Scientific Research An Academic Publisher
OPEN ACCESS
Add your e-mail address to receive free newsletters from SCIRP.
Select Journal AA AAD AAR AASoci AAST ABB ABC ABCR ACES ACS ACT AD ADR AE AER AHS AID AiM AIT AJAC AJC AJCC AJCM AJIBM AJMB AJOR AJPS ALAMT ALC ALS AM AMI AMPC ANP APD APE APM ARS ARSci AS ASM BLR CC CE CellBio ChnStd CM CMB CN CRCM CS CSTA CUS CWEEE Detection EMAE ENG EPE ETSN FMAR FNS GEP GIS GM Graphene GSC Health IB ICA IIM IJAA IJAMSC IJCCE IJCM IJCNS IJG IJIDS IJIS IJMNTA IJMPCERO IJNM IJOC IJOHNS InfraMatics JACEN JAMP JASMI JBBS JBCPR JBiSE JBM JBNB JBPC JCC JCDSA JCPT JCT JDAIP JDM JEAS JECTC JEMAA JEP JFCMV JFRM JGIS JHEPGC JHRSS JIBTVA JILSA JIS JMF JMGBND JMMCE JMP JPEE JQIS JSBS JSEA JSEMAT JSIP JSS JSSM JST JTR JTST JTTs JWARP LCE MC ME MI MME MNSMS MPS MR MRC MRI MSA MSCE NJGC NM NR NS OALib OALibJ ODEM OJA OJAB OJAcct OJAnes OJAP OJApo OJAppS OJAPr OJAS OJBD OJBIPHY OJBM OJC OJCB OJCD OJCE OJCM OJD OJDer OJDM OJE OJEE OJEM OJEMD OJEpi OJER OJF OJFD OJG OJGas OJGen OJI OJIC OJIM OJINM OJL OJM OJMC OJMetal OJMH OJMI OJMIP OJML OJMM OJMN OJMP OJMS OJMSi OJN OJNeph OJO OJOG OJOGas OJOp OJOph OJOPM OJOTS OJPathology OJPC OJPChem OJPed OJPM OJPP OJPS OJPsych OJRA OJRad OJRD OJRM OJS OJSS OJSST OJST OJSTA OJTR OJTS OJU OJVM OPJ POS PP PST PSYCH SAR SCD SGRE SM SN SNL Soft SS TEL TI UOAJ VP WET WJA WJCD WJCMP WJCS WJET WJM WJNS WJNSE WJNST WJV WSN YM
More>>
X. H. Liu, “The Necessity and the Software Realization Data Positive Treatment in Factor Analysis,” Journal of Chongqing Institute of Technology (Natural Science), Vol. 23, No. 9, 2009, pp. 152-155.
has been cited by the following article:
TITLE: Study on Validity of Logistics Risk Early Warning Model in Manufacturing Enterprises: Based on the Listed Corporation of Manufacturing Industry in Beijing Area
AUTHORS: Yongsheng Liu, Jiayu Gao, Wenjie Ma
KEYWORDS: Manufacturing Enterprise; Enterprise Logistics Risk; Principal Components Analysis; Risk Early Warning; Validity
JOURNAL NAME: Journal of Service Science and Management, Vol.6 No.2, June 17, 2013
ABSTRACT: In order to formulate the logistics risk early warning model of listed corporations of manufacturing industry in Beijing area,40 A-stock listed companies of manufacturing enterprise in Beijing area are taken as the study samples, the principal components analysis method is applied to the logistics risk index of Sample Firms in 2009-2011 for extracting principal components to achieve simplified indicators. The validity of the constructed model is tested, the strengths and limitations of the early warning model are analyzed and the ways to improve the validity of the early warning model are proposed.
Related Articles:
Comment on the Paper “Condom-Assisted Transurethral Resection: A New Surgical Technique for Urethral Tumor”, Surgical Science, Vol. 1, 2010, pp. 46-48
Guven Aslan
DOI: 10.4236/ss.2011.24042 4,535 Downloads 7,501 Views Citations
Pub. Date: June 23, 2011
Research on Realization of Petrophysical Data Mining Based on Big Data Technology
Yu Ding, Rui Deng, Chao Zhu
DOI: 10.4236/ojogas.2018.31001 650 Downloads 1,190 Views Citations
Pub. Date: January 31, 2018
Erratum to “Multilevel B-Spline Repulsive Energy in Nanomodeling of Graphenes” [Journal of Surface Engineered Materials and Advanced Technology Vol. 4 No. 2 (April 2014) 75-86]
Maharavo Randrianarivony
DOI: 10.4236/jsemat.2015.52009 3,504 Downloads 4,265 Views Citations
Pub. Date: March 24, 2015
Students’ Journal Paper Citing and Choice of Publisher: The Mediating Roles of Impact Factor and H-Index as Bibliometric Measures
Abdul Razak Ahmed, Xiaoyang Zhang, Shi Yu
DOI: 10.4236/oalib.1105696 246 Downloads 392 Views Citations
Pub. Date: September 3, 2019
Sign Language Interpreters: Perception Analysis about Working with Deaf Students in a Federal Institute of Education, Science and Technology in the Northern Region of Brazil
Cesar Gomes de Freitas, Cristina Maria Delou, Gildete da Silva Amorim, Edilene de Melo Teixeira, Helena Carla Castro
DOI: 10.4236/ce.2017.84050 1,078 Downloads 2,022 Views Citations
Pub. Date: April 30, 2017