[1]
|
B. Weinstein and T. Clower, “The Impact of the Union Pacific Service Disruptions on the Texas and National Economies: An Unfinished Story,” Railroad Commission of Texas, Austin, February 1998.
|
[2]
|
“Joint Petition for Service Order, STB Service Order No. 1518,” Surface Transportation Board, Washington DC, 31 October 1997.
|
[3]
|
Transportation Re-search Board of the National Academies, “US Railroad Effi-ciency: A Brief Economic Overview,” Proceedings of the Workshop on Research to Enhance Rail Network Performance, Washington DC, 5-6 April 2006, pp. 63-71.
|
[4]
|
M. Dessouky, Q. Lu, J. Zhao and R. Leachman, “An Exact Solution Proce-dure to Determine the Optimal Dispatching Times for Complex Rail Networks,” IEE Transactions, Vol. 32, No. 2, 2006, pp. 141-152.
|
[5]
|
M. Khan, D. Zhang, M. Jun and J. Zhu, “An Intelligent Search Technique to Train Scheduling Problem Based on Genetic Algorithms,” Proceedings of the 2006 Inter-national Conference on Emerging Technologies, Perhwar, 13-14 November 2006, pp. 593-598.
doi:10.1109/ICET.2006.335970
|
[6]
|
A. Tazoniero, R. Gon-claves and F. Gomide, “Decision Making Strategies for Real Time Train Dispatch and Control Analysis and Design of Intel-ligent Systems Using Soft Computing Techniques,” Advances in Soft Computing, Springer, Vol. 41, 2007, pp. 193-204.
|
[7]
|
F. Li, Z. Gao, K. Li and L. Yang, “Efficient Scheduling of Railway Traffic Based on Global Information of Train,” Transportation Research, Part B: Methodological, Vol. 42, No. 10, 2008, pp. 1008-1030.
|
[8]
|
M. Penicka, “Formal Approach to Railway Applications,” Formal Methods and Hy-brid Real Time Systems, Lecture Notes in Computer Science, Springer, Vol. 4700, 2007, pp. 504-520. doi:10.1007/978-3-540-75221-9_24
|
[9]
|
M. Carey and I. Crawford, “Scheduling Trains on a Network of Busy Complex Stations,” Transportation Research, Part B: Methodological, Vol. 41, No. 2, 2007, pp. 159-178.
|
[10]
|
J. Tornquist, “Com-puter-Based Decision Support for Railway Traffic Scheduling and Dispatching, A Review of Models,” Proceedings of the 5th Workshop on Algorithmic Methods and Models for Optimiza-tion of Railways, Palma de Mallorca, 14 September 2005.
|
[11]
|
L. Anderegg, I. Stephan, E. Gantenbein and I Stat-ure, “Train Routing Algorithms: Concepts, Design Choices, and Practical Considerations,” Proceedings of the 5th Work-shop on Algorithm Engineering and Experiments, Baltimore, 11 January 2003, pp. 106-118.
|
[12]
|
M. Lubbecke and U. Zimmermann, “Engine Routing and Scheduling at Industrial In-Plant Railroads,” Transportation Science, Vol. 37, No. 2, 2003, pp. 183-197.
|
[13]
|
A. E. Kozan and A. Higgins, “Mod-eling Train Delays in Urban Networks,” Transportation Sci-ence, Vol. 32, No.4, 1998, pp. 346-357.
|
[14]
|
Q. Lu, M. Des-souky and R. Leachman, “Modeling Train Movements through Complex Rail Networks,” ACM Transactions on Modeling and Computer Simulations (TOMACS), Vol. 14, No. 1, 2004, pp. 48-75.
|
[15]
|
D. Parkes and L. Ungar, “An Auction Based Method For Decentralized Train Scheduling,” Proceedings of the 5th International Conference on Autonomous Agents, Montreal, 28 May-1 June 2001, pp. 43-50.
|
[16]
|
J. Lee, K. Sheng and J. Guo, “Fast and Reliable Algorithm for Railway Train Routing,” Proceedings of the IEEE Region 10 Confer-ence on Computers, Communications, Control Engineering, Beijing, 19-21 October 1993, pp. 652-655.
|
[17]
|
D. Ariano, M. Pranzo and I. Hansen, “Conflict Resolution and Train Speed Coordination for Solving Time Table Perturbations,” IEEE Transactions on Intelligent Transportation Systems, Vol. 8, No. 4, 2007, pp. 208-222.
|
[18]
|
T. Ho, J. Norton and C. Goodman, “Optimal Traffic Control at Railway Junctions,” IEE Proceed-ings of Electric Power Applications, Vol. 144, No. 2, 1997, pp. 140-148.
|
[19]
|
M. Lewellen and K. Tumay, “Network Simula-tion of a Major Railroad,” Proceedings of the 30th Winter Simulations Conference, Washington DC, 13-16 December 1998, pp. 1133-1138.
|
[20]
|
S. Graff and P. Shenkin, “A Com-puter Simulation of a Multiple Track Rail Network,” Sixth In-ternational Conference on Mathematical Modeling, St. Louis, 4-7 August 1987, pp. 472-475.
|
[21]
|
T. Ho and T. Yeung, “Railway Junction Traffic Control by Heuristic Methods,” IEE Proceedings of Electric Power Applications, Vol. 148, No. 1, 2001, pp. 771-772.
|
[22]
|
M. Hartong, “Secure Communications Based Train Control Operations,” Doctoral Dissertation, George Mason University, Fairfax, May 2009.
|
[23]
|
D. Barney, D. Haley and G. Nkandros, “Calculating Train Braking Dis-tances,” Proceedings of the 6th Australian Workshop on Safety Critical Systems and Software, Brisbane, 6 July 2001, pp. 23-29.
|
[24]
|
“IEEE Std. 1474.1-2004,” IEEE Standard for Communications-Based Train Control, Appendix D, IEEE, Piscataway, 2004.
|
[25]
|
T. M. Malvezzi, P. Presciani, B. Al-lotta and P. Toni, “Probabilistic Analysis of Braking Perform-ance In Railways,” Proceedings of the Institution of Mechani-cal Engineers, Part F: Journal of Rail and Rapid Transit, Vol. 217, No. 3, 2003, pp. 149-165.
|
[26]
|
B. Vincze and G. Tarmai, “Development and Analysis of Train Brake Curve Calculation Methods with Complex Simulation,” Proceedings of Interna-tional Exhibition of Electrical Equipment for Power Engineer-ing, Electrical Engineering, Electronics, Energy and Re-source-Saving Technologies, Household Electric Appliances, Zilina, 23- 24 May 2006, pp. 199-211.
|
[27]
|
B. Friman, “An Algorithm for Braking Curve Calculations in ERTMS Train Protection Systems,” COMPRAIL 2006 10th International Conference on Computer System Design and Operation in the Railway and Other Transit Systems, Prague, 10-12 July 2006, pp. 421-430.
|
[28]
|
“BS 05/19984709 DC (UIC-546) EN 15179. Railway Applications Braking. Requirements for the Brake System of Passenger Coaches,” British Standards Institution, London, March 2005.
|
[29]
|
“Draft Guide for the Calculation of Braking Distances for Rail Transit Vehicles, IEEE P1698/D1.3,” IEEE, Piscataway, 2008.
|
[30]
|
F. Yan and T. Tang, “Formal Modeling and Verification of Real-time Con-current Systems,” Proceedings of the IEEE International Con-ference on Vehicular Electronics and Safety, ICVES 2007, Bei-jing, 13-15 December 2007, pp. 1-6.
|
[31]
|
E. Khmelnitsky, “On an Optimal Control Problem of Train Operation,” IEEE Trans-actions on Automatic Control, Vol. 45, No. 7, 2000.
|
[32]
|
L. Y. Zhang, P. Li, L. M. Jia and F. Y. Yang, “Study on the Simula-tion for Train Operation Adjustment under Moving Block,” Proceedings of the 2005 Intelligent Transportation Systems,” Vienna, 13-16 September 2005, pp. 351-356. doi:10.1109/ITSC.2005.1520153
|
[33]
|
H. Takeuchi, C. Good-man and S. Sone, “Moving Block Signaling Dynamics: Per-formance Measures and Re-starting Queued Electric Trains,” IEE Proceedings Electric Power Applications, Vol. 150, No. 4, 2003, pp. 483-492.
|
[34]
|
H. Krueger, E. Vaillancourt, A. Drummie, S. Vucko and J. Bekavac, “Simulation in the Rail-road Environment,” Proceedings of the 2000 Winter Simulation Conference, Orlando, 10-13 December 2000, pp. 1048-1055.
|
[35]
|
W. Rudderham, “Longitudinal Control Sys-tem of the Intermediate Capacity Transit System,” Proceedings of the 33rd IEEE Vehicular Technology Conference, Toronto, 25-27 May 1983, pp. 183-190.
doi:10.1109/VTC.1983.1623131
|
[36]
|
“Railroad Communica-tions and Train Control, Report to Congress,” Federal Railroad Administration, Washington DC, July 1994
|
[37]
|
“Report of the Railroad Safety Advisory Committee to the Federal Rail-road Administrator, Implementation of Positive Train Control Systems,” Federal Railroad Administration, Washington DC, August 1999.
|