Journal of Power and Energy Engineering

Journal of Power and Energy Engineering

ISSN Print: 2327-588X
ISSN Online: 2327-5901
www.scirp.org/journal/jpee
E-mail: jpee@scirp.org
"Research on Delay Risks of EPC Hydropower Construction Projects in Vietnam"
written by Mai Sy Hung, Jianqiong Wang,
published by Journal of Power and Energy Engineering, Vol.4 No.4, 2016
has been cited by the following article(s):
  • Google Scholar
  • CrossRef
[1] Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran
Journal of Project Management, 2023
[2] Contractor's Risk Analysis of Engineering Procurement and Construction (EPC) Contracts Using Ontological Semantic Model and Bi-Long Short-Term Memory (LSTM) …
Sustainability, 2022
[3] Dynamic Capabilities, Eastern Relationships, and Competitive Advantages: An Empirical Assessment of Chinese and South Korean International Contractors
Engineering Management …, 2022
[4] Contract Risk Influence Factors in Power Transmission Project in India
2021
[5] Exploring risks associated with Public-Private Partnership pre-Concessions for Hydro Power Projects at Project Development Stage (Project Feasibility, Planning, and …
2021
[6] The impact of relational governance on the adaptability of international contractors: A comparative study between China and Korea
2020
[7] Risk Analysis on the Equipment and Material Procurement Process of Engineering, Procurement, and Construction (EPC) Projects
International Journal of Real …, 2020
[8] Risk management of hydropower projects for sustainable development: a review
2020
[9] Development of an integrated canvas on turnaround strategy
2019
[10] Stakeholder Management for the Success of Construction Projects in Vietnam
2019
[11] Evaluating and classifying the impact of individual risk on the delayed EPC hydropower projects in the developing countries of Asia
2019
[12] Available online www. jsaer. com
2018
[13] The Moderating Effect of Guanxi on the Dynamic Capacity and Competitive Advantage of Chinese International Contractors
Advances in Civil Engineering, 2018
[14] Human resource related factors and engineering, procurement, and construction (EPC) project success
Journal of Financial Management of Property and Construction, 2017
[15] Research on Quality Risk of EPC Hydropower Projects in Vietnam
2017
[16] Impacts of human resource development on engineering, procurement, and construction project success
Built Environment Project and Asset Management, 2017
[17] A Visualization System for Improving Managerial Capacity of Construction Site
ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction. Vol. 34. Vilnius Gediminas Technical University, Department of Construction Economics & Property, 2017
[18] Fuzzy logic based determination of cost overrun of hydro power plant
2016
[19] NGHIÊN CỨU MỨC ĐỘ ẢNH HƢỞNG CỦA CÁC YẾU TỐ RỦI RO ĐẾN CHI PHÍ ĐẦU TƢ XÂY DỰNG CÔNG TRÌNH THỦY ĐIỆN VỪA VÀ NHỎ Ở VIỆT …
B PTNT
Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top