[1]
|
L. L. Reis, J. J. Brennan and R. M. Crisp Jr., “A Markovian Analysis for Delay at Conveyor-Serviced Production Station,” International Journal of Production Research, Vol. 5, No. 3, 1967, pp. 201-211.
doi:10.1080/00207546708929752
|
[2]
|
M. Matsui, T. Shingu and Makabe, “Conveyor-Serviced Production System: An Analytic Framework for Station-Centered Approach by Some Queueing Formulas,” Preliminary Reports of the Operations Research Society of Japan, 1997, pp. 104-107.
|
[3]
|
M. Matsui, “A Study on Optimal Operating Policies in Conveyor-Serviced Production System,” Doctoral Dissertation, Tokyo Institute of Technology, Tokyo, 1981.
|
[4]
|
M. Matsui, “Conveyor-Like Network and Balancing,” In: A. B. Savarese, Ed., Manufacturing Engineering, NOVA Science Publishers, Inc., New York, 2011, pp. 65-87.
|
[5]
|
G. C. Hunt, “Sequential Arrays of Waiting Lines,” Operations Research, Vol. 4, No. 6, 1956, pp. 674-683.
doi:10.1287/opre.4.6.674
|
[6]
|
M. Matsui, “Conveyor-Serviced Production System: Queueing Formulas, CSPS Analysis and 2-Level Mathematical Formulation,” Unpublished Paper, 1982.
|
[7]
|
R. J. Aumann, “Subjectivity and Correlation in Randomized Strategies,” Journal of Mathematical Economics, Vol. 1, No. 1, 1974, pp. 69-96.
doi:10.1016/0304-4068(74)90037-8
|
[8]
|
M. Matsui, “An Optimal Design Problem of Production and Queueing Systems, Symposium on Performance Models for Information Communication Networks,” Optimal Economic Design of Production and Queueing Systems, Abstracts of APORS’94, Fukuoka, 1994, p. 266.
|
[9]
|
M. Matsui, “A Management Game Model: Economic Traffic, Lead time and Pricing Setting,” Journal of Japan Industrial Management Association, Vol. 53, No. 1, 2002, pp. 1-9.
|
[10]
|
M. Matsui, “Manufacturing and Service Enterprise with Risks: A Stochastic Management Approach,” Springer, New York, 2008.
|
[11]
|
T. Yamada and M. Matsui, “2-Stage Design Method for Assembly Line System: A Unified Approach,” Journal of Japan Industrial Management Association, Vol. 51, No. 6, 2001, pp. 538-549.
|
[12]
|
M. Matsui and S. Ichihara, “A Game Approach to SCM: Modeling, Formulation Example and Integral Optimization,” Journal of Japan Society of Logistics Systems, Vol. 4, No. 1, 2003, pp. 67-80.
|
[13]
|
M. Matsui, “Economic (Re-)Balancing Problem: A Visualization of Invisible Hand and Ellipse Theory for Multi-Center,” Proceedings of International Conference on Production Research, Stuttgart, 31 July-3 August 2011, on CD-ROM.
|
[14]
|
M. Matsui and Y. Dai, “Parallel SCM: Balancing Issues of Make-or-Buy and Supplier-Retailers Types,” Journal of Japan Industrial Management Association, Vol. 60, No. 1, 2009, pp. 1-10.
|
[15]
|
M. Matsui, “CSPS Model: Look-Ahead Controls and Physics,” International Journal of Production Research, Vol. 43, No. 10, 2005, pp. 2001-2025.
doi:10.1080/00207540412331331416
|
[16]
|
S. A. Feyzbakhsh, M. Matsui and K. Itai, “Optimal Design of a Generalized Conveyor-Serviced Production Station: Fixed and Removal Item Cases,” International Journal of Production Economics, Vol. 55, No. 2, 1998, pp. 177-189. doi:10.1016/S0925-5273(98)00058-9
|
[17]
|
M. Matsui, “Economic Demond-Balancing Problem of Multi-Center,” In: A. Tavidze, Ed., Economics, Trade and Globalization, Progress of Economics Research, NOVA Scientific Publishers, Inc., New York, Vol. 25, 2012, pp. 227-235.
|
[18]
|
M. Matsui and M. Motohashi, “A Basic Study for Strategic Supply Chain Balancing,” Journal of Japan Society of Logistics Systems, Vol. 7, No. 1, 2007, pp.21-31.
|
[19]
|
S. Marukuni, M. Matsui and N. Ishii, “Introductory Traffic Accounting Practice for Advanced Management,” Proceedings of APIEMS 2010, Melaka, 7-10 December, 2010, on CD-ROM.
|