[1]
|
Timmer, M.P., Inklaar, R., O’Mahony, M. and Ark, B. (2011) Economic Growth in Europe. Cambridge University Press, Cambridge, 18-45.
|
[2]
|
Brochner, J. (2010) Effektivitetsmatt for byggsektorn—matfragor (Efficiency Measurements for the Construction Industry-Measurement Issues). Samhallsbyggaren, 3, 42-44.
|
[3]
|
Smyth, H. (2010) Construction Industry Performance Improvement Programmes: The UK Case of Demonstration Projects in the “Continuous Improvement” Programme. Construction Management and Economics, 28, 255-270.
http://dx.doi.org/10.1080/01446190903505948
|
[4]
|
Landin, A. and Oberg, M. (2010) Resultat fran bygginnovationens analysgrupper for flerbostadshus och kontor (Results from Building Innovation’s Analysis Groups for Apartment Buildings and Offices), Samhallsbyggaren, 6.
|
[5]
|
Kululanga, G.K. (2009) Construction Process Improvement through Cognitive Power under Team Generative Learning. Engineering, Construction and Architectural Management, 16, 307-324.
http://dx.doi.org/10.1108/09699980910970815
|
[6]
|
Gambatese, J.A. and Hallowell, M. (2011) Factors That Influence the Development and Diffusion of Technical Innovations in the Construction Industry. Construction Management and Economics, 29, 507-517.
http://dx.doi.org/10.1080/01446193.2011.570355
|
[7]
|
Hekkert, M.P., Suurs, R.A.A., Negro, S.O., Kuhlmann, S. and Smits, R.E.H.M. (2007) Functions of Innovation Systems: A New Approach for Analyzing Technological Change. Technological Forecasting and Social Change, 74, 413-432. http://dx.doi.org/10.1016/j.techfore.2006.03.002
|
[8]
|
Ofori, G. and Lean, C.S. (2001) Factors Influencing Development of Construction Enterprises in Singapore. Construction Management and Economics, 19, 145-154. http://dx.doi.org/10.1080/01446190150505072
|
[9]
|
Olander, S. and Widen, K. (2010) Measuring Change in a Sector—Credit Case SE06. Danish Building Research Institute, Aalborg.
|
[10]
|
Barrett, M. (2009) Policy Challenges for Building Stocks. Building Research and Information, 37, 201-205.
http://dx.doi.org/10.1080/09613210802645841
|
[11]
|
Court, P.F., Pasquire C. and Gibb. A. (2009) A Lean and Agile Construction System as a Set of Countermeasures to Improve Health, Safety and Productivity in Mechanical and Electrical Construction. Lean Construction Journal, 61-76.
|
[12]
|
Court, P.F., Pasquire C., Gibb, A.G.F. and Bowe, D. (2008) Modular Assembly in Health Care Construction—A Mechanical and Electrical Case Study. Proceedings of 16th Annual Conference of the International Group for Lean Construction (IGLC-16), Manchester, 521-531.
|
[13]
|
Dunlop, P. and Smith, S.D. (2004) Planning, Estimation and Productivity in the Lean Concrete Pour. Engineering, Construction and Architectural Management, 11, 55-64. http://dx.doi.org/10.1108/09699980410512665
|
[14]
|
Minchin, R.E., Lewis, D.W. and McLeod, L. (2011) Improving Productivity on a Troubled Bridge Project. Journal of Construction Engineering and Management, 137, 364-371. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000291
|
[15]
|
You, T. and Zi, H. (2007) The Economic Crisis and Efficiency Change: Evidence from the Korean Construction Industry, Applied Economics, 39, 1833-1842. http://dx.doi.org/10.1080/00036840600690199
|
[16]
|
Hammarlund, Y. and Josephson, P.E. (1991) Sources of Quality Failures in Building. Proceedings of European Symposium on Management, Quality and Economics in Housing and Other Building Sectors, Lisbon, 30 Spetember-4 October 1991, 671-679.
|
[17]
|
Mills, A., Love, E.D. and William, P. (2009) Defect Costs in Residential Construction. Journal of Construction Engineering and Management, 135, 12-16. http://dx.doi.org/10.1061/(ASCE)0733-9364(2009)135:1(12)
|
[18]
|
Brown, A. and Adams, J. (2000) Measuring the Effect of Project Management on Construction Outputs: A New Approach. International Journal of Project Management, 18, 327-335. http://dx.doi.org/10.1016/S0263-7863(99)00026-5
|
[19]
|
Delgado, D.J. and Aspinwall, E. (2010) A Framework for Building Quality into Construction Projects. Total Quality Management & Business Excellence, 21, 725-736. http://dx.doi.org/10.1080/14783363.2010.483089
|
[20]
|
Winch, G. (2003) How Innovative Is Construction? Comparing Aggregated Data on Construction Innovation and Other Sectors—A Case of Apples and Pears. Construction Management and Economics, 21, 651-654.
http://dx.doi.org/10.1080/0144619032000113708
|
[21]
|
Gouett, M.C., Haas, C.T., Goodrum, P.M. and Caldas, C.H. (2011) Activity Analysis for Direct-Work Rate Improvement in Construction. Journal of Construction Engineering and Management, 137, 1117-1124.
http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000375
|
[22]
|
Swarup, L., Korkmaz, A. and Riley, D. (2011) Project Delivery Metrics for Sustainable, High-Performance Buildings. Journal of Construction Engineering and Management, 137, 1043-1051.
http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000379
|
[23]
|
Rathore, A., Mohant, R.P., Lyons, A.C. and Barlow, N. (2005) Performance Management through Strategic Total Productivity Optimisation. International Journal of Advanced Manufacturing Technology, 25, 1020-1028.
http://dx.doi.org/10.1007/s00170-003-1936-z
|
[24]
|
Huang, A.L., Chapman, R.E. and Butry, D.T. (2009) Metrics and Tools for Measuring Construction Productivity: Technical and Empirical Considerations. NIST Spec. Publ. 1101. National Institute of Standards and Technology, Gaithersburg.
|
[25]
|
Brochner, J. and Olofsson, T. (2012) Construction Productivity Measures for Innovation Projects: Case Study. Journal of Construction Engineering and Management, 138, 670-677.
http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000481
|
[26]
|
Martino, J.P. (2003) A Review of Selected Recent Advances in Technological Forecasting. Technological Forecasting & Social Change, 70, 719-733. http://dx.doi.org/10.1016/S0040-1625(02)00375-X
|
[27]
|
Armstrong, J.S. (2006) Findings from Evidence-Based Forecasting: Methods for Reducing Forecast Error. International Journal of Forecasting, 22, 583-598. http://dx.doi.org/10.1016/j.ijforecast.2006.04.006
|
[28]
|
Ewing, R. and Bartholomew, K. (2009) Comparing Land Use Forecasting Methods: Expert Panel versus Spatial Interaction Model. Journal of the American Planning Association, 75, 343-357.
http://dx.doi.org/10.1080/01944360902956296
|
[29]
|
Helmer, O. (1968) Analysis of the Future: The Delphi Method, Technological Forecasting for Industry and Government—Methods and applications. Prentice-Hall, Englewood Cliffs.
|
[30]
|
Powell, C. (2003) The Delphi Technique: Myths and Realities. Journal of Advanced Nursing, 41, 376-382.
http://dx.doi.org/10.1046/j.1365-2648.2003.02537.x
|
[31]
|
CEN (2012) Sustainability of Construction Works—Assessment of Buildings Part 4: Framework for the Assessment of Economic Performance. EN 15643-4. European Committee for Standardization, Brussels, 18-19.
|
[32]
|
Larsson, C. and Sjostedt, H. (2010) Efficiency Measures for Buildings—A Model for Efficiency Measuring Applied on Outer Walls of Apartment Buildings (in Swedish). ISRN lutvdg7tvbp-10/5401-SE, Construction Management, Lund University, Lund.
|
[33]
|
Pemsel, S. and Muller, R. (2012) The Governance of Knowledge in Project-Based Organizations. International Journal of Project Management, 30, 865-876. http://dx.doi.org/10.1016/j.ijproman.2012.02.002
|
[34]
|
Kale, S. and Karaman, E.A. (2011) Evaluating the Knowledge Management Practices of Construction Firms by Using Importance—Comparative Performance Analysis Maps. Journal of Construction Engine ering and Management, 137, 1142-1152. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000369
|
[35]
|
Pemsel, S., Widen, K. and Hansson, B. (2010) Managing the Needs of End-Users in the Design and Delivery of Construction Projects. Facilities, 28, 17-30. http://dx.doi.org/10.1108/02632771011011378
|
[36]
|
Kendall, S. and Teicher, J. (2000) Residential Open Building. Spon, London.
|
[37]
|
Habraken, N.J. (1972) Supports, an Alternative to Mass Housing. The Architectural Press, New York.
|
[38]
|
Juvander, K., Franzen, M., Adolfphsson, P.B. and Balgard, S. (2000) Arkitektur och liv i kvarteret Garnisonen [Architecture and Life in the Garrison Quarter]. Raster forlag, Stockholm. (in Swedish)
|
[39]
|
KBS (1990) Neutral Building Product Model—System Description. Swedish Construction Authority Board Report. T: 1231990-11, Stockholm. (in Swedish)
|
[40]
|
Kunz, J. and Fischer, M. (2011) Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions. Center for Integrated Facility Engineering, Working Paper No. 097, Stanford University, 2-3.
|
[41]
|
Bygganalys (2010) Construction Costs for Office Buildings—Compilation for Construction Innovation. Bygganalys, Stockholm.
|
[42]
|
Senaratne, S. and Sexton, M.G. (2009) Role of Knowledge in Managing Construction Project Change. Engineering, Construction and Architectural Management, 16, 186-200. http://dx.doi.org/10.1108/09699980910938055
|
[43]
|
Dubois, A. and Gadde, L.E. (2002) The Construction Industry as a Loosely Coupled System: Implications for Productivity and Innovation. Construction Management and Economics, 20, 621-631.
http://dx.doi.org/10.1080/01446190210163543
|
[44]
|
Hossain, L. (2009) Communication and Coordination in Construction Projects. Construction Management and Economics, 27, 25-39. http://dx.doi.org/10.1080/01446190802558923
|