Biography

Dr. Yoonseok Shin

Plant and Architectural Engineering

Kyonggi University

Assistant Professor


Email: ssamnima@gmail.com


Publications(Selected)

  1. Shin Y., Kim T., Cho H., Kang K. I. (2012), A formwork method selection model based on boosted decision trees in tall building construction, Automation in Construction, 23, 47-54.
  2. Shin Y., Cho H., Kang K. I. (2011), Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction, Automation in Construction, 20, 5, 550-558.
  3. Shin Y., Kim D. W., Kim J. Y., Kang K. I., Cho M. Y., Cho H.H. (2009), Application of AdaBoost to the Retaining Wall Method Selection in Construction, Journal of Computing in Civil Engineering, 24, 3, 188-192.
  4. Shin Y., An S. H., Cho H.H., Kim G. H, Kang K. I. (2008), Application of information technology for mass customization in the housing construction industry in Korea, 17, 831-838.
  5. Kim G. H., Shin Y. (2013), Predicting compressive strength of recycled aggregate concrete by multiple regression analysis, Applied Mechanics and Materials, 253-255, 546-549.
  6. Shin Y., Kim G. H. (2013), Comparison of the factors improving construction productivity between Korean and Chinese laborers in Korea, Applied Mechanics and Materials, 256-259, 3016-3019.
  7. Kim G. H., Won D. M., Kim K. G., Shin Y. (2013), An Economic Analysis of a New and Renewable Energy System installed at a Public Building, Applied Mechanics and Materials, 291-294, 1140-1143.
  8. Kim G. H., Nam S. H., Hwang S. J., Choi H. B., Shin Y. (2013), Evaluating Construction Workers’ Understanding of Safety Signs, Applied Mechanics and Materials, 291-294, 3024-3027.
  9. Kim G. H., Shin Y., Kim T. Y., Lee Y. D. (2013), Case Study of the Application of a Digital Pen to a Defect Checklist of an Apartment Housing Project, Applied Mechanics and Materials, 303-306, 2303-2306.
  10. Cho C. Y., Cho M. Y., Shin Y. (2012), Prediction Model for Hoisting Times of Tower Crane using Discrete-Event Simulation in High-rise Building Construction, Journal of Architectural Institute of Korea, 28, 1, 151-158.
  11. Shin Y. (2012), Construction Lift Planning System in Tall Building Construction, Journal of Architectural Institute of Korea, 27, 11, 227-235.
  12. Cho C. Y., Shin Y., Won S., Kim J. W., Cho M. Y. (2011), An Algorithm for Hoisting Time Calculation in Super-tall Building Construction, Journal of Korea Institute of Construction Engineering and Management, 12, 6, 120-129.
  13. Shin Y., Kang K. I. (2010), Construction Lift Planning Model Using Discrete-Event Simulation in Tall Building Construction, Journal of Architectural Institute of Korea, 26, 9, 119-127.
  14. Jin I. G., Shin Y., Cho H., Kang K. I. (2009), Development of Component Design Process for Automated Construction System, Journal of Korea Institute of Construction Engineering and Management, 10, 4, 76-86.
  15. Shin Y., Yoo W. S., Kim D. Y., Cho H.H., Kang K. I. (2009), Factor Analysis on Defect Repair and Maintenance Cost for Asset Management of Apartment Housing, Journal of Architectural Institute of Korea, 25, 6, 179-186.
  16. Shin Y., Cho H., Kang K. I. (2009), Implementable strategy on asset management of domestic public rental housing, Journal of the Korea Institute of Building Construction, 9, 2, 103-110.
  17. Shin Y., Jin I. G., An S. H., Cho H. H., Kang K. I. (2008), A study of Operation Criteria of Tower-crane for Automatic Transportation Considering Swung Member, Journal of Korea Institute of Construction Engineering and Management, 9, 2, 108-116.

Profile Details

Null

Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top