Assessment of Profit of a Two-Stage Deteriorating Linear Consecutive 2-out-of-3 Repairable System

Abstract

Most of the researches on profit and cost evaluation of redundant system focus on the effect of failure and repair on revenue generated. However, as these systems continue to work, their strength gradually deteriorates. Where such deterioration occurs, minor and major maintenance is employed to remedy the deterioration. Little or no attention is paid on the effect of deterioration on the impact of deterioration and their maintenance on the revenue generated. In this paper, we study the profit generated of two-stage deteriorating linear consecutive 2-out-of-3 system. Failure, repair and deterioration time are assumed exponential. The explicit expressions of availability, busy period of a repairman and profit function are derived using Kolmogorov’s forward equations method. Various cases are analyzed graphically to investigate the effect of deterioration parameters such as slow deterioration, fast deterioration, and their maintenance such as minor and major minimal maintenance on profit generated.

Share and Cite:

Yusuf, I. and Koki, F. (2013) Assessment of Profit of a Two-Stage Deteriorating Linear Consecutive 2-out-of-3 Repairable System. Journal of Applied Mathematics and Physics, 1, 21-27. doi: 10.4236/jamp.2013.13005.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] R. K. Bhardwaj and S. Chander, “Reliability and Cost Benefit Analysis of 2-out-of-3 Redundant System with General Distribution of Repair and Waiting Time,” DIAS Technology Review: The International Journal for Business & IT, Vol. 4, No. 1, 2007, pp. 28-35.
[2] S. Chander and R. K. Bhardwai, “Reliability and Economic Analysis of 2-out-of-3 Redundant System with Priority to Repair,” African Journal of Mathematics and Computer Science Research, Vol. 2, No. 11, 2009, pp. 230-236.
[3] R. K. Bhardwai and S. C. Malik, “MTSF and Cost Effectiveness of 2-out-of-3 Cold Standby System with Probability of Repair and Inspection,” International Journal of Engineering Science and Technology, Vol. 2, No. 1, 2010, pp. 5882-5889.
[4] K. Wang, C. Hsieh and C. Liou, “Cost Benefit Analysis of Series Systems with Cold Standby Components and a Repairable Service Station,” Journal of Quality Technology and Quantitative Management, Vol. 3, No. 1, 2006, pp. 77-92.
[5] K. M. El-Said, “Cost Analysis of a System with Preventive Maintenance by Using Kolmogorov’s forward Equations Method,” American Journal of Applied Sciences, Vol. 5, No. 4, 2008 , pp. 405-410. doi:10.3844/ajassp.2008.405.410
[6] M. Y. Haggag, “Cost Analysis of a System Involving Common Cause Failures and Preventive Maintenance,” Journal of Mathematics and Statistics, Vol. 5, No. 4, 2009, pp. 305-310. doi:10.3844/jmssp.2009.305.310
[7] K. H. Wang and C. C. Kuo, “Cost and Probabilistic Analysis of Series Systems with Mixed Standby Components,” Applied Mathematical Modelling, Vol. 24, 2000, pp. 957-967. doi:10.1016/S0307-904X(00)00028-7
[8] K. C. Wang, Y. C, Liou and W. L. Pearn, “Cost Benefit Analysis of Series Systems with Warm Standby Components and General Repair Time,” Mathematical Methods of Operation Research, Vol. 61, 2005, pp. 329-343. doi:10.1007/s001860400385
[9] M. A. Hajeeh, “Availability of a System with Different Repair Options,” International Journal of Mathematics in Operational Research, Vol. 4, No. 1, 2012, pp. 41-55. doi:10.1504/IJMOR.2012.044472
[10] H. S. Fathabadi and M. Khodaei, “Reliability Evaluation of Network Flows with Stochastic Capacity and Cost Constraint,” International Journal of Mathematics in Operational Research, Vol. 4, No. 4, 2012, pp. 439-452. doi:10.1504/IJMOR.2012.048904

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.