American Journal of Industrial and Business Management

Volume 4, Issue 9 (September 2014)

ISSN Print: 2164-5167   ISSN Online: 2164-5175

Google-based Impact Factor: 0.92  Citations  

Comparison of Alberta Industrial and Pipeline Projects and US Projects Performance

HTML  Download Download as PDF (Size: 3027KB)  PP. 474-481  
DOI: 10.4236/ajibm.2014.49053    3,163 Downloads   3,544 Views  Citations

ABSTRACT

Project performance issues are major concerns in Alberta. This paper compares the projects executed in Alberta and US projects. The paper analyses the projects performance in Alberta and compares it with US projects with a view to improve project performance in Alberta. 17 participating companies in Alberta provided the previous projects data and COAA/CII database provided the US data for the analysis. A qualitative research methodology was also employed in investigating the Alberta project performance. Interviews were conducted with industry practitioners, which contained open-ended questions. The research found that in comparison, the Alberta projects showed higher average cost and schedule growth than the US projects and the US based projects were more productive in erecting structural steel than Alberta projects. This method has the potential to contribute to a reduction in cost and schedule overruns, and improves project performance. It is concluded that comparison of projects executed in Alberta and US projects can provide a guide to companies to improve performance in Alberta.

Share and Cite:

Ikpe, E. , Kumar, J. and Jergeas, G. (2014) Comparison of Alberta Industrial and Pipeline Projects and US Projects Performance. American Journal of Industrial and Business Management, 4, 474-481. doi: 10.4236/ajibm.2014.49053.

Cited by

[1] Implementation of the neural networks for improving the projects' performance of steel structure projects
Journal of Industrial …, 2022
[2] The Study of Artificial Intelligent in Risk-Based Inspection Assessment and Screening: A Study Case of Inline Inspection
… -ASME Journal of …, 2022
[3] Feasibility Assessment and Enhancement of TOF-Based UWB RTLS for Non-Line-of-Sight Conditions on Construction Sites
2022
[4] Factors Impacting Cost Growth on Heavy Industrial Projects in Alberta
2020
[5] Understanding project evaluation–a review and reconceptualization
2019
[6] Factors Affecting Construction Labor Productivity for Construction of Pre-Stressed Concrete Bridges
2018
[7] The Impact of Design Changes on Project Performance in Oil Industry Projects
2016
[8] FACTORS AFFECTING CONSTRUCTION LABOR HEALTH, PRODUCTIVITY FOR CONSTRUCTION OF PRE-STRESSED CONCRETE BRIDGES

Copyright © 2023 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.