[1]
|
An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with sequence dependent setup times
4OR,
2023
DOI:10.1007/s10288-023-00535-7
|
|
|
[2]
|
A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness
Engineering Optimization,
2023
DOI:10.1080/0305215X.2022.2144274
|
|
|
[3]
|
Research on optimization method of routing buffer linkage based on Q-learning
Journal of Physics: Conference Series,
2022
DOI:10.1088/1742-6596/2187/1/012058
|
|
|
[4]
|
A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness
Engineering Optimization,
2022
DOI:10.1080/0305215X.2022.2144274
|
|
|
[5]
|
Minimization of Penalties for Tardiness in a Flow Shop Systems
2020 2nd International Conference on Control Systems, Mathematical Modeling, Automation and Energy Efficiency (SUMMA),
2020
DOI:10.1109/SUMMA50634.2020.9280812
|
|
|
[6]
|
An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption
Computers & Industrial Engineering,
2020
DOI:10.1016/j.cie.2020.106431
|
|
|
[7]
|
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
Applied Mathematics and Computation,
2020
DOI:10.1016/j.amc.2019.124688
|
|
|
[8]
|
Scheduling of Multi-variety and Small-Batch Motor Manufacturing Based on Simulated Annealing Adaptive Genetic Algorithms
2019 5th International Conference on Control, Automation and Robotics (ICCAR),
2019
DOI:10.1109/ICCAR.2019.8813358
|
|
|
[9]
|
Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach
Computers & Industrial Engineering,
2019
DOI:10.1016/j.cie.2019.07.054
|
|
|
[10]
|
Six sigma for gamma-distributed processes: a case study in oil and gas
International Journal of Quality & Reliability Management,
2018
DOI:10.1108/IJQRM-04-2017-0079
|
|
|
[11]
|
On the exact solution of the no-wait flow shop problem with due date constraints
Computers & Operations Research,
2017
DOI:10.1016/j.cor.2016.12.013
|
|
|
[12]
|
A survey of scheduling problems with no-wait in process
European Journal of Operational Research,
2016
DOI:10.1016/j.ejor.2016.05.036
|
|
|
[13]
|
An Enumeration Algorithm for the No-Wait Flow Shop Problem with Due Date Constraints
IFAC-PapersOnLine,
2016
DOI:10.1016/j.ifacol.2016.07.844
|
|
|
[14]
|
The third comprehensive survey on scheduling problems with setup times/costs
European Journal of Operational Research,
2015
DOI:10.1016/j.ejor.2015.04.004
|
|
|