A Transformer Replacement Decision Method Based on Probability Assessment of Failure Rate ()
1. Introduction
The safe operation of power transformer is one of the important defenses to the reliability operation of power system. In order to ensure the transformer always works under a healthy operation status, it is critical to assess the failure rate (FR) of transformer and replace the old on eat a most suitable time [1]. As one of the most important equipment in power system, the transformer with a large number accounts for a significant proportion of the total cost of power companies. As a result, determining a reasonable replacement time for the transformer can effectively reduce the cost of power companies.
At present, there usually exists two extremes in the replacement of transformer. On the one side, the old transformer in service always working exceeds its service life limitation, which may lead to a high maintenance cost. On the other side, frequently replace transformer in pursuit of the high performance of new transformers will definitely results in unnecessary waste. The old transformer still occupies a large proportion in power system at the present time, and the replacement work is very urgent. Therefore, considering the relationship between the healthy status and service life of transformer, it is critical to determine a transformer replacement decision method for providing the scientific basis for the power enterprises to carry out technology reconstruction of power transformer.
A lot of studies have already been carried out in this area. In refs [2] [3], the method of transformer service life assessment based on large data analysis was proposed. In [4], a transformer life assessment method based on fuzzy theory and markov chain method was developed considering the transformer performance decline process. A transformer insulation life determination method based on insulation equivalent aging model was proposed in [5]. A method for transformer life assessment based on neural network was proposed in [6] [7]. A transformer state estimation method based on risk analysis method was developed in [8] [9], in order to predict the service life of a transformer. In above researches, the service life of the transformer is assessed from different aspects. However, various kinds of uncertainties exist in the operation process of the transformer, which will seriously impact the security operation of the transformer. As a result, there is always a contradiction between economic and reliability, when decide whether to replace a transformer or not. Therefore, consider the influences from many uncertainties, it is of great practical value to develop adecision method for transformer replacement, in order to guide the transformer technical transformation process.
For this reason, a transformer replacement decision method based on probability assessment of FR is proposed. A first order model of transformer paper degradation is used to depict the mathematical relationship between service life and FR, and the Weibull Distribution is used to generate the variations of Degree of Polymerization (DP) by Monte Carlo Simulation (MCS) along with time. The transformer FR is then determined. When the FR is higher than a pre-de- fined threshold value, the transformer should be replaced for high reliability purpose.
2. Transformer Aging Mechanism Modeling
Transformer is composed of iron core, high and low voltage windings, major insulation, dielectric oil, oil tank, and drive pipe, etc. According to the refs [10] [11], the insulation paper is the weakest part related to the transformer reliability. The aging process of insulation paper can reflect the aging process of transformer, which can be used to guide the life assessment of transformer. The main component of insulating paper is the cellulose, which is made up of many units. The average number of cellulose units contained in a chain is called the Degree of Polymerization (DP) of the insulation paper. The aging process of insulating paper is closely related to the shortening process of the molecular chain, that is, the DP value decreasing process [12]. A first order model of transformer paper degradation depicted in (1)-(3) was introduced to describe the aging process of insulation paper.
(1)
(2)
(3)
where DP(t) is the DP value at time t; DP(t0) is initial value of DP; Ea is the initial aging activation energy of insulating paper; A is the gas constant; T(t) is the absolute temperature varying with time, which is set to be 370 K in this paper.
When Ea = 110.942 kJ/mol, Rg = 8.314, DP(t0) = 1000, A = 2 × 108, and T = 370 K, the ideal DP curve changes with time is shown in Figure 1.
As depicted in Figure 1, it can be seen that with the increasing of the operation time, the insulation performance of the transformer is decreased, which may lead to equipment failure and cause power interruption. Actually, the insulation strength of the internal insulation of the transformer should be greater than the joint stress. When the insulation strength of the insulation paper is
lower than the joint stress (DPF), the breakdown of the insulation paper will lead to the failure. At the same time, in the actual operation process, the life of the transformer will face a variety of uncertainties (also called unexpected stress), such as electrical stress, mechanical stress, thermal stress and chemical stress, which will significantly impact the insulation strength, just as shown in Figure 2.
It can be seen that under the normal condition, the insulation strength decreases with time. When the insulation strength is equal to the normal stress, the service life of the transformer is terminated. When suffered from some unexpected stresses, the insulation strength of the transformer is significantly reduced, which may lead to the reduction of the service life. Therefore, it is necessary to simulate the random effects of the unexpected stress on the insulation strength for replacement of old transformers.
3. Replacement Decision Method Based on Probability Assessment of Failure Rate
3.1. Simulation of Transformer State Using Weibull Distribution
The Weibull distribution is widely used to reflect the equipment failure rate changes with service age [13] [14]. By changing the shape parameter and scale parameter, it can be used to depicted the equipment failure rate tendency at different operation periods. For this reason, the Weibull distribution depicted in (4) is used to randomly generate the deviation value of DP (ΔD) when the unexpected stress happens.
(4)
where
is the scale parameter;
is the shape parameter. When
, it means the transformer is at the aging stage [15]. We assume that the operation data of transformer DP, can be obtained by on-line monitoring sensors. Thus, the difference between the DP value at a specific time and the DP expected value, which is depicted using ΔD, is used as the statistical data for assessment. In the real application, the statistical data of ΔD is fitted by the
![]()
Figure 2. The comparison results of insulation strength between the normal and unexpected stress conditions.
Weibull distributionin (4). Then the fitted Weibull distribution function is used by MCS to generate ΔD a teach specific time.
3.2. Replacement Decision Method
The steps of the proposed replacement decision method based on probability assessment of failure rate are given as follows:
Step 1: Set the Monte Carlo simulation times as N. The iteration time icount = 1. The initial prediction time is t0. The aim is to predict the future service life of the transformer within n days. The simulation changing step is set to be 1 day. The transformer fault statistical vector is given in (5)
(5)
where n is the forecast time period; inumti = 0, when ti = t0, (t0 ≤ ti ≤ n).
Step 2: The transformer statistical data of ΔD is fitted by the Weibull distribution with the corresponding scale and shape parameters using (4) at time ti.
Step 3: The fitted Weibull distribution at time ti is used to generate ΔDti (the ΔD for iteration time icount at time ti).
Step 4: Using the value Dti in Figure 1 at time ti, the DP value at time ti in the icount interation (DPti = Dti − ΔDti) is determined. If DPti ≤ DPF, The expected service life (tf) of the transformer is obtained (tf = ti), and the corresponding failure times at ti, inumti = inumti + 1. Then, renew the iteration time icount = icount + 1. Go to step 5. Otherwise, ti = ti + Δt, and go to step 2.
Step 5: if icount ≤ N, go to step 2. Otherwise, go to step 6.
Step 6: According to inum, the fault ratecurve of the transformer changing with time is determined. For a specific time ti, the fault ratepf_ti = inumti/N, which is used to determine the service life of the transformer.
Step 7: Set the failure probability threshold (pfc) for determining the service life of transformer. If pf_ti ≥ pfc, the transformer is considered to be replaced and reaches the termination of its service life.
3.3. Case Studies
In order to verify the validity of the method proposed in this paper, a distribution transformer in a power supply company was used as a test case, and the simulation parameters are shown in Table 1.
The comparison results of DP variation between the normal and unexpected stress conditions are given in Figure 3. Compared with Figure 1, for a specific simulation, the DP decreases significantly with time under unexpected stress condition. The service life of transformer drops to 1979 days from 2945 days, when DPF = 250 days.
According to the method proposed in this paper, the failure rate in the last 25 days before the end of service life was analyzed. As seen in Figure 4, in the last
![]()
Figure 3. The comparison results of DP variation between the normal and unexpected stress conditions.
![]()
Figure 4. Failure rate before service life termination of a transformer.
25 days, the failure rate of the transformer is continuously increasing. At the end of day 1979, the failure rate is gradually approaching to 100%. It can be considered that the service life of the transformer is terminated, and the transformer should be replaced.
4. Conclusion
The service life of a transformer is significantly influenced by unexpected stresses. As a result, it is of great practical value to put forward a decision method for transformer replacement, in order to guide the transformer technical transformation process. For this reason, a transformer replacement decision method based on probability assessment of FR is proposed. A first order model of transformer paper degradation is firstly proposed. The Weibull Distribution is used by MCS to generate the variations of DP along time based on historical data, and the transformer FR is determined. When the FR is higher than a pre-de- fined threshold value, the transformer should be replaced for reliability purpose. Case studies show that the method can effectively identify the influences of various uncertainties on the service life of transformer, and improve the technical level and economic benefit of power company, which has a good engineering application prospect.
Acknowledgements
This work was supported by the project: Research on key techniques to the design of smart substation in Tianjin (KJ15-1-08).