[1]
|
E. W. Taft, “The Most Economical Production Lot,” Iron Age, Vol. 101, 1918, pp. 1410-1412.
|
[2]
|
S. K. Goyal, “Integrated Inventory Model for a Single Supplier-Single Customer Prob-lem,” International Journal of Production Research, Vol. 15, No. 1, 1977, pp. 107-111.
|
[3]
|
L. B. Schwarz, B. L. Deuer-meyer and R. D. Badinelli, “Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System,” Management Science, Vol. 31, No. 4, 1985, pp. 488-498.
|
[4]
|
L. Lu, “A One-Vendor Multi-Buyer Integrated Inventory Model,” European Journal of Operational Research, Vol. 81, No. 2, 1995, pp. 312-323.
|
[5]
|
R. A. Sarker and L. R. Khan, “Optimal Batch Size for a Production System Operating under Periodic Delivery Policy,” Computers and Industrial Engineering, Vol. 37, No. 4, 1999, pp. 711-730.
|
[6]
|
S. Viswanathan and R. Piplani, “Coordinating Supply Chain Inventories through Common Replenishment Epochs,” European Journal of Operational Research, Vol. 129, No. 2, 2001, pp. 277-286.
|
[7]
|
M. Eben-Chaime, “The Effect of Discreteness in Vendor- Buyer Relationships,” IIE Transactions, Vol. 36, No. 6, 2004, pp. 583-589.
|
[8]
|
R. M. Hill and M. Omar, “Another Look at the Single- Vendor Single-Buyer Integrated Production-Inventory Problem,” International Journal of Production Research, Vol. 44, No. 4, 2006, pp. 791-800.
|
[9]
|
Y.-S. P. Chiu, S. W. Chiu, C.-Y. Li, and C.-K. Ting, “Incorporating Multi-Delivery Policy and Quality Assurance into Economic Production Lot Size Problem,” Journal of Scientific & Indus-trial Research, Vol. 68, No. 6, 2009, pp. 505-512.
|
[10]
|
M. J. Rosenblatt and H. L. Lee, “Economic Production Cycles with Imperfect Production Processes,” IIE Transactions, Vol. 18, No. 1, 1986, pp. 48-55.
|
[11]
|
K. Moinzadeh and P. Aggarwal, “Analysis of a Production/Inventory System Subject to Ran-dom Disruptions,” Management Science, Vol. 43, No. 11, 1997, pp. 1577- 1588.
|
[12]
|
A. Chelbi and N. Rezg, “Analysis of a Production/In- Ventory System with Randomly Failing Production Unit Subjected to a Minimum Required Availability Level,” International Journal of Production Economics, Vol. 99, 2006, pp. 131-143.
|
[13]
|
S. W. Chiu, Y.-S. P. Chiu and C.-C. Shih, “Determining Expedited Time and Cost of the End Product with Defective Component Parts Using Critical Path Method (CPM) and Time-Costing Method,” Journal of Scien-tific & Industrial Research, Vol. 65, No. 9, 2006, pp. 695-701.
|
[14]
|
J. Li, D. E. Blumenfeld and S. P. Marin, “Pro-duction System Design for Quality Robustness,” IIE Transactions, Vol. 40, No. 3, 2008, pp. 162-176.
|
[15]
|
K-Y. C. Yu and D. L. Bricker, “Analysis of a Markov Chain Model of a Multi-stage Manufacturing System with Inspection, Rejection, and Rework,” IIE Transactions, Vol. 25, No. 1, 1993, pp. 109-112.
|
[16]
|
A. M. M. Jamal, B. R. Sarker and S. Mondal, “Optimal Manufacturing Batch Size with Rework Process at a Single-Stage Production System,” Computers & Industrial Engineering, Vol. 47, No. 2, 2004, pp. 77-89.
|
[17]
|
S. W. Chiu and Y.-S. P. Chiu, “Mathematical Modeling for Production System with Backlogging and Failure in Repair,” Journal of Scientific & Industrial Research, Vol. 65, 2006, pp. 499-506.
|
[18]
|
S. W. Chiu, “Production Run Time Problem with Machine Breakdowns under AR Control Policy and Re-work,” Journal of Scientific & Industrial Research, Vol. 66, No. 12, 2007, pp. 979-988
|
[19]
|
S. W. Chiu, K.-K. Chen and H.-H. Chang, “Mathematical Method for Expediting Scrap-or-Rework Decision Making in EPQ Model with Failure in Repair,” Mathematical and Computational Applications, Vol. 13, No. 3, 2008, pp. 137-145.
|
[20]
|
S. W. Chiu, “Robust Planning in Optimization for Production System Subject to Random Machine Breakdown and Failure in Rework,” Computers & Operations Research, Vol. 37, No. 5, 2010, pp. 899-908.
|
[21]
|
R. W. Grubbstr?m and A. Erdem, “The EOQ with Backlogging Derived without Derivatives,” International Journal of Production Economics, Vol. 59, No. 1-3, 1999, pp. 529-530.
|
[22]
|
S. W. Chiu, “Production Lot Size Problem with Failure in Repair and Backlogging Derived without Deriva-tives,” European Journal of Operational Research, Vol. 188, No. 2, 2008, pp. 610-615.
|
[23]
|
S. W. Chiu, C.-B. Cheng, M.-F. Wu and J.-C. Yang, “An Algebraic Approach for Determining Optimal Lot Size for EPQ Model with Rework Process,” Mathematical and Computational Applications, Vol. 2010, No. 3, 2010, pp. 364-370.
|
[24]
|
S. W. Chiu, H.-D. Lin, C.-B. Cheng and C.-L. Chung, “Optimal Production-Shipment Decisions for the Finite Production Rate Model with Scrap,” International Journal for Engineering Modelling, Vol. 22, No. 1-4, 2009, pp. 15-24.
|