[1]
|
A. Czvallo and M. Di Natale, “A Fuzzy Control Strategy for the Regulation of an Artificial,” Sustainable World, Sustainable Planning and Development, Vol. 6, 2003, pp. 629-639.
|
[2]
|
B. J. Lence, M. I. Latheef and D. H. Burn, “Reservoir Management and Thermal Power Generation,” Journal of Water Resources Planning and Management, Vol. 118, No. 4, 1992, pp. 387-405.
doi:10.1061/(ASCE)0733-9496(1992)118:4(388)
|
[3]
|
Q. H. Cai, “Taking Eco-System Protection into Fully Consideration and Improving Reservoir Regulation Proc- ess,” China Water Resources, Vol. 2, 2006, pp. 14-17.
|
[4]
|
Z. J. Yin, W. Huang and J. Chen, “On Management Sys- tem of Ecological Regulation of Cascade Reservoirs in the Yangtze Basin,” Yangtze River, Vol. 39, No. 20, 2008, pp. 15-17.
|
[5]
|
Z. R. Dong, D. Y. Sun and J. Y. Zhao, “Multi-Objective Ecological Operation of Reservoirs,” Water Resources and Hydropower Engineering, Vol. 38, No. 1, 2007, pp. 28-32.
|
[6]
|
L. Liu, Z. C. Dong and G. B. Cui, “The Lowest Ecologi- cal Water Demand to Prevent the River Sediment Accu- mulation,” Journal of Lake Science, Vol. 38, No. 1, 2007, pp. 28-32.
|
[7]
|
Z. F. Yang, J. L. Liu, T. Sun, et al., “Rules of Eco-Envi- ronment Water Demand in a Drainage Basin,” Science Press, Beijing, 2006.
|
[8]
|
H. P. Hu, D. F. Liu, F. Q. Tian and G. H. Ni, “A Method of Ecological Reservoir Reoperation Based-on Ecological Flow Regime,” Advances in Water Science, Vol. 19, No. 3, 2008, pp. 325-332.
|
[9]
|
W. G. Yu, Z. Q. Xia, G. R. Yu and Y. P. Cai, “Analysis of Ecological Ideas and Measures in Reservoir Schedul- ing,” Journal of Shangqiu Teachers College, Vol. 22, No. 5, 2006, pp. 148-151.
|
[10]
|
Z. F. Yang, B. S. Cui, J. L. Liu, et al., “Eco-Environment Water Demand: Theories Methods and Practices,” Science Press, Beijing, 2003.
|
[11]
|
J. D. C. Little, “The Use of Storage Water in a Hydroe- lectric System,” Operational Research, Vol. 3, No. 2, 1955, pp. 187-197. doi:10.1287/opre.3.2.187
|
[12]
|
J. A. Ahmed and A. K. Sarma, “Genetic Algorithm for Op- timal Operating Policy of a Multipurpose Reservoir,” Water Resources Management, Vol. 19, No. 2, 2005 pp. 145-161. doi:10.1007/s11269-005-2704-7
|
[13]
|
G. W. Ma and L. Wang, “Application of a Genetic Algo- rithm to Optimal Operation of Hydropower Station,” Ad- vances in Water Science, Vol. 8, No. 3, 1997, pp. 275- 280.
|
[14]
|
C. M. Ji, Y. Q. Wu and Y. K. Zhang, “Optimal Schedul- ing of Hydroelectric Station Based on Chaotic Particle Swarm Optimization,” Journal of North China Electric Power University (Natural Science Edition), Vol. 35, No. 6, 2008, pp. 103-107.
|
[15]
|
L. Qiu, J. H. Tian, C. Q. Duan, et al., “The Application of Chaos-Optimization Algorithm in Reservoir Optimal Op- eration,” China Rural Water and Hydropower, Vol. 30, No. 7, 2005, pp. 17-19.
|
[16]
|
W. C. Wang, C. T. Cheng and D. M. Xu, “The Optimal Operation Model Based on Chaos Genetic Algorithm for Hydropower Station and Its Application,” Journal of Hydroelectric Engineering, Vol. 26, No. 6, 2006, pp. 7-11.
|