[1]
|
A. Bernard and N. Perry, “Concurrent Cost Engineering for Decisional and Operational Process Enhancement in a Foundry,” International Journal of Production Economics, Vol. 109, No. 1-2, 2007, pp. 2-11.
doi:10.1016/j.ijpe.2006.11.001
|
[2]
|
S. Bordoloi and H. H. Guerrero, “Design for Control: A New Perspective on Process and Product Innovation,” International Journal of Production Economics, Vol. 113, No. 1, 2008, pp. 346-358.
doi:10.1016/j.ijpe.2007.02.043
|
[3]
|
R. Addo-Tenkorang, “Concurrent Engineering (CE): A Review Literature Report,” Proceedings of the World Congress on Engineering and Computer Science, San Francisco, 19-21 October 2011, pp. 1074-1080.
|
[4]
|
A. N. R. Callaghan, “Survey of Concurrent Engineering Practices and Their Impact of Firm Performance,” The Third World Congress of Structural and Multidisciplinary Optimization, Amherst, 17-21 May 1999, pp. 1-6.
|
[5]
|
M. Kr?mker, “An Infrastructure to Support Concurrent Engineering in Bid Preparation,” Computers in Industry, Vol. 33, No. 2-3, 1998, pp. 201-208.
doi:10.1016/S0166-3615(97)00025-0
|
[6]
|
B. A. Moges and H. Petri, “Concurrent Engineering Yes- terday, Today and Tomorrow, Improving Complex Sys- tems Today,” Springer, Berlin, 2011.
|
[7]
|
T. Kekale and A. Aslani, “Identification and Ranking of Related Creativity and Innovation Techniques with Creation of Collective Strategy by Using MADM Models Based on Fuzzy Approach,” CIVILICA, Tehran, 2010.
|
[8]
|
T. Aghaee, “Creativity and Innovation in Humans and Organizations,” Terme Publisher, Themiscyra, 2008.
|
[9]
|
J. P. Pennell and R. I. Winner, “Concurrent Engineering: Practices and Prospects,” Global Telecommunications Conference and Exhibition Communications Technology for the 1990s and Beyond, Dallas, 27-30 November 1989, pp. 647-655. doi:10.1109/GLOCOM.1989.64049
|
[10]
|
T. O. Kowang, “New Product Development in Multi-Location R&D Organization: A Concurrent Engineering Approach,” African Journal of Business Management, Vol. 5, No. 6, 2011, pp. 2264-2275.
|
[11]
|
G. Loureiro, “A Systems and Concurrent Engineering Framework for the Integrated Development of Space Products,” Acta Astronautica, Vol. 53, No. 12, 2003, pp. 945-961. doi:10.1016/S0094-5765(02)00272-2
|
[12]
|
S. C. Skalak, “Implementing Concurrent Engineering in Small Companies,” Taylor & Francis E-Library, London, 2005
|
[13]
|
N. Stankovic and T. Tillo, “Concurrent Software Engineering Project,” Journal of Information Technology Education, Vol. 8, 2009, pp. 27-41.
|
[14]
|
A. Deshpande, “Improving Concurrent Engineering Practices Team Performance: From the Lenses of Social Cognitive Theory and Expectation-States Theory,” Decision Sciences Institute, Atlanta, 2007.
|
[15]
|
T. A. Boyle, “Concurrent Engineering Teams II: Performance Consequences of Usage,” Team Performance Management, Vol. 12, No. 5-6, 2006, pp. 125-137.
doi:10.1108/13527590610687893
|
[16]
|
D. Malvius, “Integrated Information Management in Complex Product Development,” Ph.D. Thesis, KTH University, Stockholm, 2009.
|
[17]
|
D. Greenman, “Concurrent Teams, Engineering Capability Development Manager,” University of Southampton, 2011. www.soton.ac.uk
|
[18]
|
E. Dane, “Rational Versus Intuitive Problem Solving: How Thinking ‘Off the Beaten Path’ Can Stimulate Creativity,” Psychology of Aesthetics, Creativity, and the Arts, Vol. 5, No. 1, 2011, pp. 3-12.
|
[19]
|
E. Joachimsthaler, “Hidden in Plain Sight: How to Find and Execute Your Company’s Next Big Growth Strategy,” Harvard Business School Press, Boston, 2007.
|
[20]
|
J. M. Higgins, “101 Creative Problem Solving Techniques: The Handbook of New Ideas for Business,” New Management Publishing, Chicago, 2006.
|
[21]
|
N. Coade, “Be Creative: The Toolkit for Business Success,” International Thomson Business Press, Stamford, 1997.
|
[22]
|
K. James, “Organizations and Creativity: Trends in Research, Status of Education and Practice, Agenda for the Future, Handbook of Organizational Creativity,” Elsevier, Amsterdam, 2011.
|
[23]
|
J. W. Wohinz, “Creativity Techniques, Research Project,” Supported by Graz University of Technology, 2011.
http://portal.tugraz.at/portal/page/portal/Files/I3710/files/Lehrveranstaltungen/Creativity_Techniques/Creativity%20Techniques%20ws1011.pdf
|
[24]
|
A. Aslani, “Identification and Ranking of Effective Elements in Order to Success in Creation of Strategy,” 7th International Management Conference, Tehran, December 2009.
|
[25]
|
J. A. Reneke, “A Game Theory Formulation of Decision Making under Conditions of Uncertainty and Risk,” Nonlinear Analysis: Theory, Methods & Applications, Vol. 74, No. 16, 2009, pp. e1239-e1246.
|
[26]
|
A. Griffin and J. R. Hauser, “Patterns of Communication among Marketing, Engineering and Manufacturing—A Comparison between Two New Product Teams,” Management Science, Vol. 38, No. 3, 1992, pp. 360-373.
doi:10.1287/mnsc.38.3.360
|
[27]
|
G. D. Putnik, “Virtual Environments for Dynamically Reconfigurable Concurrent/Collaborative Engineering ‘virtual’ Teams,” CIRP Annals—Manufacturing Technology, Vol. 57, No. 1, 2008, pp. 171-174.
doi:10.1016/j.cirp.2008.03.022
|
[28]
|
V. B. Hinsz, “Positive Reactions to Working in Groups in a Study of Group and Individual Goal Decision-Making,” Group Dynamics: Theory, Research, and Practice, Vol. 8, No. 4, 2004. doi:10.1037/1089-2699.8.4.253
|
[29]
|
L. Trygg, “Concurrent Engineering Practices in Selected Swedish Companies: A Movement or an Activity of the Few?” Journal of Product Innovation Management, Vol. 10, No. 5, 1999, pp. 403-415.
doi:10.1016/0737-6782(93)90098-B
|
[30]
|
J. Hall, “Simultaneous Engineering,” Overseas Publishers Association, Amsterdam, 1999.
|
[31]
|
S. A. Friedley, “Building Team Cohesion: Becoming ‘We’ Instead of ‘Me’,” 2005.
http://www.nationalforensics.org/journal/vol23no1-16.pdf
|
[32]
|
M. J. Hatch, “Organization Theory: Modern, Symbolic, and Postmodern Perspectives,” Oxford University Press, Oxford, 2006.
|
[33]
|
H. Mintzberg, “Strategy Safari: A Guided Tour through the Wilds of Strategic Managemen,” Prentice Hall, Englewood Cliffs, 1998.
|
[34]
|
S. Soliman, “Systems and Creative Thinking, Center for Advancement of Postgraduate Studies and Research in Engineering Sciences,” Giza, 2005.
|
[35]
|
C. M. Slem, “Self-Management and Leadership in Concurrent Engineering Design Teams, the Annual Convention of the Western Psychological Association, 2011.
http://cla.calpoly.edu/~cslem/slem/Research/wpa.html
|
[36]
|
Z. Sarmad, “The Research Method in behavioral Science,” Aghah Publication, Tehran, 2009.
|
[37]
|
A. Ishizaka, “Review of the Main Developments in the Analytic Hierarchy Process,” Expert Systems with Applications, Vol. 38, No. 11, 2011, pp. 14336-14345.
doi:10.1016/j.eswa.2011.04.143
|
[38]
|
T. L. Saaty and K. Peniwati, “Group Decision Making: Drawing out and Reconciling Differences,” RWS Publications, Pittsburgh, 2008.
|
[39]
|
C. L. Hwang and M. J. Lin, “Group Decision Making Under Multiple Criteria: Methods and Applications,” Springer-Verlag, Berlin, 1987.
|
[40]
|
C.L. Hwang and K. Yoon, “Multiple Attribute Decision Making—Methods and Applications,” Springer-Verlag, Berlin, 1981.
|
[41]
|
P. Durance, “Scenario Building: Uses and Abuses,” Technological Forecasting and Social Change, Vol. 77, No. 9, 2010, pp. 1488-1492. doi:10.1016/j.techfore.2010.06.007
|