[1]
|
R. Hughers and M. Jansen, “Engineering Process Using IEC 61850,” Power Engineering Conference (AUPEC 2009), Australasian Universities, 27-30 September 2009, pp. 1-6.
|
[2]
|
SIEMENS, “SIEMENS Relay Operation Program—DIG- SI4 Manual,” 5 November 2007.
|
[3]
|
International Elctroctechnical Commission, “IEC 61850-6, Communication Networks and Systems in Substation —Part 6: Configuration Description Language for Communication in Electrical Substations Related to IEDs,” April 2004.
|
[4]
|
A. Apostolov and B. Vandiver, “Functional Testing of IEC 61850 Based Protection Relays,” 60th Annual Conference for Protective Relay Engineers, College Station, 27-29 March 2007, pp. 333-340.
|
[5]
|
L. Hossenlopp, “Engineering Perspectives on IEC 61850,” IEEE Power & Magazine, Vol. 5, No. 3, 2007, pp. 45-50.
|
[6]
|
M. Jansen and A. Apostolov, “IEC 61850 Impact on Substation Design,” Transmission and Distribution Conference and Exposition, Chicago, 21-24 April 2008, pp.1-7. doi:org/10.1109/TDC.2008.4517219
|