The Metro Project Construction Safety Risk Managing System of GMC ()
Abstract
Based on the international vulgate safety risk managing theory, the Guangzhou
Metro Corporation (GMC) summarizes the standard system of safety risk
management in metro rail transit project, integrating with criterion files about
project on safety risk management promulgated by the Ministry of
Housing and Urban-Rural Development of the People’s Republic of China (MOHURD), according to the project practice. The result of application indicated
that this system, which has been popularized in
several other Chinese cities, effectively guaranteed personnel
and project safety, and promoted the safety risk managing level of project participators
in the same time.
Share and Cite:
Liu, G. , Luo, F. and Zeng, G. (2014) The Metro Project Construction Safety Risk Managing System of GMC.
Open Journal of Safety Science and Technology,
4, 36-41. doi:
10.4236/ojsst.2014.41005.
Conflicts of Interest
The authors declare no conflicts of interest.
References
[1]
|
Liu, G.W. (2007) Innovate Safety Management to Build Safe and Harmonious Enterprise. City High-Speed Rail Transit, 20, 34-40.
|
[2]
|
Chapman, R.J. (2001) The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management. International Journal of Project management, 19, 147-160.
|
[3]
|
FHA (1999) Asset Management Primer. Office of Asset Management, U.S. Department of Transportation, Federal Highway Administration.
|
[4]
|
Liu, G.W. (2011) The Research and Application of GMC Safety Alarm and Emergency Platform. Modern City Rail Transit, 18-21.
|