Evaluation of Corrosion Product Activity in a Typical PWR with Extended Cycles and Flow Rate Perturbations

HTML  XML Download Download as PDF (Size: 1211KB)  PP. 24-34  
DOI: 10.4236/wjnst.2017.71003    2,554 Downloads   3,848 Views  Citations

ABSTRACT

Effect of flow rate perturbations has been studied using the modified computer program CPAIR-P for time dependent corrosion rates in Pressurized Water Reactors (PWRs) having extended cycles. In these simulations, a decrease in the corresponding saturation values of corrosion product activity (CPA) is observed for higher pH values. Comparison of CPA’s behavior has been done for constant flow-rate case as well as for transients with elevated 10B levels (~40%) in dissolved boric acid in coolant in two operating cycles. When the flow rate is decreased in the first cycle, the saturation value of CPA attains new higher values. Also, in the second operating cycle, the saturation values are about 12% higher when compared with the values in the first cycle.

Share and Cite:

Nasir, R. , Mirza, S. and Mirza, N. (2017) Evaluation of Corrosion Product Activity in a Typical PWR with Extended Cycles and Flow Rate Perturbations. World Journal of Nuclear Science and Technology, 7, 24-34. doi: 10.4236/wjnst.2017.71003.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.