[1]
|
Early involvement of stakeholders in mobility-related projects
Procedia Computer Science,
2024
DOI:10.1016/j.procs.2024.06.169
|
|
|
[2]
|
Early involvement of stakeholders in mobility-related projects
Procedia Computer Science,
2024
DOI:10.1016/j.procs.2024.06.169
|
|
|
[3]
|
The client's essential stakeholder collaboration activities at the front-end phase of a hospital construction project
International Journal of Managing Projects in Business,
2023
DOI:10.1108/IJMPB-12-2022-0278
|
|
|
[4]
|
The client's essential stakeholder collaboration activities at the front-end phase of a hospital construction project
International Journal of Managing Projects in Business,
2023
DOI:10.1108/IJMPB-12-2022-0278
|
|
|
[5]
|
Using Geomembrane Liners to Reduce Seepage through the Base of Tailings Ponds—A Review and a Framework for Design Guidelines
Geosciences,
2021
DOI:10.3390/geosciences11020093
|
|
|
[6]
|
Using Geomembrane Liners to Reduce Seepage through the Base of Tailings Ponds—A Review and a Framework for Design Guidelines
Geosciences,
2021
DOI:10.3390/geosciences11020093
|
|
|
[7]
|
Creative Solutions for a Sustainable Development
IFIP Advances in Information and Communication Technology,
2021
DOI:10.1007/978-3-030-86614-3_34
|
|
|
[8]
|
Sales capability creation during new product development – early involvement of sales
Journal of Business & Industrial Marketing,
2021
DOI:10.1108/JBIM-06-2020-0274
|
|
|
[9]
|
Transitioning from technical 2D drawings to 3D models: a case study at defense systems
INCOSE International Symposium,
2019
DOI:10.1002/j.2334-5837.2019.00641.x
|
|
|
[10]
|
A systematic review of design for X techniques from 1980 to 2018: concepts, applications, and perspectives
The International Journal of Advanced Manufacturing Technology,
2019
DOI:10.1007/s00170-019-03418-6
|
|
|
[11]
|
Decision Analysis for Optimal Design Concept: Hybridized Fuzzified Weighted Decision Matrix and Fuzzy TOPSIS Using Design for X Tools
Procedia CIRP,
2019
DOI:10.1016/j.procir.2019.04.323
|
|
|
[12]
|
Transitioning from technical 2D drawings to 3D models: a case study at defense systems
INCOSE International Symposium,
2019
DOI:10.1002/j.2334-5837.2019.00641.x
|
|
|
[13]
|
Decision Analysis for Optimal Design Concept: Hybridized Fuzzified Weighted Decision Matrix and Fuzzy TOPSIS Using Design for X Tools
Procedia CIRP,
2019
DOI:10.1016/j.procir.2019.04.323
|
|
|
[14]
|
Challenges and Enablers for Rapid Product Development
International Journal of Applied Industrial Engineering,
2018
DOI:10.4018/IJAIE.2018010102
|
|
|
[15]
|
The critical success factors for stakeholder management in the restoration of built heritage assets in the UK
International Journal of Building Pathology and Adaptation,
2017
DOI:10.1108/IJBPA-07-2017-0030
|
|
|
[16]
|
Semantic interoperability for an integrated product development process: a systematic literature review
International Journal of Production Research,
2017
DOI:10.1080/00207543.2017.1346314
|
|
|
[17]
|
A Framework for Stakeholder Identification and Classification in Construction Projects
Open Journal of Business and Management,
2014
DOI:10.4236/ojbm.2014.21007
|
|
|
[18]
|
Design for sustainability (DFS): the intersection of supply chain and environment
Journal of Cleaner Production,
2014
DOI:10.1016/j.jclepro.2014.07.021
|
|
|
[19]
|
Analyzing Internal Stakeholders’ Salience in Product Development
Technology and Investment,
2014
DOI:10.4236/ti.2014.52011
|
|
|
[20]
|
Early Stakeholder Involvement in the Project Definition Phase: Case Renovation
ISRN Industrial Engineering,
2013
DOI:10.1155/2013/953915
|
|
|
[21]
|
A survey-based methodology for prioritising the industrial implementation qualities of design tools
Journal of Engineering Design,
2012
DOI:10.1080/09544828.2011.624986
|
|
|