Intelligent Information Management

Volume 2, Issue 3 (March 2010)

ISSN Print: 2160-5912   ISSN Online: 2160-5920

Google-based Impact Factor: 1.6  Citations  

An Evolutionary Algorithm with Multi-Local Search for the Resource-Constrained Project Scheduling Problem

HTML  Download Download as PDF (Size: 267KB)  PP. 220-226  
DOI: 10.4236/iim.2012.23026    5,202 Downloads   9,117 Views  Citations

Affiliation(s)

.

ABSTRACT

This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality.

Share and Cite:

Z. Chen and C. Chyu, "An Evolutionary Algorithm with Multi-Local Search for the Resource-Constrained Project Scheduling Problem," Intelligent Information Management, Vol. 2 No. 3, 2010, pp. 220-226. doi: 10.4236/iim.2012.23026.

Cited by

[1] Quantum-Inspired Genetic Algorithm for Resource-Constrained Project-Scheduling
2021
[2] A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
2019
[3] Managing Uncertainties and Disruptions in Resource Constrained Project Scheduling
2017
[4] Resource-constrained scheduling with non-constant capacity and non-regular activities1
Space Engineering, 2016
[5] Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities
Space Engineering, 2016
[6] Tabu search approach for Multi-Skill Resource-Constrained Project Scheduling Problem
Computer Science and Information Systems (FedCSIS), 2013 Federated Conference on. IEEE, 2013
[7] Novel heuristic solutions for Multi-Skill Resource-Constrained Project Scheduling Problem
Computer Science and Information Systems (FedCSIS), 2013 Federated Conference on. IEEE, 2013

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.