American Journal of Industrial and Business Management
Vol.9 No.1(2019), Paper ID 89939, 30
pages
DOI:10.4236/ajibm.2019.91011
A Mathematical Model: A Flexible Manufacturing System, Prone to Error, Making Two Products Each with Stochastic Demand Schedules
Issa Diop, Sylvie Nadeau, Behnam Emami-Mehrgani
Automated Production Engineering Department, école de technologie supérieure, Montréal, Canada
Mechanical Engineering Department, école de technologie supérieure, Montréal, Canada
Synetik Group, Joliette, Canada
Copyright © 2019 Issa Diop, Sylvie Nadeau, Behnam Emami-Mehrgani et al. This is
an open access article distributed under the Creative Commons Attribution
License, which permits unrestricted use, distribution, and reproduction in any
medium, provided the original work is properly cited.
How to Cite this Article
Diop, I. , Nadeau, S. and Emami-Mehrgani, B. (2019) A Mathematical Model: A Flexible Manufacturing System, Prone to Error, Making Two Products Each with Stochastic Demand Schedules.
American Journal of Industrial and Business Management,
9, 139-168. doi:
10.4236/ajibm.2019.91011.