[1]
|
A. Gunasekaran, E. Tirtiroglu and V. Wolstencroft, “An Investigation into the Application of Agile Manufacturing in an Aerospace Company,” Technovation, Vol. 22, No. 7, pp. 405-415, 2002.
doi:10.1016/S0166-4972(01)00039-6
|
[2]
|
G. Khashsima, “A Model for Measuring Organizational Agility in Iran Television Manufacturing Industry: A Fuzzy Logic Framework,” IEEE International Engineering Management Conference, New York, 2-4 November 2003, pp. 354-358.
|
[3]
|
Y. C. Shih and C. T. Lin, “Agility Index of Manufacturing Firm - A Fuzzy Logic Based Approach,” IEEE International Engineering Management Conference, Cambridge, 18-20 August 2002, pp. 445-470.
|
[4]
|
L. M. Meade and J. Sarkis, “Analyzing Organizational Project Alternatives for Agile Manufacturing Processes: An Analytical Network Approach,” International Journal of Production Research, Vol. 37, No. 2, pp. 241-261, 1999.doi:10.1080/002075499191751
|
[5]
|
N. C. Tsourveloudis and K. P. Valavanis, “On the Measurement of Enterprise Agility,” Journal of Intelligent and Robotic Systems, Vol. 33, No. 3, 2002, pp. 329-342.doi:10.1023/A:1015096909316
|
[6]
|
M. Jackson and C. Johansson, “An Agility Analysis from a Production System Perspective,” Integrated Manufacturing Systems, Vol. 14, No. 6, 2003, pp. 482-488. doi:10.1108/09576060310491342
|
[7]
|
R. E. Giachetti, L. D. Martinez, O. A. Saenz and C. S. Chen, “Analysis of the Structural Measures of Flexibility and Agility Using a Measurement Theoretical Framework,” International Journal of Production Economics, Vol. 86, No. 1, 2003, pp. 47-62.
doi:10.1016/S0925-5273(03)00004-5
|
[8]
|
B. M. Artet and R. E. Giachetti, “A Measure of Agility as the Complexity of the Enterprise System,” Robotics and Computer-Integrated Manufacturing, Vol. 20, No. 6, 2004, pp. 495-503. doi:10.1016/j.rcim.2004.05.008
|
[9]
|
H. Sharifi and Z. Zhang, “A Methodology for Achiev-ing Agility in Manufacturing Organization: An Intro-duction,” International Journal of Production Econom-ics, Vol. 62, No. 1-2, 1999, pp. 7-22.
doi:10.1016/S0925-5273(98)00217-5
|
[10]
|
H. Sharifi and Z. Zhang, “Agile Manufacturing in Practice-Application of a Methodology,” International Journal of Operations and Production Management, Vol. 21, No. 5-6, 2001, pp. 772-794.
doi:10.1108/01443570110390462
|
[11]
|
Z. Zhang and H. Sharifi, “A Methodology for Achieving Agility in Manufacturing Organizations,” International Journal of Operations and Production Management, Vol. 20, No. 4, 2000, pp. 496-512.
doi:10.1108/01443570010314818
|
[12]
|
D. B. Sieger, A. B. Badiru and Mibatovic, M., “A Metric for Agility Measurement in Product Development,” IIE Transactions, Vol. 32, 2000, pp. 637-645.
doi:10.1080/07408170008967422
|
[13]
|
I.H. Garbie, H.R. Parsaei and H.R. Leep, “A Novel Approach for Measuring Agility in Manufacturing Firms,” International Journal of Computer Applications, Vol. 32, No. 2, 2008, pp. 95-103.
doi:10.1504/IJCAT.2008.020334
|
[14]
|
I. H. Garbie, “New Evaluation of Industrial Enterprises,” Proceedings of ICAMM, Muscat, 13-15 December 2010, pp. 13-15.
|
[15]
|
A. Gunasekaran, “Agile Manufacturing: A framework for Research and Development,” International Journal of Production Economics, Vol. 62, 1999, pp. 87-105.
doi:10.1016/S0925-5273(98)00222-9
|
[16]
|
A. Gunasekaran, “Design and Implementation of Agile Manufacturing Systems,” International Journal of Economics, Vol. 62, 1999, pp. 1-6.
|
[17]
|
C. A. Yauch, “Team-Based Work and Work System Balance in the Context of Agile Manufacturing,” Applied Ergonomics, Vol. 38, 2007, pp. 19-27.
doi:10.1016/j.apergo.2006.02.002
|
[18]
|
R. C. Kharbanda, “Measurement of Agility in Manufacturing Systems. A fuzzy Logic Approach,” Proceedings of the World Congress on Engineering, London, 2-4 July 2008.
|
[19]
|
D. V. Bustelo and L. Avella, “Agile Manufacturing: Industrial Case Studies in Spain,” Technovation, Vol. 26, 2006, pp. 1147-1161.
doi:10.1016/j.technovation.2005.11.006
|
[20]
|
W. J. Hopp and M. P. V. Oyen, “Agile Workforce Evaluation: A Framework for Cross-Training and Coordination,” IIE Transactions, Vol. 36, No. 10, 2004, pp. 919-940. doi:10.1080/07408170490487759
|
[21]
|
L. M. Sanchez and R. Nagi, “A Review of Agile Manufacturing Systems,” International Journal of Production Research, Vol. 39, No. 16, 2001, pp. 3561-3600.
doi:10.1080/00207540110068790
|
[22]
|
H. Sharifi, H.S. Ismail and I. Reid, “Achieving Agility in Supply Chain through Simultaneous Design Of and Design For Supply Chain,” Journal of Manufacturing Technology Management, Vol. 17, No. 8, 2006, pp. 1078-1098. doi:10.1108/17410380610707393
|
[23]
|
G. Ramesh, “Literature Review on the Agile Manufacturing Criteria,” Journal of Manufacturing Technology Management, Vol. 18, No. 2, 2007, pp. 182-201.
doi:10.1108/17410380710722890
|
[24]
|
S. Vinodh, G. Sundararaj and S. R. Devadasan, “Total Agile Design System Model via Literature Exploration,” Industrial Management and Data Systems, Vol. 109, No. 4, 2009, pp. 570-588. doi:10.1108/02635570910948678
|
[25]
|
S. Vinodh, G. Sundararaj, S. R. Devadasan, D. Kuttalingam and D. Rajanayagam, “Achieving Agility in Manufacturing through Finite Element Mould Analysis,” Journal of Manufacturing Technology Management, Vol. 21, No. 5, 2010, pp. 604-623.
doi:10.1108/17410381011046995
|
[26]
|
E. S. Bernardes and M. D. Hanna, “A Theoretical Review of Flexibility, Agility and Responsiveness in the Operations Management Literature: Towards a Conceptual Definition of Customer Responsiveness,” International Journal of Operations and Production Management, Vol. 29, No. 1, 2009, pp. 30-53.
doi:10.1108/01443570910925352
|
[27]
|
E. O. Adeleye and Y. Y. Yusuf, “Towards Agile Manufacturing: Models of Competition and Performance Outcomes,” International Journal Agile Systems and Management, Vol. 1, No. 1, 2006, pp. 93-110.
|
[28]
|
S. Vinodh, G. Sundararaj, S. R. Devadasan, R. Maharaja, D. Rajanayagam and S. K. Goyal, “DESSAC: A Decision Support System for Quantifying and Analyzing Agility,” International Journal of Production Research, Vol. 46, No. 23, 2008, pp. 6759-6780.
doi:10.1080/00207540802230439
|
[29]
|
E. Bottani, “Profile and Enablers of Agile Companies: An Empirical Investigation,” International Journal of Production Economics, Vol. 125, No. 2, 2010, pp. 251-261.
doi:10.1016/j.ijpe.2010.02.016
|
[30]
|
B. H. Maskell, “Software and the Agile Manufacturer - Computer Systems and World Class Manufacturing,” Productivity Press, Portland, 1994.
|
[31]
|
J. C. Montgeomery and L. O. Levine, “The Transition to Agile Manufacturing Staying Flexible for Competitive Advantage,” ASQC Quality Press, Milwaukee, 1996.
|
[32]
|
J. D. Oleson, “Pathways to Agility-Mass Customization in Action,” John Wiley & Sons, Hoboken, 1998.
|
[33]
|
J. H. Paek, Y. W. Lee and T. R. Napier, “Selection of Design/Build Proposal Using Fuzzy-Logic System,” Journal of Construction Engineering and Management, Vol. 118, 1992, pp. 354-358.
doi:10.1061/(ASCE)0733-9364(1992)118:2(303)
|
[34]
|
H. J. Zimmermann, “Fuzzy Set Theory and Its Applications,” 2nd Edition, Kluwer Academic Publishers, Boston, 1991.
|
[35]
|
E. S. Lee and R. L. Li, “Comparison of Fuzzy Numbers Based on the Probability Measure of Fuzzy Events,” Computer and Mathematics with Applications, Vol. 15, 1988, pp. 887-896. doi:10.1016/0898-1221(88)90124-1
|
[36]
|
I. H. Garbie, “A Roadmap for Reconfiguring Industrial Enterprises as a Consequence of Global Economic Crisis (GEC),” Journal of Service Science and Management, Vol. 3, No. 4, 2010, pp. 419-428.
doi:10.4236/jssm.2010.34048
|