[1]
|
J. D. McCalley, V. Vittal and N. Abi-Samra, “An Overview of Risk Based Security Assessment,” in Power Engineering Society Summer Meeting, 1999. IEEE, Vol. 1, 1999, pp. 173-178.
|
[2]
|
H. Wan, J. D. McCalley and V. Vittal, “Risk Based Voltage Security Assessment,” Ieee Transactions on Power Systems, Vol. 15, 2000, pp. 1247-1254.
doi:10.1109/59.898097
|
[3]
|
Y. J. Dai, J. D. McCalley, N. Abi-Samra and V. Vittal, “Annual Risk Assessment for Over-load Security,” Ieee Transactions on Power Systems, Vol. 16, 2001, pp. 616-623. doi:10.1109/59.962405
|
[4]
|
W. H. Fu, J. D. McCalley and V. Vittal, “Risk Assessment for Transformer Loading,” Ieee Transactions on Power Systems, Vol. 16, 2001, pp. 346-353.
doi:10.1109/59.932267
|
[5]
|
M. Ni, J. D. McCalley, V. Vittal and T. Tayyib, “Online Risk-based Security Assessment,” Ieee Transactions on Power Systems, Vol. 18, 2003, pp. 258-265.
doi:10.1109/TPWRS.2002.807091
|
[6]
|
Z. Pei, S. T. Lee and D. Sobajic, “Moving Toward Probabilistic Reliability Assessment Methods,” in Probabilistic Methods Applied to Power Systems, 2004 International Conference on, 2004, pp. 906-913.
|
[7]
|
Z. Pei, M. Liang, L. Hopkins and B. Fardanesh, “Utility Experience Performing Probabilistic Risk Assessment for Operational Planning,” in Intelligent Systems Applications to Power Systems, 2007. ISAP 2007. International Conference on, 2007, pp. 1-6.
|
[8]
|
Z. Pei, M. Graham and D. Ramsay, “Prioritization of Transmission Projects using EPRI Probabilistic Risk Assessment Program,” in Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific, 2009, pp. 1-5.
|
[9]
|
Z. Pei, L. Shanshan, X. Ruilin, L. Xinyu and F. Li, “Assessing System Risk and Integrating Operation and Planning Functions for Chongqing Power using EPRI Probabilistic Risk Assessment Program,” in Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific, 2010, pp. 1-6.
|