has been cited by the following article(s):
[1]
|
A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability
Cogent Engineering,
2018
DOI:10.1080/23311916.2018.1531455
|
|
|
[2]
|
A fuzzy periodic review integrated inventory model involving stochastic demand, imperfect production process and inspection errors
Cogent Engineering,
2017
DOI:10.1080/23311916.2017.1308653
|
|
|
[3]
|
A periodic review integrated inventory model with controllable safety stock and setup cost under service level constraint and distribution-free demand
Journal of Physics: Conference Series,
2017
DOI:10.1088/1742-6596/855/1/012022
|
|
|