Knowledge Integration in ISD Project Teams: A Transactive Memory Perspective

Abstract

Many organizations frequently establish information system development (ISD) project teams in order to solve specific problems. Knowledge tends to be stored within individuals who are often dispersed over time. However, knowledge integration is required to solve new types of problems. The transactive memory system (TMS) has been suggested as a critical mechanism for facilitating knowledge integration as part of the team’s processes. TMS can help the knowledge team to recognize the presence of individuals with diverse knowledge and optimize their value. In this paper, we use TMS and the concept of “collective mind” to explain how the team members’ heedful inter-relations and mindful comprehension function within the social system. We also discuss in detail how antecedent factors affect TMS. Drawing on data from a study of 339 part-time MBA students who were members of knowledge teams, the findings of this research showed that all our hypotheses were statically significant. Discussions and implications for academics and practitioners are provided.

Share and Cite:

Lin, T. , Cheng, K. and Wu, S. (2014) Knowledge Integration in ISD Project Teams: A Transactive Memory Perspective. Open Journal of Business and Management, 2, 260-371. doi: 10.4236/ojbm.2014.24042.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Amabile, T.M., Conti, R., Coon, H., Lazenby, J. and Herron, M. (1996) Assessing the Work Environment for Creativity. Academy of Management Journal, 39, 1154-1184. http://dx.doi.org/10.2307/256995
[2] Luecke, R. and Katz, R. (2003) Managing Creativity and Innovation. Harvard Business School Press, Boston.
[3] Van den Bosch, F.A.J. and Van Wijk, R. (2001) Creation of Managerial Capabilities through Managerial Knowledge Integration: A Competence-Based Perspectives. In: Sanchez, R., Ed., Knowledge Management and Organizational Competence, Oxford University Press, Oxford, 159-176.
[4] Lewis, K. (2004) Knowledge and Performance in Knowledge-Worker Teams: A Longitudinal Study of Transactive Memory Systems. Management Science, 50, 1519-1533.
http://dx.doi.org/10.1287/mnsc.1040.0257
[5] Lewis, K. (2003) Measuring Transactive Memory Systems in the Field: Scale Development and Validation. Journal of Applied Psychology, 88, 587-603.
http://dx.doi.org/10.1037/0021-9010.88.4.587
[6] Weick, K.E. and Roberts, K.H. (1993) Collective Mind in Organizations: Heedful Interrelating on Flight Decks. Administrative Science Quarterly, 38, 357-381. http://dx.doi.org/10.2307/2393372
[7] Newell, S., Tansley, C. and Huang, J. (2004) Social Capital and Knowledge Integration in an ERP Project Team: The Importance of Bridging and Bonding. British Journal of Management, 15, 43-57.
http://dx.doi.org/10.1111/j.1467-8551.2004.00405.x
[8] Newell, S., Swan, J. and Galliers, R.D. (2000) A Knowledge-Focused Perspective on the Diffusion and Adoption of Complex Information Technologies: The BPR Example. Information Systems Journal, 10, 239-259. http://dx.doi.org/10.1046/j.1365-2575.2000.00079.x
[9] Nidumolu, S.R. (1996) A Comparison of the Structural Contingency and Risk-Based Perspectives on Coordination in Software-Development Projects. Journal of Management Information Systems, 13, 77-113.
[10] Yoo, Y., Lyytinen, K. and Heo, D. (2007) Closing the Gap: Towards a Process Model of Post-Merger Knowledge Sharing. Information Systems Journal, 17, 321-347.
http://dx.doi.org/10.1111/j.1365-2575.2007.00248.x
[11] Hollingshead, A.B. (1998) Retrieval Processes in Transactive Memory Systems. Journal of Personality and Social Psychology, 74, 659-671. http://dx.doi.org/10.1037/0022-3514.74.3.659
[12] Griffith, T.L., Sawyer, J.E. and Neale, M.A. (2003) Virtualness and Knowledge in Teams: Managing the Love Triangle of Organizations, Individuals, and Information Technology. MIS Quarterly, 27, 265-287.
[13] Highsmith, J. and Cockburn, A. (2001) Agile Software Development: The People Factor. IEEE Computer, 34, 131-133.
[14] Staples, D.S. and Webster, J. (2008) Exploring the Effects of Trust, Task Interdependence and Virtualness on Knowledge Sharing in Teams. Information Systems Journal, 18, 617-640.
http://dx.doi.org/10.1111/j.1365-2575.2007.00244.x
[15] Simon, H.A. (1979) Information Processing Models of Cognition. Annual Review of Psychology, 30, 363-396. http://dx.doi.org/10.1146/annurev.ps.30.020179.002051
[16] Kogut, B. and Zander, U. (1992) Knowledge of the Firm, Combinative Capabilities, and the Replication of Technology. Organization Science, 3, 383-397. http://dx.doi.org/10.1287/orsc.3.3.383
[17] Grant, R.M. (1996) Toward a Knowledge-Based Theory of the Firm. Strategic Management Journal, 17, 109-122. http://dx.doi.org/10.1002/smj.4250171110
[18] De Boer, M., Van Den Bosch, F.A.J. and Volberda, H.W. (1999) Managing Organizational Knowledge Integration in the Emerging Multimedia Complex. Journal of Management Studies, 36, 379-398.
http://dx.doi.org/10.1111/1467-6486.00141
[19] Inkpen, A.C. (1998) Learning, Knowledge Acquisition, Strategic Alliances. European Management Journal, 16, 223-229. http://dx.doi.org/10.1016/S0263-2373(97)00090-X
[20] Balasubramanian, P., Nochur, K., Henderson, J.C. and Kwan, M.M. (1999) Managing Process Knowledge for Decision Support. Decision Support Systems, 27, 145-162.
http://dx.doi.org/10.1016/S0167-9236(99)00041-X
[21] Zack, M.H. (1999) Managing Codified Knowledge. Sloan Management Review, 40, 45-58.
[22] Alavi, M. and Tiwana, A. (2002) Knowledge Integration in Virtual Teams: The Potential Role of KMS. Journal of the American Society for Information Science & Technology, 53, 1029-1037.
http://dx.doi.org/10.1002/asi.10107
[23] Davenport, T.H. and Glaser, J. (2002) Just-in-Time Delivery Comes to Knowledge Management. Harvard Business Review, 80, 107-111.
[24] Huang, J.C. and Newell, S. (2003) Knowledge Integration Processes and Dynamics within the Context of Cross-Functional Projects. International Journal of Project Management, 21, 167-176.
http://dx.doi.org/10.1016/S0263-7863(02)00091-1
[25] Neumann, E. and Thomas, J. (2002) Knowledge Assembly for the Life Sciences. Drug Discovery Today, 7, S160-S162. http://dx.doi.org/10.1016/S1359-6446(02)02432-7
[26] Robbins, S. and Coulter, M. (2005) Management. Pearson Prentice, Upper Saddle River.
[27] Shin, M., Holden, T. and Schmidt, R.A. (2001) From Knowledge Theory to Management Practice: Towards and Integrated Approach. Information Processing and Management, 37, 335-355.
http://dx.doi.org/10.1016/S0306-4573(00)00031-5
[28] Cannon-Bowers, J.A., Salas, E. and Converse, S.A. (1993) Shared Mental Models in Expert Team Decision-Making. In: Castellan Jr., N.J., Ed., Individual and Group Decision Making, Lawrence Erlbaum, Hillsdale, 221-246.
[29] Wegner, D.M. (1995) A Computer Network Model of Human Transactive Memory. Social Cognition, 13, 319-339. http://dx.doi.org/10.1521/soco.1995.13.3.319
[30] Moreland, R.L. (1999) Transactive Memory: Learning Who Knows What in Word Groups and Organizations. In: Thompson, L.L., Levine, J.M. and Messick, D.M., Eds., Shared Cognition in Organizations: The Management of Knowledge, Lawrence Erlbaum Associates, Mahwah, 3-31.
[31] Hollingshead, A.B. (2000) Perceptions of Expertise and Transactive Memory in Work Relationships. Group Processes & Intergroup Relations, 3, 257-267. http://dx.doi.org/10.1177/1368430200033002
[32] Kanawattanachai, P. and Yoo, Y. (2007) The Impact of Knowledge Coordination on Virtual Team Performance over Time. MIS Quarterly, 31, 783-808.
[33] Wegner, D.M., Erber, R. and Raymond, P. (1991) Transactive Memory in Close Relationships. Journal of Personality and Social Psychology, 61, 923-929. http://dx.doi.org/10.1037/0022-3514.61.6.923
[34] Akgün, A.E., Byrne, J., Keskin, H., Lynn, G.S. and Imamoglu, S.Z. (2005) Knowledge Networks in New Product Development Projects: A Transactive Memory Perspective. Information & Management, 42, 1105-1120. http://dx.doi.org/10.1016/j.im.2005.01.001
[35] Hsu, J.S.C., Shih, S.P., Chiang, J.C. and Liu, J.Y.C. (2012) The Impact of Transactive Memory Systems on IS Development Teams’ Coordination, Communication, and Performance. International Journal of Project Management, 30, 329-340. http://dx.doi.org/10.1016/j.ijproman.2011.08.003
[36] Akgün, A.E., Byrne, J.C., Keskin, H. and Lynn, G.S. (2006) Transactive Memory System in New Product Development Teams. IEEE Transactions on Engineering Management, 53, 95-111.
http://dx.doi.org/10.1109/TEM.2005.857570
[37] Lin, T.C., Hsu, J.S.C., Cheng, K.T. and Wu, S. (2012) Understanding the Role of Behavioural Integration in ISD Teams: An Extension of Transactive Memory Systems Concept. Information Systems Journal, 22, 211-234. http://dx.doi.org/10.1111/j.1365-2575.2011.00383.x
[38] Austin, J.R. (2000) Knowing What and Whom Other People Know: Linking Transactive Memory with External Connections in Organizational Groups. Academy of Management Proceedings, 2000, F1-F6.
[39] Rau, D. (2006) Top Management Team Transactive Memory, Information Gathering, and Perceptual Accuracy. Journal of Business Research, 59, 416-424.
http://dx.doi.org/10.1016/j.jbusres.2005.07.001
[40] Yoo, Y. and Kanawattanachai, P. (2001) Developments of Transactive Memory Systems and Collective Mind in Virtual Teams. International Journal of Organizational Analysis, 9, 187-208.
http://dx.doi.org/10.1108/eb028933
[41] Borgatti, S.P. and Cross, R. (2003) A Relational View of Information Seeking and Learning in Social Networks. Management Science, 49, 432-445. http://dx.doi.org/10.1287/mnsc.49.4.432.14428
[42] Faraj, S. and Sproull, L. (2000) Coordinating Expertise in Software Development Teams. Management Science, 46, 1554-1568. http://dx.doi.org/10.1287/mnsc.46.12.1554.12072
[43] Tsoukas, H. (1996) The Firm as a Distributed Knowledge System: A Constructionist Approach. Strategic Management Journal, 17, 11-25. http://dx.doi.org/10.1002/smj.4250171104
[44] Hutchins, E. (1996) Cognition in the Wild. MIT Press, Cambridge.
[45] Yi, M.U. and Davis, F.D. (2003) Developing and Validating an Observational Learning Model of Computer Software Training and Skill Acquisition. Information Systems Research, 14, 146-169.
http://dx.doi.org/10.1287/isre.14.2.146.16016
[46] Nelson, R.R. and Cheney, P.H. (1987) Training End Users: An Exploratory Study. MIS Quarterly, 11, 547-559. http://dx.doi.org/10.2307/248985
[47] Kane, A.A., Argote, L. and Levine, J.M. (2005) Knowledge Transfer between Groups via Personal Rotation: Effects of Social Identity and Knowledge Quality. Organizational Behavior and Human Decision Processes, 96, 56-71. http://dx.doi.org/10.1016/j.obhdp.2004.09.002
[48] Brandon, D.P. and Hollingshead, A.B. (2004) Transactive Memory Systems in Organizations: Matching Tasks, Expertise, and People. Organization Science, 15, 633-644.
http://dx.doi.org/10.1287/orsc.1040.0069
[49] Wegner, D.M. (1986) Transactive Memory: A Contemporary Analysis of the Group Mind. In: Mullen, B. and Goethals, G.R., Eds., Theories of Group Behavior, Springer-Verlag, New York, 185-205.
[50] Wegner, D.M., Giuliano, T. and Hertel, P.T. (1985) Cognitive Interdependence in Close Relationships. In: Ickes, W., Ed., Compatible and Incompatible Relationships, Springer Verlag, New York, 253-276.
[51] Argote, L. (1999) Organizational Learning: Creating, Retaining, and Transferring Knowledge. Springer, Berlin.
[52] Sharma, R. and Yetton, P. (2007) The Contingent Effects of Training, Technical Complexity, and Task Interdependence on Successful Information Systems Implementation. MIS Quarterly, 31, 219-238.
[53] Jarvenpaa, S.L. and Staples, D.S. (2001) Exploring Perceptions of Organizational Ownership of Information and Expertise. Journal of Management Information Systems, 18, 151-183.
[54] Chiu, C.M., Hsu, M.H. and Wang, E.T.G. (2006) Understanding Knowledge Sharing in Virtual Communities: An Integration of Social Capital and Social Cognitive Theories. Decision Support Systems, 42, 1872-1888. http://dx.doi.org/10.1016/j.dss.2006.04.001
[55] Subramani, M.R. and Venkatraman, N. (2003) Safeguarding Investments in Asymmetric Interorganizational Relationships: Theory and Evidence. Academy of Management Journal, 46, 46-62.
http://dx.doi.org/10.2307/30040675
[56] Zaheer, A. and Venkatraman, N. (1995) Relational Governance as an Interorganizational Strategy: An Empirical Test of the Role of Trust in Economic Exchange. Strategic Management Journal, 16, 373-392. http://dx.doi.org/10.1002/smj.4250160504
[57] Tiwana, A. and McLean, E.R. (2005) Expertise Integration and Creativity in Information Systems Development. Journal of Management Information Systems, 22, 13-43.
[58] Nunnally, J.C. (1978) Psychometric Theory. McGraw-Hill, New York.
[59] Fornell, C. and Larcker, D.F. (1981) Evaluating Structural Equation Models with Unobservable Variables and Measurement Error. Journal of Marketing Research, 18, 39-50.
http://dx.doi.org/10.2307/3151312
[60] Jarvis, C.B., MacKenzie, S.B. and Podsakoff, P.M. (2003) A Critical Review of Construct Indicators and Measurement Model Misspecification in Marketing and Consumer Research. Journal of Consumer Research, 30, 199-218. http://dx.doi.org/10.1086/376806
[61] Chin, W.W. (1998) Commentary: Issues and Opinion on Structural Equation Modeling. MIS Quarterly, 22, 7-16.
[62] Phang, C.W., Sutanto, J., Kankanhalli, A., Li, Y., Tan, B.C.Y. and Teo, H.H. (2006) Senior Citizens’ Acceptance of Information Systems: A Study in the Context of e-Government Services. IEEE Transactions on Engineering Management, 53, 555-569. http://dx.doi.org/10.1109/TEM.2006.883710
[63] Falk, R.F. and Miller, N.B. (1992) A Primer for Soft Modeling. University of Akron Press, Akron.
[64] Baron, R.M. and Kenny, D.A. (1986) The Moderator-Mediator Variable Distinction in Social Psychological Research: Conceptual, Strategic, and Statistical Considerations. Journal of Personality and Social Psychology, 51, 1173-1182. http://dx.doi.org/10.1037/0022-3514.51.6.1173

Copyright © 2023 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.