[1]
|
Cowan, S., Watson, P. and Cowan, S. (2011) An Agile Cost Estimating Methodology for Aerospace Procurement Operations: Genetic Causal Cost CENTRE-ing. www.intechopen.com
|
[2]
|
Winsor Brown, A. (2002) Cyrus Fakharzadeh, CORADMO Extensions of COCOMO II.
|
[3]
|
Boehm, B., Chulani, S. and Eyed, A. (1997) Knowledge Summary: USC-CSE Focused Workshop on Rapid Application Development. USC-CSE Technical Report.
|
[4]
|
Boehm, B.W. (1981) Schedule Estimation Questionnaire. Prentice-Hall, Englewood Cliffs.
|
[5]
|
Scale Factor Description with COCOMO-II. http://en.wikipedia.org/wiki/Scale_factor
|
[6]
|
Khan Zia, Z., Kamal Tipu, S. and Khan Zia, S. (2012) An Effort Estimation Model for Agile Software Development.
www.worldsciencepublisher.org
|
[7]
|
Abbas, S.A., Liao, X.F., Ur Rehman, A., Azam, A. and Abdullah, M.I. (2012) Cost Estimation: A Survey of Well-Known Historic Cost Estimation Techniques. Journal of Emerging Trends in Computing and Information Sciences, 3, 612-636. http://www.cisjournal.org
|
[8]
|
Lang, M., Conboy, K. and Keaveney, S. (2012) Cost Estimation in Agile Software Development Projects.
http://agilemanifesto.org/history.html
|
[9]
|
Barbosa, C.M., Loubach, D.S. and Marques, A. (2010) An Estimation Model to Measure Computer Systems Development Based on Hardware and Software. http://mdp.ivv.nasa.gov
|
[10]
|
Clark, B., Devnani-Chulani, S. and Boehm, B. (1998) Calibrating the COCOMO II Post-Architecture Model.
http://sunset.usc.edu/Research_Group/Sunita/down/calpap.pdf
|
[11]
|
Talby, D. and Dubinsky, Y. (2005) Governance of an Agile Software Project.
http://domino.research.ibm.com/library/cyberdig.nsf/
|
[12]
|
Attarzadeh, I. and Hock Ow, S. (2009) Software Development Effort Estimation Based on a New Fuzzy Logic Model. International Journal of Computer Theory and Engineering, 1, 1793-8201.
|