Biography


Prof. John-Paris Pantouvakis

National Technical University of Athens, Greece

Professor


Email: jpp@central.ntua.gr


Qualifications

1990 Ph.D., Department of Computer Science, Construction Information Systems Group, University of Nottingham, U.K.

1987 M.Sc., Department of Information Technology, University of Nottingham, U.K.

1986 M.Eng., Department of Civil Engineering, National Technical University of Athens (NTUA), Greece


Publications (Selected)

  1. P Ralli, A Panas, JP Pantouvakis, D Karagiannakidis. (2020). Investigation and Comparative Analysis of Learning Curve Models on Construction Productivity: The Case of Caisson Fabrication Process. Journal of Engineering, Project, and Production Management 10 (3), 219-230
  2. JP Pantouvakis, A Maravas. (2020). Composite Criticality in Machinery Fleet Management of Construction Projects. MATEC Web of Conferences 312, 02003
  3. P Ralli, A Panas, JP Pantouvakis, D Karagiannakidis. (2020). Comparative evaluation of learning curve models for construction productivity analysis. The 10th International Conference on Engineering, Project, and Production Management, 347-358
  4. C Stasinos, A Panas, JP Pantouvakis, P Ralli, D Karagiannakidis. (2020). Investigation of the Earned Value Method (EVM) Applicability for Construction Operations Affected by the Learning Phenomenon. The 10th International Conference on Engineering, Project, and Production Management, 241-252
  5. P Metallinos, JP Pantouvakis. (2019). BIM Implementation in Greek Public Construction Projects. 5 SENET–A short history to remember, 115
  6. A Panas, JP Pantouvakis. (2018). On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management 18 (4), 301-309
  7. A Maravas, JP Pantouvakis. (2018). A New Approach to Studying Net Present Value and the Internal Rate of Return of Engineering Projects under Uncertainty with Three-Dimensional Graphs. Advances in Civil Engineering 2018
  8. JP Pantouvakis. (2017). Data Analysis and Design of Construction Productivity Efficiency Multipliers. International Conference on Engineering, Project, and Product Management, 119-128
  9. A Panas, JP Pantouvakis. (2015). Efficiency multipliers for construction productivity: A Comparative Evaluation. Organization, technology & management in construction: an international journal Vol.7, No.1, 1186-1196
  10. Lambropoulos, S., Pantouvakis, J.P. and Marinelli, M. (2014) Reforming civil engineering studies in recession times, Procedia - Social and Behavioral Sciences, Vol. 119, pp.776-785,
  11. Pantouvakis, J. P., Panas, A. and Lambropoulos, S. (2014) A simulation environment for construction project manager competence development in construction management, Procedia - Social and Behavioral Sciences, Vol. 119, pp.739-747.
  12. Maravas A., Pantouvakis J.P. and Lambropoulos S. (2014) An Integrated Information System for Monitoring Construction Works, International Journal of Information Technology in Project Management, 5(1), pp. 33-44.
  13. Fragkakis, Ν., Lambropoulos, S., and Pantouvakis, J.P. (2014). Α computer-aided conceptual cost estimating system for prestressed concrete road bridges, International Journal of Information Technology in Project Management, 5(1), pp. 1-13.
  14. Panas A. and Pantouvakis J.P., (2014) Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations, ASCE: Journal of Construction Engineering & Management, 140(1),
  15. Panas A. and Pantouvakis J.P., (2013) Computer simulation and analysis framework for floating caissons construction operations, Automation in Construction, 36, pp. 196-207
  16. Anthopoulos, L.G., Kostavara, E. and Pantouvakis, J.P. (2013) An Effective Disaster Recovery Model for Construction Projects, Procedia ? Social and Behavioral Sciences, Vol. 74, pp. 21-30.
  17. Maravas, A. and Pantouvakis, J.P. (2013) Guidelines for Modelling Time and Cost Uncertainty in Project and Programme Management, Procedia ? Social and Behavioral Sciences, Vol. 74, pp. 203-211.
  18. Panas A. and Pantouvakis J.P. (2013), Simulation-Based Concrete Truck-Mixers Fleet Size Determination for On-Site Batch Plant Operation, Procedia ? Social and Behavioral Sciences, Vol. 74, pp. 459-467.
  19. Maravas A., Pantouvakis J.P. and Lambropoulos S. (2012), Modelling Uncertainty During Cost Benefit Analysis of Transportation Projects with the Aid of Fuzzy Set Theory, Procedia ? Social and Behavioral Sciences, Vol 48, pp 3661 - 3670.
  20. Panas A., Pantouvakis J.P. and Lambropoulos S. (2012) Non-Linear analysis of concrete pavement construction by the use of artificial neural networks, Procedia ? Social and Behavioral Sciences, Vol 48, pp 3671 -3680.
  21. Marinelli M., Lambropoulos S. and Pantouvakis J.P. (2012) Investigation of earthmoving trucks deterioration using discriminant analysis?, International Journal of Project Organisation and Management, 4(4), pp 397-413.
  22. Maravas A. and Pantouvakis J.P. (2012) Project cash flow analysis in the presence of uncertainty in activity duration and cost, International Journal of Project Management, 30(3), pp. 374-384.
  23. Petroutsatou, K., Georgopoulos, E., Lambropoulos, S. and Pantouvakis, J.P. (2012) Early Cost Estimating of Road Tunnel Construction Using Neural Networks, ASCE: Journal of Construction Engineering & Management, 138 (6), pp. 679-687.
  24. Panas, A. and Pantouvakis, J.P. (2011) Multi-attribute regression analysis for concrete pavement productivity estimation, Organization, Technology and Management in Construction: An International Journal, 3(2), pp. 347-353.
  25. Papari, E., Pantouvakis, J.P. & Panas, A. (2011) A framework for the implementation of a knowledge management platform in the Greek construction industry, Russian Journal of Project & Programme Management, 3(27), pp. 178-186.
  26. Maravas A., Pantouvakis J.P. and Lambropoulos S. (2011) Multiple project resource levelling in projects with uncertain activity durations, International Journal of Construction Project Management, 3 (1), pp. 41-57.
  27. Maravas A. and Pantouvakis J.P. (2011) Multi-disciplinary research groups and partnering in attaining a multi-faceted approach to construction scheduling research, International Journal of Construction Project Management, 3 (1), pp. 13-25.
  28. Maravas A. and Pantouvakis J.P. (2011) A Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities, ASCE -Journal of Construction Engineering and Management, 137 (7), pp. 561-564.
  29. Fragkakis, N., Lambropoulos, S. & Pantouvakis, J.P. (2010) A cost estimate method for bridge superstructures using regression analysis and bootstrap, Organization, Management & Technology : An International Journal (OTMC), 2 (2), pp. 182-190
  30. Panas, A. & Pantouvakis, J.P. (2010) An empirical framework for the performance-based evaluation of health and safety's contribution to sustainable construction, Organization, Technology and Management in Construction: An International Journal, 2 (2), pp. 173-181.
  31. Panas, A. and Pantouvakis, J.P. (2010). Evaluating research methodology in construction productivity studies, The Built and Human Environment Review, 3 (1), pp. 63-85.
  32. Panas, Α. and Pantouvakis, J.P. (2010) Comparative analysis of operational coefficients' impact on earthmoving operations, Engineering Construction and Architectural Management, 17 (5), pp. 461-475.
  33. Manoliadis, O., Pantouvakis, J.P. & Christodoulou, S. (2009) Improving Qualifications-based Selection by Use of the Fuzzy-Delphi Method, Construction Management & Economics, 27(4), pp. 373-384
  34. Maravas, A. & Pantouvakis, J.P. (2009) Towards the Application of Fuzzy Project Scheduling in Project Management, International Journal of Engineering and Management (IJEM), 1(1), pp. 55-62
  35. Panas, A., Pantouvakis, J.P. & Lambropoulos, S. (2008) Simulation based analysis of construction operations productivity, Studies in Regional & Urban Planning (SPUR), 11(a), pp.95-108
  36. Marinelli, M., Lambropoulos, S. & Pantouvakis, J.P. (2008) Earthmoving fleet size optimization, Studies in Regional & Urban Planning (SPUR), 11(a), pp.77-93.
  37. Kalfakakou, R., Pantouvakis, J.P. & Xenidis, Y. (2008) Selecting the optimum investment alternative with the use of decision trees: An application, Studies in Regional & Urban Planning, 11(a), pp.53-62
  38. Manoliadis, O., Pantouvakis, J.P.& Tsolas, I. (2008) Compromise programming model in site selection for construction temporary facilities, Operational Research - An International Journal, 7 (3), pp. 381-400.
  39. Pantouvakis, J.P.& Manoliadis, O. (2008) A compromise programming model for site selection of borrow pits, Construction Management & Economics, 26(5), pp. 433-446
  40. Petroutsatou, C., Lambropoulos, S. & Pantouvakis, J.P. (2006) Road Tunnel Early Cost Estimates Using Multiple Regression Analysis, Operational Research ? An International Journal, 6,6, pp. 311-322
  41. Pantouvakis, J.P. & Manoliadis, O.G. (2006) A Practical Approach to Resource - Constrained Project Scheduling, Operational Research ? An International Journal, 6,6, pp. 209-309
  42. Pantouvakis, J.P. (2004) Cluster-based construction management development in Greece, Construction Information Quarterly, 6(3), pp. 105-109.
  43. Manoliadis, O.G. & Pantouvakis, J.P. (2002) Sustainable Construction in Greece: Harmonization and Implementation, Fresenius Environmental Bulletin, 11(10a), pp. 763-768.
  44. Pantouvakis, J.P. (1996) NetExp : A Rule-Based Computer System for Basic Education on Project Planning, Computer Methods in Civil Engineering, 2(1), pp.91-111.
  45. Lambropoulos, S., Manolopoulos, N. & Pantouvakis, J.P. (1996) SEMANTIC : Smart Earth Moving Analysis and Estimation of Cost, Construction Management and Economics, 14, pp.79-92.
  46. O'Brien, M & Pantouvakis, J.P. (1993) A New Approach to the development of Computer-Aided Estimating Systems for the Construction Industry, Construction Management and Economics, 11, pp. 30-44
  47. Pantouvakis, J.P. (1992) Non-Procedural Systems : the key to the Successful Implementation of I.T. in Construction Management, Computer Integrated Construction, 1, pp. 127-136


Profile Details

http://users.ntua.gr/jpp/jpp_en.htm


Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top