Post Evaluation of Wind Resource Assessment and Micro-Siting

Abstract

The design energy productions deviate from the actual situation, which are affected by the accuracy of two significant factors - the wind resource assessment and wind farm micro-siting. A running wind farm in northern China was taken as the object in this investigation. The measured data obtained in operation phase and the relevant information in design phase were integrated and a post evaluation of wind resource assessment, micro-siting and generating capacity reduction factors of the wind farm in design phase was provided. The results indicate that the representative year wind regimes of the wind farm in design phase can basically reflect the wind conditions in the wind farm without the consideration of the trends of long-term changes in wind speed; micro-siting project in design phase is superior to that in practical; generating capacity reduction factors, overall on the high side, should be further optimized considering 20-year operation period.

Share and Cite:

Han, S. , Gao, L. , Liu, Y. and Yang, W. (2014) Post Evaluation of Wind Resource Assessment and Micro-Siting. Journal of Power and Energy Engineering, 2, 288-296. doi: 10.4236/jpee.2014.24040.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Wang, R., Ji, H.S., Lou, H.Y., Zhu, R.Z., et al. (2013) Discussion on the Post-Evaluation Method Step of Wind Farm Generation. Electric Power, 46, 54-59.
[2] Peng, H.W. and Wang, X.L. (2009) Discussion on Post Evaluation of Wind Farm Design. Renewable Energy Resources, 27, 97-99.
[3] Yang, Y.H. and Li, X.D. (2008) Study of Theory and Method for Post-Evaluating of Wind Power. Journal of North China Electric Power University (Social Sciences), 3, 6-9.
[4] Lv, T., Zhang, L.S., Li, Z. and Dong, L. (2006) Application of the Analytic Hierarchy Process to Economic Performance Evaluation of Wind Farm Operation. Electric Power, 39, 42-44. http://dx.doi.org/10.1109/TSG.2013.2258048
[5] Yang, W. (2010) Study on Post-Evaluation of Wind farm Design. Ms.D. Thesis, North China Electric Power University, Beijing.
[6] Jiang, G.X. (2009) Study on Post-Evaluation of Wind Resource and Generated Energy in Wind Farm Design. Ms.D. Thesis, North China Electric Power University, Beijing.
[7] General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China (2002) GB/T18710-2002. Methodology of Wind Energy Resource Assessment for Wind Farm. Standards Press of China, Beijing.
[8] General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China (2005) GB/T18709-2002. Methodology of Wind Energy Resource Measurement for Wind Farm. Standards Press of China, Beijing.
[9] National Development and Reform Commission (1997) DL/T 5067-1996. Code on Compiling Feasibility Study Report of Wind Power Projects. Standards Press of China, Beijing.
[10] Wei, G., Wang, F., Zhang, Y.J., et al. (2004) Methods of Processing Shortage and Damage of Historical Data in Load Forecasting. Electric Power Science and Engineering, 1, 16-19.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.