[1]
|
D. Park, M. Al-Sharkawi, R. Marks, A. Atlas and M. Damborg, “Electric Load Forecasting Using an Artificial Neural Network,” IEEE Transactions on Power Systems, Vol. 6, No. 2, 1991, pp. 442-449. doi:10.1109/59.76685
|
[2]
|
A. D. Papalxopoulos and T. C. Hiterbeg, “A Regression- Based Approach to Short-Term Load Forecasting,” IEEE Transactions on Power Systems, Vol. 5, No. 4, 1990, pp. 1535-1547. doi:10.1109/59.99410
|
[3]
|
G. Gross and F. D. Galianan, “Short-Term Load Forecasting,” Proceedings of the IEEE, Vol. 75, No. 12, 1987, pp. 1558-1572. doi:10.1109/PROC.1987.13927
|
[4]
|
S. Sachdeva and C. M. Verma, “Load Forecasting Using Fuzzy Methods,” Proceeding of Joint International Conference on Power System Technology and IEEE Power India Conference, New Delhi, 12-15 October 2008, pp. 1-4.
|
[5]
|
G. T. Heinemann, D. A. Nordman and E. C. Plant, “The Relationship between Summer Weather and Summer Loads,” IEEE Transactions on Power Apparatus and Systems, Vol. PAS-85, No. 11, 1966, pp. 1144-1154.
doi:10.1109/TPAS.1966.291535
|
[6]
|
H. Morais, P. K. P. Faria, Z. A. Vale and H. M. Khodr, “Optimal Scheduling of a Renewable Micro-Grid in an Isolated Load Area Using Mixed-Integer Linear Programming,” Renewable Energy, Vol. 35, No. 1, 2010, pp. 151-156. doi:10.1016/j.renene.2009.02.031
|