Study on Validity of Logistics Risk Early Warning Model in Manufacturing Enterprises: Based on the Listed Corporation of Manufacturing Industry in Beijing Area

Abstract

In order to formulate the logistics risk early warning model of listed corporations of manufacturing industry in Beijing area,40 A-stock listed companies of manufacturing enterprise in Beijing area are taken as the study samples, the principal components analysis method is applied to the logistics risk index of Sample Firms in 2009-2011 for extracting principal components to achieve simplified indicators. The validity of the constructed model is tested, the strengths and limitations of the early warning model are analyzed and the ways to improve the validity of the early warning model are proposed.

Share and Cite:

Y. Liu, J. Gao and W. Ma, "Study on Validity of Logistics Risk Early Warning Model in Manufacturing Enterprises: Based on the Listed Corporation of Manufacturing Industry in Beijing Area," Journal of Service Science and Management, Vol. 6 No. 2, 2013, pp. 170-176. doi: 10.4236/jssm.2013.62017.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Y. S. Liu, “Research on Early Warning of Enterprise Logistics Risk Based on Supply Chain Management,” Intellectual Property Press, Beijing, 2010, p. 3.
[2] L. Wang, “Enterprise Logistics Performance Evaluation and Benchmarking Study Based on the Financial Statements,” Master’s Degree Thesis, Chongqing Jiaotong University, Chongqing, 2008.
[3] Q. Cheng, “Study on Logistics Service Operating Risks and Its Early Warning Management,” Journal of Wuhan University of Technology (Social Science Edition), Vol. 23, No. 5, 2010, pp. 636-640.
[4] W. Y. Duan, “Research on the Early-Warming Management of Enterprise Reverse Logistics System,” Master’s Degree Thesis, Daqing Petroleum Institute, Daqing, 2010.
[5] Z. Cheng and P. Zhang, “Study on Logistics Equilibrium Early Warning Control of Steel Corporation Industrial Port,” 2010 IEEE International Conference on Advanced Management Science, Chengdu, 9-11 July 2010, pp. 572-574.
[6] Y. S. Liu, Y. Liu and H. Liu, “ Design of Early Warning Indicator System in Logistics Risk Based on Operation Process of Enterprise,” The 11th National Annual Symposium on Industrial Technology of Economic Management Institutions, Education and Research Press, Hong Kong, 2012, pp. 33-37.
[7] K. R. Liu and Y. Mi, “Shanxi Province Listed Companies' Financial Early Warning Model Based on Principal Components Analysis,” Science Economy Society, Vol. 28, No. 4, 2010, pp. 88-93.
[8] X. H. Liu, “The Necessity and the Software Realization Data Positive Treatment in Factor Analysis,” Journal of Chongqing Institute of Technology (Natural Science), Vol. 23, No. 9, 2009, pp. 152-155.
[9] Y. Z. Yang, Y. G. Wang and H. L. Duan, “The Construction of Risk Early Warning System of Commercial Banks in China,” Economic Science Press, Beijing, 2006, p. 145.
[10] X. Y. Pan, “Research on the Effectiveness of Financial Crisis Early Warning Model Based on EVA,” The Financial Times, No. 8, 2008, pp. 35-36.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.