
School of Economics
Ashkelon Academic College, Israel
Professor
Email: levner@hit.ac.il
Qualifications
1969 Ph.D., Computer andSystems Science, Central Economic-Mathematical Institute of the Academy of Sciences of the USSR, Russia
1963 M.Sc., Computational Mathematics, Moscow State University, Russia
1963 B.Sc., Computational Mathematics, Moscow State University, Russia
Publications (Selected)
-
E. Levner, Y. Perlman, T.C.E. Cheng, I. Levner. (2011) A network approach to modelling the multi-echelon spare-part inventory system with backorders and interval-valued demand, International Journal Production Economics,v.132, pp. 43-51.
-
V. Kats andE. Levner.(2011)A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times,European Journal ofOperational Research, 209, 1, 51-56.
-
A. Che, V. Kats, E. Levner. (2011) Cyclic scheduling in robotic flowshops with bounded work-in-process levels, Naval Research Logistics 58(1), 1-16.
-
V. Kats and E. Levner. ( 2011) Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions, Journal of Scheduling, 2011,14(3), 267-279.
-
S. Sorek, W. von Igel, L. Kronaveter-Goldstein and E. Levner. (2010) Risk-dependent integrated water resources management: A conceptual model. Aqua Mundi. Journal of Water Sciences, 1(1), Am01006-1013.
-
E. Levner, V. Kats, D. Alcaide andT.C.E. Cheng. (2010) Complexity of cyclic scheduling problems: A state-of-the-art survey, Computers and Industrial Engineering, 2010, 59 (2) 352-361.
-
E. Levner: Book review ofJ. Blazewicz, K. Ecker, E. Pesch, G. Schmidt, J. Weglarz. (2009) Handbook on scheduling: from theory to applications. Journal of Scheduling, 12(4): 433-434.
-
A. Che, E. Levner, V. Kats. (2009) A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem Theoretical Computer Science, 410 (47-49), 5188-5190.
-
V. Kats and E. Levner. (2009) A polynomial algorithm for 2-cyclic robotic scheduling, Discrete Applied Mathematics, 157(2), 339-355.
-
E. Levner and J. Ganoulis. (2008) Sustainable management of water resources in transboundary river basins: risk assessment and modeling. Editorial. International Journal of Risk Assessment and Management, 10(4), 287-290.
-
J. Ganoulis and E. Levner. (2008) Risk-based integrated management of transboundary water resources: A general framework, International Journal of Risk Assessment and Management, 10(4), 291-311.
-
V. Kats and E. Levner. (2008) Parametric algorithms for cyclic scheduling problems with applications to robotics, Lecture Notes in Computer Science, vol. 5317, 653-663.
-
E. Levner, D. Alcaide and J. Ganoulis. (2008) Risk management of transboundary water resources using the green supply chain approach, International Journal of Risk Assessment and Management, 10(4), 357-372.
-
V.Kats, L.Lei, and E. Levner. (2008) Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence and time-window constraints, European Journal of Operational Research, 187(3), 1196-1211.
-
E. Levner, D. Pinto, P. Rosso, D. Alcaide and R.R.K. Sharma. (2007) Fuzzifying clustering algorithms: The case study of MajorClust, Lecture Notes in Artificial Intelligence, v. 4827, pp. 821-830.
-
E. Levner, D.Alcaide and J. Sicilia. (2007) Multi-attribute text classification using fuzzy Borda method and semantic grades, Lecture Notes in Artificial Intelligence, v. 4578, 422-429.
Profile Details
NULL