Journal of Building Construction and Planning Research
Vol.1 No.1(2013), Paper ID 29576, 7
pages
DOI:10.4236/jbcpr.2013.11001
Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine
Gwang-Hee Kim, Jae-Min Shin, Sangyong Kim, Yoonseok Shin
Department of Plant & Architectural Engineering, Kyonggi University, Suwon-Si, Korea
Department of Architectural Engineering, Graduate School of Kyonggi University, Suwon-Si, Korea
School of Construction Management and Engineering, University of Reading, Reading, UK
Department of Plant & Architectural Engineering, Kyonggi University, Suwon-Si, Korea
Copyright © 2013 Gwang-Hee Kim, Jae-Min Shin, Sangyong Kim, Yoonseok Shin et al. This is
an open access article distributed under the Creative Commons Attribution
License, which permits unrestricted use, distribution, and reproduction in any
medium, provided the original work is properly cited.
How to Cite this Article
Kim, G. , Shin, J. , Kim, S. and Shin, Y. (2013) Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine.
Journal of Building Construction and Planning Research,
1, 1-7. doi:
10.4236/jbcpr.2013.11001.