Microclimatic Factors Effect on Productivity of Construction Industry
AUTHORS:
Hatim A. Rashid
KEYWORDS:
Heat, Dust Storm, Productivity, Gulf Region, Construction Materials
JOURNAL NAME:
Open Journal of Civil Engineering,
Vol.4 No.2,
June
27,
2014
ABSTRACT:
It is apparent that
heat can hamper timing and productivity of construction work that occurs outside.
There are many types of construction changes and each type can have an effect
on labor and machinery productivity. But what is the effect of extreme heat
& humidity and dust storm on construction industry can occur either indoor
or outdoor work. Construction materials production data from main four
companies in the Gulf region over five years period were collected. This study
found that the adverse sever summer climate of heat and dust storms lead to a
significant reduction in production. An average of week with six days during summers
of heat exceeding 46C with high humidity reduces production in the
week by 10% on average. A cross the regional companies, severe weather reduce
production on average by 7% and delay the deliveries date. While it is possible
that companies are able to recover these losses at some later date of summers.
Further, even if recovery does occur at some point at very least these shocks
are costly as they increase the volatility of production. Also this study
concludes useful results for assessing the potential productivity shock
associate with inclement weather as well as guiding managers on where to locate
a new production facility. We recommend developing of empirical model for Heat
Prediction in the region to expect to become more relevant as climate severity
and frequent of severe weather.