[1]
|
Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times
OPSEARCH,
2023
DOI:10.1007/s12597-022-00609-w
|
|
|
[2]
|
Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times
OPSEARCH,
2022
DOI:10.1007/s12597-022-00609-w
|
|
|
[3]
|
Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems
IFIP Advances in Information and Communication Technology,
2021
DOI:10.1007/978-3-030-85874-2_43
|
|
|
[4]
|
Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems
IFIP Advances in Information and Communication Technology,
2021
DOI:10.1007/978-3-030-85874-2_43
|
|
|
[5]
|
A consecutive heuristic algorithm for balancing a mixed - model assembly line type II using a (W-TAWH) model developed for straight and U-shaped layouts
IOP Conference Series: Materials Science and Engineering,
2020
DOI:10.1088/1757-899X/671/1/012147
|
|
|
[6]
|
Parallel U-shaped assembly line balancing with adaptive MOEA/D hybridized with BBO
Journal of Industrial and Production Engineering,
2020
DOI:10.1080/21681015.2020.1735544
|
|
|
[7]
|
Simulation for Jewelry Production Process Improvement Using Line Balancing: A Case Study
Management Systems in Production Engineering,
2019
DOI:10.1515/mspe-2019-0021
|
|
|
[8]
|
IT Convergence and Security 2017
Lecture Notes in Electrical Engineering,
2018
DOI:10.1007/978-981-10-6451-7_30
|
|
|
[9]
|
A beam search approach for solving type II robotic parallel assembly line balancing problem
Applied Soft Computing,
2017
DOI:10.1016/j.asoc.2017.07.062
|
|
|
[10]
|
Applications of Multi-Criteria and Game Theory Approaches
Springer Series in Advanced Manufacturing,
2014
DOI:10.1007/978-1-4471-5295-8_2
|
|
|
[11]
|
Balancing and sequencing of stochastic mixed-model assembly U-lines to minimise the expectation of work overload time
International Journal of Production Research,
2014
DOI:10.1080/00207543.2014.944280
|
|
|
[12]
|
Literature review of assembly line balancing problems
The International Journal of Advanced Manufacturing Technology,
2014
DOI:10.1007/s00170-014-5944-y
|
|
|
[13]
|
Application of Node Based Coincidence algorithm for flow shop scheduling problems
The 2013 10th International Joint Conference on Computer Science and Software Engineering (JCSSE),
2013
DOI:10.1109/JCSSE.2013.6567318
|
|
|
[14]
|
A taxonomy of line balancing problems and their solutionapproaches
International Journal of Production Economics,
2013
DOI:10.1016/j.ijpe.2012.10.020
|
|
|
[15]
|
A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach
Computers & Industrial Engineering,
2013
DOI:10.1016/j.cie.2012.11.010
|
|
|
[16]
|
Sequencing minimum product sets on mixed-model U-lines to minimise work overload
International Journal of Production Research,
2012
DOI:10.1080/00207543.2011.624559
|
|
|